ML16342C423
Jump to navigation
Jump to search
| ML16342C423 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16342C423 (1) | |
Text
FSAR FIG. 10.5 - 5 HEATER DRAIN & VENTS UNIT NO. 2 SHEET 1 OF 2 VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).
REVISED PER UCR 99-UFSAR-1541 16.6 16.6