Docket No. 50-323 July 11, 1994 Hr. Gregory H. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P. 0.
Box 770000 San Francisco, California 94177
Dear Hr. Rueger:
SUBJECT:
INTERIM APPROVAL OF ALTERNATIVE TESTING METHOD FOR INSERVICE TESTING PROGRAM RE(UIQEHENT FOR DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.
2 (TAC NO. H89720)
Your June 25, 1994, letter requested temporary relief from -ASHE Section XI cold shutdown full-stroke testing of residual heat removal system check valves
- 8730A, 8730B,
- 8742A, and 8742B until you can perform full-stroke tests during the next Unit 2 cold shutdown.
We approve your requested alternative for an interim period until the next Unit.2 cold shutdown pursuant to 10 CFR 50.55a(f)(4)(iv).
The approval is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The enclosed safety evaluation contains our evaluations and conclusions for this issue.
Theodore R. quay, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/enclosure:
See next page 9407200i22 9407ii PDR ADOCK 05000323 PDR
- See revious concurrence DISTRIBUTION:/
Docket File v'Russel l/FHiragl i a ERossi JRoe DFoster-Curseen
- GZech, PSHB Tguay GHill (2)
OPA JHitchell, EDO NRC Local PDRs RZimmerman JLieberman EAdensam HPadovan OGC EJordan ACRS (10)
OC/LFDCB
- KPerkins, RIV/WCFO OFC LA:DRP PH'P 4
EHEB*
EHEB BC:EHEB D:PD4-2 NAME DFoste u s n
HPadovan:
k PCam bell GJohnso Tgua DATE
/
94
~ / 5/94 7/6 94
/ I /94
/
94 7)l 94 OFFICIAL RECORD COPY Document Name:
DC89720.REL INC BL1E Ci80$ COP
0'
s 4
'Docket No. 50-323 3uly 11, 1994 Hr. Gregory H. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P. 0.
Box 770000 San Francisco, California 94177
Dear Hr. Rueger:
SUBJECT:
INTERIM APPROVAL OF ALTERNATIVE TESTING METHOD FOR INSERVICE TESTING PROGRAM REQUIREMENT FOR DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.
2 (TAC NO. H89720)
Your June 25, "1994, letter requested temporary relief from ASHE Section XI cold shutdown full-stroke testing of residual heat removal system check valves
- 8730A, 8730B,
- 8742A, and 8742B until you can perform full-stroke tests during the next Unit 2 cold shutdown.
We approve your requested alternative for an interim period until the next Unit 2 cold shutdown pursuant to 10 CFR 50.55a(f)(4)(iv).
The approval is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The enclosed safety evaluation contains our evaluations and conclusions for this issue.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page
- See revious concurrence Sincerely, 2 -~
Theodore R.
Quay, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation DISTRIBUTION
'/'ocket File /
WRussell/FHiraglia ERossi JRoe DFoster-Curseen
- GZech, PSHB TQuay GHill (2)
OPA JHitchell, EDO OFC LA:DRPW PM:P 4
EHEB*
EHEB BC:EHEB D:PD4-2 DATE DFoster-Cukseeo
/'.
94 HPadovan:
k
/ >/94 PCam bell GJohnso 7/6/94 7/
/94 '94 TQuay l Jl 94 OFFICIAL RECORD COPY Document Name:
DC89720.REL,
4
~p,'0 At0g
+
C
/g <<>>**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 July 11, 1994 Docket No. 50-323 Mr. Gregory H. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P. 0.
Box 770000 San Francisco, California 94177
Dear Mr. Rueger:
SUBJECT:
INTERIM APPROVAL OF ALTERNATIVE TESTING METHOD FOR INSERVICE TESTING PROGRAM RE(UIREHENT FOR DIABLO CANYON NUCLEAR POWER PLANT, UNIT NO.
2 (TAC NO. H89720)
Your June 25, 1994, letter requested temporary relief from ASHE Section XI co'Id shutdown full-stroke testing of residual heat removal system check valves
- 8730A, 8730B,
- 8742A, and 8742B until you can perform full-stroke tests during the next Unit 2 cold shutdown.
We approve your requested alternative for an interim period until the next Unit 2 cold shutdown pursuant to 10 CFR 50.55a{f)(4)(iv).
,he aI proval is authorized by law, will not endanger life or property or the common defense and security, and.is otherwise in the public interest, giving due consideration to the burden upon the.licensee that could result if the requirements were imposed on the facility.
The enclosed safety evaluation contains our evaluations and conclusions for this issue.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Theodore R. quay, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Hr. Gregory M. Rueger Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California '3424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Hs.
Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448
'f t1s. Jacquelyn C. Wheeler P. 0.
Box 164 Pismo Beach, California 93448 Managing Editor The Count Tele ram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Nr. Truman Burns Hr. Robert Kinosi an California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Nr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower E Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Hr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Christopher J. Warner, Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Nr. John Townsend Vice President and Plant Hanager Diablo Canyon Power Plant P. 0.
Box 56 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Honterey, California 93940
~
~
~