ML16342C591
| ML16342C591 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/15/1994 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| References | |
| RTR-NUREG-1021 NUDOCS 9406220055 | |
| Download: ML16342C591 (14) | |
See also: IR 05000275/1994019
Text
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SIZE:
esponse
NOTES:
ACCESSION NBR:9406220055
DOC.DATE: 94/06/15
NOTARIZED:
NO
DOCKET I
ACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant,
Uni:t 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
GWYNN,T.P.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER,G.M.
Pacific Gas &'lectric Co.
SUBJECT:
informs that arrangements
made for administration of written
licensing examinations
per
940613 telcon in response
to
NRC
insp of util as ref in. insp repts
50-275/94-19
&
50-323/94-19
& requests
addi info to prepare for exams.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation
RECIPIENT
ID CODE/NAME
PDIV-3 PD
EXTERNAL: EG&G/BRYCEIJ.H.
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS3
RES/HFB
COPIES
LTTR ENCL
RECIPIENT
ID CODE/NAME
MILLER,M
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/PMAS/IRCB-E
OE ~D
REG FIL
02
RGN4
FILE
01
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
'0
'0
M
NOTE TO .kLL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065i TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS ) OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
~
i
UN IT E D STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE. SUITE 400
ARLINGTON,TEXAS 76011 8064
JUN
I 5 894
Dockets:
50-275
50-323
Licenses:
DPR-82
Pacific Gas
and Electric Company
Nuclear
Power Generation,
B14A
ATTN:
Gregory
M. Rueger,
Senior
Vice
President
and General
Manager
Nuclear
Power Generation
Bus. Unit
77 Beale Street,
Room
1451
P.O.
Box 770000
San Francisco,
94177
SUBJECT:
NRC
INSPECTION REPORT 50-275/94-19;
50-323/94-19
In a telephone
conversation
on June
13,
1994,
between
Mr.. Ryan Lantz and Mr.
Jim Melsch,
arrangements
were
made for the administration of licens'ing
examinations
at the Diablo Canyon Nuclear
Power Station.
The written examinations
are scheduled for October 24,
1994,
and the operating
tests
are scheduled for October 24-28,
1994.
Your staff will be given
an
opportunity to review the licensing examinations
in accordance
with the
guidelines in Revision
7 of NUREG-1021,
"Operator Licensing Examiner
Standards,"
(ES-201,
Attachment 4) during the week of October
10,
1994.
To prepare
the examinations
and meet the above schedule, it will be necessary
for your staff to furnish the reference materials identified in Attachment
2
of ES-201
by July 25,
1994.
Any delay in receiving approved
and indexed
reference material or the submittal of inadequate
or incomplete reference
material
may result in the examinations
being rescheduled.
The
NRC will prepare
and administer the written examinations
in accordance
with ES-401
and
ES-402 of NUREG-1021.
In order to conduct the requested
examinations, it will be necessary
for your staff to provide adequate
space
and accommodations
on the date noted
above.
The NRC's guidelines for
administering the written examinations
are described
in ES-402,
Attachment l.
The
NRC will prepare
and administer the operating
tests
in accordance
with
and
ES-302 of NUREG-1021.
In order to conduct the requested
operating
tests, it will be necessary
for your staff to make the simulation facility
available
on the dates
noted
above.
Your staff should retain the original
simulator performance
data (e.g.,
system pressures,
temperatures,
and levels)
generated
during the dynamic operating tests until the examination results
are
final.
I
fg
9406220055
940bi5
PlN
ADOCK 05OD0275
Q
'PDR
+0)
~"
i.
Pacific
Gas
and Electric Company
Attachment
2 of ES-402
and Attachment
1 of ES-302 contain
a number of NRC
policies
and guidelines that will be in effect while the written examination
and operating tests
are being administered.
Your staff should submit preliminary reactor operator
and senior reactor
operator license applications
and waiver requests
at least
30 days before the
first examination date
so that the
NRC will be able to review the applications
and the medical certifications
and evaluate
any requested
waivers.
If the
applications
are not received at least
30 days before the examination date,
a
postponement
may
be necessary.
Final, signed applications certifying that all
training has
been
completed
should
be submitted at least
14 days before the
first examination date.
This request
is covered
by Office of Management
and Budget
(OHB) Clearance
Number 3150-0101,
which expires
Octobe'r 31,
1995.
The estimated
average
burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response,
including gathering,
copying
and mailing the
required material.
Send
comments
regarding this burden estimate
or any other
aspect of this collection of information, including suggestions
for reducing
this burden,
to the Information and Records
Management
Branch,
MNBB-7714,
Division of Information Support Services,
Office of Information Resources
Management,
U.S. Nuclear Regulatory
Commission,
D.C. 20555;
and to
the Paperwork Reduction Project
(3150-0101),
Office of Information and
Regulatory Affairs, NEOB-3019, Office of Management
and Budget,
D.C. 20503.
Thank you for your cooperation
in this matter.
Jim Welsch
has
been
advised of
the policies
and guidelines referenced
in this letter.
If you have
any
questions
regarding the NRC's examination
procedures
and guidelines,
please
contact
Ryan Lantz at (817) 860-8157,
or John Pellet at (817) 860-8159.
Sincerely,
/os.
Thomas
P.
Gwynn, Director
Division of Reactor Safety
CC:
ATTN:
Dr. Richard
Ferguson
.Energy Chair
6715 Rocky Canyon
Creston, California
93432
San Luis Obispo
Mothers for Peace
ATTN:
Hs.
Nancy Culver
P.O.
Box 164
Pismo
Beach, California
93448
Pacific
Gas
and Electric Company
Ms. Jacquelyn
C. Wheeler
P.O.
Box 164
Pismo
Beach, California
93448
The County Telegram Tribune
ATTN:
Managing Editor
1321 Johnson
Avenue
P.O.
Box 112
San Luis Obispo, California
93406
San Luis Obispo County Board of
Supervisors
ATTN:
Chairman
Room 370
County Government
Center
San Luis Obispo, California
93408
California Public Utilities Commission
ATTN:
Mr. Truman Burns)Mr. Robert Kinosian
505 Van Ness,
Rm.
4102
San Francisco,
94102
Diablo Canyon
Independent
Safety Committee
Attn:
Robert
R. Wellington, Esq.
Legal
Counsel
857 Cass Street,
Suite
D
Monterey, California
93940
Radiologic Health Branch
State
Department of Health Services
ATTN:
Mr. Steve
Hsu
P.O.
Box 942732
Sacramento,
94234
State of California
ATTN:
Mr. Peter
H. Kaufman
Deputy Attorney General
110 West
A Street,
Suite
700
San Diego, California
92101
Pacific Gas
and Electric Company
ATTN:
Christopher J. Warner,
Esq.
P.O.
Box 7442
San Francisco,
94120
<<
Pacific Gas
and Electric Company
Diablo Canyon Nuclear
Power Plant
ATTN:
John Townsend,
Vice President
and Plant Manager
P.O.
Box 56
Avila Beach, California
93424
Pacific Gas
and Electric Company
bcc to
DMB (IEOl)
bcc distrib. by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
J.
L. Pellet Reading File
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
MNBB 4503
RIV:0*
RELantz
94
RIV:BC:0*
JLPellet
DD:DRS
ATHowell
Cn
94
D:DRP
ch
D:DRS
TPGwynn
"Previousl
concurred
Pacific Gas
and Electric Company
@bcc".to.'; DMB;-:(IE01') "'--'"
bcc distrib. by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
RIV File
Leah Tremper,
OC/LFDCB,
MS:
J.
L. Pellet
Reading File
Resident
Inspector
MIS System
Senior Project Inspector
(DRP/E,
WCFO)
Branch, Chief (DRP/TSS)
MNBB 4503
RIV:0*
RELantz
RIV:BC:0*
JLPellet
DD:DRS
ATHowell
0:DRP
ch
0:DRS
TPGw nn
94
- Previously concurred
94
94
I
94
~: