ML16342B998
| ML16342B998 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/28/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A154 | List: |
| References | |
| NUDOCS 9307140003 | |
| Download: ML16342B998 (8) | |
Text
FORD I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9307140003 DOC.DATE: 93/06/28 NOTARIZED: NO DOCKET I FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION MILLER,LoFo Region 5 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION RUEGERiG.M.
Pacific Gas a Electric Co.
SUBJECT:
Forwards exam rept 50-275/OL-93-01 on 930521-28.Violations noted. Encourages staff to ensure weaknesses are remedied 6
not widespread.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS NRR/DRCH/HOLB10 RGN5 FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PETERSONiS RCg HHFBPT EG FILE 02 NSIC COPIES LTTR ENCL 1
1 1
0 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhf P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAhIE FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 9
~S AEQUI
~4
~o Cy nO I
C Vl O~
+**<<+
Docket Nos.
50-275II'323 UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIAIANE WAlNUTCREEK, CAUFORNIAS4596-5368 JuN 2 8 1993 Pacific Gas 8 Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, CA 94177 Attention: Gregory M. Rueger Senior Vice President and General Manager Nuclear Power Generation Business Unit
Subject:
Initial Reactor Operator and Senior Reactor Operator Licensing Examinations of Diablo Canyon Power Plant Units 1 and 2.
During the period Hay 21-28, 1993, the NRC administered initial operator licensing examinations to five Reactor Operators (ROs) and six Senior Reactor Operator (SROs) who had applied for licenses to operate your Diablo Canyon Nuclear Power Plant Units 1 and 2.
As a result of these examinations, five SROs and five ROs met the minimum qualification requirements for licensing.
One SRO candidate failed the written portion of the examination.
After the examinations on Hay 28, 1993, the preliminary findings were discussed with members of your staff as detailed in Examination Report, 50-275/OL-93-01 (Enclosure 1).
The NRC examiner and the contr act examiners noted that the Diablo Canyon training staff provided high quality technical support during the validation of the examination material.
During the subsequent review of the written examinations, the examiners identified two areas of generic weaknesses.
These identified weaknesses were in the area of mitigation of core damage and in the administrative knowledge of facility requirements.
We encourage your staff to ensure these weaknesses are remedied and are not widespread.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures wi 11 be placed in the NRC's Public Document Room.
If-you have questions or comments concerning this examination, please contact Mr. P. Morri11 of my staff at (510) 975-0293.
Sincerely, 9307l40003 930628 PDR ADOCK 05000275 V
PDR.
L
. Hiller Jr.,
Reactor Safety Br ch LEfz
JUN 8 8 lggg
Enclosures:
l.
Examination Report 50-275/OL-93-01 2.
Examinations and Answer Keys (SRO/RO) 3.
Simulation Facility Report cc w/enclosures (1), (2), and (3):
T. Martin, Training Manager, Diablo Canyon cc w/enclosure (1) only:
Dr. Richard Ferguson, Energy Chair, Sierra Club California Ns.
Nancy Culver, San Luis Obispo Mothers for Peace Ns. Jacquelyn C. Wheeler Managing Editor, The County Telegram Tribune
- Chairman, San Luis Obispo County Board of Supervisors Mr. Truman Burns, California Public Utilities Commission Nr. Robert Kinosian, California Public Utilities Commission Robert R. Wellington, Esq.,
Diablo Canyon Independent Safety Committee Nr. Steve Hsu, Radiologic Health Branch, State Department of Health Services Nr. Peter H. Kaufman, Deputy Attorney General, State of California Michael N. Strumwasser, Esq.,
Special Assistant Attorney General, State of California Christopher J. Warner, Esq.,
PG8E Mr. John Townsend, Vice President and Plant Manager, Diablo Canyon
gUN 2 8 1993 bcc w/enclosures (1), (2),
and (3):
D. Pereira, RV R. Cross, RV (2 copies) bcc w/enclosure (1) only:
M. Ring, NRR/LOLB S. Peterson, NRR/PD5 B. Faulkenberry, RV K. Perkins, RV L. Miller, RV P. Johnson, RV P. Horrill, RV S. Richards, RV H. Hiller, SRI, Diablo'anyon K. Faris, PNL J.
Bumgardner, PNL ES NO S
C S
0 Y
S PEREIRA ~P NORRILL QM MILLER 6//d /93 6/ ( /93 6/1 /9 ES NO NO