Forwards Insp Repts 50-275/99-10 & 50-323/99-10 on 990529-0710.Four Violations Being Treated as Noncited Violations
ML16342A875
Person / Time
Site: Diablo Canyon  
Issue date: 07/30/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A876 List:
References
50-275-99-10, 50-323-99-10, NUDOCS 9908060051
Download: ML16342A875 (10)


See also: IR 05000275/1999010

Text

cgA Agc+

c~

C~

0

Er

rl

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

3P

i599

Gregory M. Rueger, Senior Vice President

and General Manager

Nuclear Power Generation Bus. Unit

Pacific Gas and Electric Company

Nuclear Power Generation, B32

77 Beale Street, 32nd Floor

P.O. Box 770000

San Francisco, California 94177

SUBJECT: NRC INSPECTION REPORT NO. 50-275/99-10; 50-323/99-10

Dear Mr. Rueger:

This refers to the inspection conducted on May 29 through July 10, 1999, at the Diablo Canyon

Nuclear Power Plant, Units 1 and 2, facility. The enclosed report presents the results of this

inspection.

During the 6-week period covered by this inspection period, your conduct of activities at the

Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious

operations, sound engineering and maintenance practices, and good radiation protection

support.

Section M8.1 of this inspection report discusses

an issue in which Diesel Engine Generator 1-1

was degraded for 18 days because

of a loose terminal lug. Engineers used unverified

assumptions

in determining the initial cause of failure of the diesel generator to achieve rated

voltage in the required time. In addition, Operations work control personnel deferred a system

engineering request for accelerated testing for 2 weeks despite a system engineering concern

that an intermittent fault existed within Diesel Engine Generator 1-1. This issue revealed

weaknesses

in your corrective action program and interdepartmenta1

communications.

Based on the results of this inspection, the NRC has determined that four Severity Level IV

violations of NRC requirements occurred.

These violations are being treated as noncited

violations, consistent with Appendix C of the Enforcement Policy. These noncited violations are

described in the subject inspection report.

If you contest the violation or severity level of these

noncited violations, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document

Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S.

Nuclear Regulatory Commission, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas

76011, the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC Resident Inspector at the Diablo Canyon Nuclear

Power Plant, Units 1 and 2, facility.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response,

if requested,

willbe placed in the NRC Public Document Room.

990806005i

9'90730

PDR

ADOCK 05000275

9

PDR

Pacific Gas and Electric Company

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Docket Nos.:

50-275

50-323

License Nos.: DPR-80

DPR-82

Ken E.

rockman, Director

Division of Reactor Projects

Enclosure:

NRC Inspection Report No.

50-275/99-10; 50-323/99-'I 0

cc w/enclosure:

Dr. Richard Ferguson

Energy Chair

Sierra Club California

1100 lith Street, Suite 311

Sacramento,

California 95814

Ms. Nancy Culver

San Luis Obispo Mothers for Peace

P.O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. Truman Burns>Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm. 4102

San Francisco, California 94102

Pacific Gas and Electric Company

-3-

Robert R. Wellington, Esq.

Legal Counsel

Diablo Canyon Independent Safety Committee

857 Cass Street, Suite D

Monterey, California 93940

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento,

California 94234

Christopher J. Warner, Esq.

Pacific Gas and Electric Company

P.O. Box 7442

San Francisco, California 94120

David H. Oatley, Vice President

Diablo Canyon Operations and Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Managing Editor

Telegram-Tribune

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Frank Talbot (FXT)

E-Mail report to Richard Correia (RPC)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:QDC>DC910RP-DLP.wpd

To receive co

of document, Indicate In box: "C" ~ Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:RI

SRI

SRI

SPE:DRP/E

C:DRS/P

DGAcke

7/

/99

C:DRP/E

LJSmith

7

/99

JASloa

~

DL roul

GAPic

7 5/99

7/

99

7/.

99

D:DRP

KEBro

m n

7+0/99

OFFICIAL RECORD COPY

6MGood

7 4/99

Pacific Gas and Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Frank Talbot (FXT)

E-Mail report to Richard Correia (RPC)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

DRS Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Resident Inspector

DRS-PSB

MIS System

RIV File

DOCUMENT NAME: R:+DC>DC910RP-DLP.wpd

To receive co

of document, indicate In box: "C = Co

without enclosures

"E" ~ Co

with enclosures "N" ~ No co

RIV:RI

SRI

SRI

SPE:DRP/E

C:DRS/P

DGAcke

JASloa 'L roul

~ GAPic

6MGood

C'/

/99

O'DRP/E

LJSmith

7 Q/99

7 5/99

7/

99

7/

99

D:DRP

KEBro

m n

7~0/99

OFFICIALRECORD COPY

7

~ /99