Text
cgA Agc+
c~
C~
0
Er
rl
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011-8064
3P
i599
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B32
77 Beale Street, 32nd Floor
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-10; 50-323/99-10
Dear Mr. Rueger:
This refers to the inspection conducted on May 29 through July 10, 1999, at the Diablo Canyon
Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results of this
inspection.
During the 6-week period covered by this inspection period, your conduct of activities at the
Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious
operations, sound engineering and maintenance practices, and good radiation protection
support.
Section M8.1 of this inspection report discusses
an issue in which Diesel Engine Generator 1-1
was degraded for 18 days because
of a loose terminal lug. Engineers used unverified
assumptions
in determining the initial cause of failure of the diesel generator to achieve rated
voltage in the required time. In addition, Operations work control personnel deferred a system
engineering request for accelerated testing for 2 weeks despite a system engineering concern
that an intermittent fault existed within Diesel Engine Generator 1-1. This issue revealed
weaknesses
in your corrective action program and interdepartmenta1
communications.
Based on the results of this inspection, the NRC has determined that four Severity Level IV
violations of NRC requirements occurred.
These violations are being treated as noncited
violations, consistent with Appendix C of the Enforcement Policy. These noncited violations are
described in the subject inspection report.
If you contest the violation or severity level of these
noncited violations, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document
Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S.
Nuclear Regulatory Commission, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas
76011, the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC 20555-0001; and the NRC Resident Inspector at the Diablo Canyon Nuclear
Power Plant, Units 1 and 2, facility.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure, and your response,
if requested,
willbe placed in the NRC Public Document Room.
990806005i
9'90730
ADOCK 05000275
9
Pacific Gas and Electric Company
-2-
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
Docket Nos.:
50-275
50-323
License Nos.: DPR-80
DPR-82
Ken E.
rockman, Director
Division of Reactor Projects
Enclosure:
NRC Inspection Report No.
50-275/99-10; 50-323/99-'I 0
cc w/enclosure:
Dr. Richard Ferguson
Energy Chair
1100 lith Street, Suite 311
Sacramento,
California 95814
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, California 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
San Luis Obispo, California 93408
Mr. Truman Burns>Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
Pacific Gas and Electric Company
-3-
Robert R. Wellington, Esq.
Legal Counsel
Diablo Canyon Independent Safety Committee
857 Cass Street, Suite D
Monterey, California 93940
Mr. Steve Hsu
Radiologic Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento,
California 94234
Christopher J. Warner, Esq.
Pacific Gas and Electric Company
P.O. Box 7442
San Francisco, California 94120
David H. Oatley, Vice President
Diablo Canyon Operations and Plant Manager
Diablo Canyon Nuclear Power Plant
P.O. Box 3
Avila Beach, California 93424
Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, California 93406
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Frank Talbot (FXT)
E-Mail report to Richard Correia (RPC)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:QDC>DC910RP-DLP.wpd
To receive co
of document, Indicate In box: "C" ~ Co
without enclosures
"E" = Co
with enclosures "N" = No co
RIV:RI
SRI
SPE:DRP/E
C:DRS/P
DGAcke
7/
/99
C:DRP/E
LJSmith
7
/99
JASloa
~
DL roul
GAPic
7 5/99
7/
99
7/.
99
D:DRP
KEBro
m n
7+0/99
OFFICIAL RECORD COPY
6MGood
7 4/99
Pacific Gas and Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Frank Talbot (FXT)
E-Mail report to Richard Correia (RPC)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
DRS Director
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:+DC>DC910RP-DLP.wpd
To receive co
of document, indicate In box: "C = Co
without enclosures
"E" ~ Co
with enclosures "N" ~ No co
RIV:RI
SRI
SPE:DRP/E
C:DRS/P
DGAcke
JASloa 'L roul
~ GAPic
6MGood
C'/
/99
O'DRP/E
LJSmith
7 Q/99
7 5/99
7/
99
7/
99
D:DRP
KEBro
m n
7~0/99
OFFICIALRECORD COPY
7
~ /99