Informs That Arrangements Made for Administration of Written Licensing Exams Per 940613 Telcon in Response to NRC Insp Repts 50-275/94-19 & 50-323/94-19.Requests Addl Info to Prepare for Exams
ML16342C591
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/15/1994
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
RTR-NUREG-1021 NUDOCS 9406220055
Download: ML16342C591 (14)


See also: IR 05000275/1994019

Text

FORD I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SIZE:

esponse

NOTES:

ACCESSION NBR:9406220055

DOC.DATE: 94/06/15

NOTARIZED:

NO

DOCKET I

ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant,

Uni:t 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas &'lectric Co.

SUBJECT:

informs that arrangements

made for administration of written

licensing examinations

per

940613 telcon in response

to

NRC

insp of util as ref in. insp repts

50-275/94-19

&

50-323/94-19

& requests

addi info to prepare for exams.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation

RECIPIENT

ID CODE/NAME

PDIV-3 PD

EXTERNAL: EG&G/BRYCEIJ.H.

NSIC

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/PMAS/ILPB1

NUDOCS-ABSTRACT

OGC/HDS3

RES/HFB

COPIES

LTTR ENCL

RECIPIENT

ID CODE/NAME

MILLER,M

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/PMAS/IRCB-E

OE ~D

REG FIL

02

RGN4

FILE

01

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

'0

'0

M

NOTE TO .kLL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065i TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS ) OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

~

i

UN IT E D STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE. SUITE 400

ARLINGTON,TEXAS 76011 8064

JUN

I 5 894

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Pacific Gas

and Electric Company

Nuclear

Power Generation,

B14A

ATTN:

Gregory

M. Rueger,

Senior

Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room

1451

P.O.

Box 770000

San Francisco,

California

94177

SUBJECT:

NRC

INSPECTION REPORT 50-275/94-19;

50-323/94-19

In a telephone

conversation

on June

13,

1994,

between

Mr.. Ryan Lantz and Mr.

Jim Melsch,

arrangements

were

made for the administration of licens'ing

examinations

at the Diablo Canyon Nuclear

Power Station.

The written examinations

are scheduled for October 24,

1994,

and the operating

tests

are scheduled for October 24-28,

1994.

Your staff will be given

an

opportunity to review the licensing examinations

in accordance

with the

guidelines in Revision

7 of NUREG-1021,

"Operator Licensing Examiner

Standards,"

(ES-201,

Attachment 4) during the week of October

10,

1994.

To prepare

the examinations

and meet the above schedule, it will be necessary

for your staff to furnish the reference materials identified in Attachment

2

of ES-201

by July 25,

1994.

Any delay in receiving approved

and indexed

reference material or the submittal of inadequate

or incomplete reference

material

may result in the examinations

being rescheduled.

The

NRC will prepare

and administer the written examinations

in accordance

with ES-401

and

ES-402 of NUREG-1021.

In order to conduct the requested

examinations, it will be necessary

for your staff to provide adequate

space

and accommodations

on the date noted

above.

The NRC's guidelines for

administering the written examinations

are described

in ES-402,

Attachment l.

The

NRC will prepare

and administer the operating

tests

in accordance

with

ES-301

and

ES-302 of NUREG-1021.

In order to conduct the requested

operating

tests, it will be necessary

for your staff to make the simulation facility

available

on the dates

noted

above.

Your staff should retain the original

simulator performance

data (e.g.,

system pressures,

temperatures,

and levels)

generated

during the dynamic operating tests until the examination results

are

final.

I

fg

9406220055

940bi5

PlN

ADOCK 05OD0275

Q

'PDR

+0)

~"

i.

Pacific

Gas

and Electric Company

Attachment

2 of ES-402

and Attachment

1 of ES-302 contain

a number of NRC

policies

and guidelines that will be in effect while the written examination

and operating tests

are being administered.

Your staff should submit preliminary reactor operator

and senior reactor

operator license applications

and waiver requests

at least

30 days before the

first examination date

so that the

NRC will be able to review the applications

and the medical certifications

and evaluate

any requested

waivers.

If the

applications

are not received at least

30 days before the examination date,

a

postponement

may

be necessary.

Final, signed applications certifying that all

training has

been

completed

should

be submitted at least

14 days before the

first examination date.

This request

is covered

by Office of Management

and Budget

(OHB) Clearance

Number 3150-0101,

which expires

Octobe'r 31,

1995.

The estimated

average

burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,

including gathering,

copying

and mailing the

required material.

Send

comments

regarding this burden estimate

or any other

aspect of this collection of information, including suggestions

for reducing

this burden,

to the Information and Records

Management

Branch,

MNBB-7714,

Division of Information Support Services,

Office of Information Resources

Management,

U.S. Nuclear Regulatory

Commission,

Washington,

D.C. 20555;

and to

the Paperwork Reduction Project

(3150-0101),

Office of Information and

Regulatory Affairs, NEOB-3019, Office of Management

and Budget,

Washington,

D.C. 20503.

Thank you for your cooperation

in this matter.

Jim Welsch

has

been

advised of

the policies

and guidelines referenced

in this letter.

If you have

any

questions

regarding the NRC's examination

procedures

and guidelines,

please

contact

Ryan Lantz at (817) 860-8157,

or John Pellet at (817) 860-8159.

Sincerely,

/os.

Thomas

P.

Gwynn, Director

Division of Reactor Safety

CC:

Sierra Club California

ATTN:

Dr. Richard

Ferguson

.Energy Chair

6715 Rocky Canyon

Creston, California

93432

San Luis Obispo

Mothers for Peace

ATTN:

Hs.

Nancy Culver

P.O.

Box 164

Pismo

Beach, California

93448

Pacific

Gas

and Electric Company

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo

Beach, California

93448

The County Telegram Tribune

ATTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo, California

93406

San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo, California

93408

California Public Utilities Commission

ATTN:

Mr. Truman Burns)Mr. Robert Kinosian

505 Van Ness,

Rm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington, Esq.

Legal

Counsel

857 Cass Street,

Suite

D

Monterey, California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento,

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West

A Street,

Suite

700

San Diego, California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J. Warner,

Esq.

P.O.

Box 7442

San Francisco,

California

94120

<<

Pacific Gas

and Electric Company

Diablo Canyon Nuclear

Power Plant

ATTN:

John Townsend,

Vice President

and Plant Manager

P.O.

Box 56

Avila Beach, California

93424

Pacific Gas

and Electric Company

bcc to

DMB (IEOl)

bcc distrib. by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

J.

L. Pellet Reading File

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

MNBB 4503

RIV:0*

RELantz

94

RIV:BC:0*

JLPellet

DD:DRS

ATHowell

Cn

94

D:DRP

ABB

ch

D:DRS

TPGwynn

"Previousl

concurred

Pacific Gas

and Electric Company

@bcc".to.'; DMB;-:(IE01') "'--'"

bcc distrib. by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

RIV File

Leah Tremper,

OC/LFDCB,

MS:

J.

L. Pellet

Reading File

Resident

Inspector

MIS System

Senior Project Inspector

(DRP/E,

WCFO)

Branch, Chief (DRP/TSS)

MNBB 4503

RIV:0*

RELantz

RIV:BC:0*

JLPellet

DD:DRS

ATHowell

0:DRP

ABB

ch

0:DRS

TPGw nn

94

  • Previously concurred

94

94

I

94

~: