ML16342B990
| ML16342B990 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/20/1999 |
| From: | Steven Bloom NRC (Affiliation Not Assigned) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A900 | List: |
| References | |
| GL-96-05, TAC-M97040, TAC-M97041, NUDOCS 9909240004 | |
| Download: ML16342B990 (8) | |
Text
gP,R REGS (4
~o Cy C0I
++!
I i +0
++*++'NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 September 20, 1999 Mr. Gregory M. Rueger Senior Vice President and General Manager Pacific Gas and Electric Company Diablo Canyon Nuclear Power Plant P. O. Box 3 Avila Beach, CA 93424
SUBJECT:
SAFETY EVALUATIONOF LICENSEE RESPONSE TO GENERIC LETTER (GL) 96-05, DIABLOCANYON POWER PLANT, UNITS 1 AND 2 (TAC NOS.
, M97040 AND M97041)
Dear Mr. Rueger:
On September 18, 1996, the NRC issued Generic Letter (GL) 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," requesting each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current program, to verify on a periodic basis that safety-related motor-operated valves (MOVs) continue to be capable of performing their safety functions within the current licensing bases of the facility.
On November 18, 1996, Pacific Gas and Electric Company submitted a response to GL 96-05 notifying the NRC that it would implement the requested MOV periodic verification program at Diablo Canyon Power Plant, Units 1 and 2. The licensee also provided a summary description of the MOV periodic verification program planned to be implemented at Diablo Canyon.
In a letter dated September 8, 1998, the licensee updated its commitment to GL 96-05.
On March 25, 1999, the licensee provided a response to a request for additional information regarding GL 96-05 forwarded by the NRC staff on December 29, 1998.
The NRC has reviewed the submittals and applicable NRC inspection reports for the MOV program at Diablo Canyon.
Based on our understanding of the licensee's commitment to all three phases of the Joint Owners Group (JOG) program on MOVperiodic verification, the NRC staff finds that the licensee has established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at Diablo Canyon. As discussed in the enclosed safety evaluation (SE), the NRC staff concludes that the licensee is adequately addressing the actions requested in GL 96-05. The NRC staff may conduct inspections to verify the implementation of the MOVperiodic verification program is in accordance with the licensee's commitments; this SE; the SE dated October 30, 1997, on the JOG program on MOV periodic verification; and the SE dated April 14, 1998, on the Westinghouse Owners Group methodology for ranking IVIOVs by their safety significance.
909240004 990920 PDR ADQCK 05000275 P
K I
c I
I 1
I h
Mr. Gregory M. Rueger September 20, 1999 Ifyou have any questions regarding this matter, please contact me at (301) 415-1313.
Sincerely, Docket Nos. 50-275 and 50-323
Enclosure:
Safety Evaluation cc w/encl: See next page ORIG.
SIGNED BY Steven D. Bloom, Project Manager Project Directorate IV8 Decommissioning Division of Licensing Project Management
,Office of Nuclear Reactor Regulation DISTRIBUTION:
LDocket---~
PUBLIC PDIV-2 Reading S Richards ACRS OGC LSmith, Region IV DTerao TScarbrough STingen
?
o receive a co o
is ocumen, in ica e in e
ox OFFICE PDIV-2/PM C PDIV-2/LA C PDIV-2/SC, NAME S lo DATE 9 /
/99 Eeo 9/ I3 /99 SDembek 9 /~/99 DOCUMENT NAME: G:>PDIV-2>DiabloCanyonhdc97040.se OFFICIALRECORD'COPY
0 I
- I 4
tt
.,Pr. Gregory M. Rueger Ifyou have any questions regarding this matter, please contact me at (301) 415-1313.
Sincerely, Steven D. Bloom, Project Manager Project Directorate IV8 Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 323
Enclosure:
Safety Evaluation cc w/encl: See next page
a
'iablo Canyon Power Plant, Units 1 and 2
~
I
~
CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. O. Box 369 Avila Beach, California 93424 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Dr. Richard Ferguson, Energy Chair Sierra Club California.
1100 11th Street, Suite'311 Sacramento, California 95814 Christopher J. Warner, Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D Monterey, California 93940
~
~
,'lg