Ack Receipt of Ltr in Response to Request for Addl Info Contained in Ltr to Ruger ,which Forwarded NRC Insp Repts 50-275/98-201 & 50-323/98-201. Actions Described in Ltr Responsive to NRR Concerns
ML16342A802
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/03/1999
From: Quay T
NRC (Affiliation Not Assigned)
To: Oatley D
PACIFIC GAS & ELECTRIC CO.
References
50-275-98-201, 50-323-98-201, NUDOCS 9906070061
Download: ML16342A802 (6)


See also: IR 05000275/1998201

Text

June 3,

1999

Mr. David H. Oatley

Vice President-Diablo Canyon

Operations and Plant Manager

Diablo Canyon Power Plant

PO Box 56

Avila Beach, CA 93474

SUBJECT

PG&E LETTER DCL-98-12B, REPLY TO NRC INSPECTION REPORT

NO. 50-275,323/98201

Dear Mr. Oatley:

Thank you for your letter DCL-98-12B, dated September

14, 1998, in response to the request

for additional information contained in our letter to Mr. Ruger, dated July 16, 1998, which

forwarded NRC Inspection Report 50-275,323/98201.

We find the actions described in your

letter, taken to addres's concerns in the areas of procurement staffing and training of

procurement staff, and procurement and commercial-grade dedication procedures to be

responsive to our concerns.

The inspection report also identified Inspector Followup Item (IFI) 50-275,323/98201-01.

This

IFI involved confirmation of your actions taken to resolve problems associated

with a DEG

voltage regulator card replaced in 1994.

By telefax, dated August 18, 1998, your Regulatory

Services staff provided us with a copy of Action Request (AR) A0465240 and its associated

evaluations which tracked actions to resolve the IFI. The AR prompted further followup

questions by our inspector regarding drawings, circuit board part numbers, warehouse material

and revisions to your dedication procedure IDAP CF3.ID13. Your staff's efforts to resolve these

issues over the past few months resulted in discovery of an additional material deficiency in a

circuit board in the warehouse which prompted inspections of the six DEG voltage regulators.

After a series of telephone conversations over the past several months and finally by telefax

dated May 26, 1999, regarding the satisfactory DEG voltage regulator inspections and the

specifics of the revisions to CF3.ID13, we have the information necessary and as a result have

concluded that your staff's actions to resolve the IFI have been satisfactory.

Accordingly, IFI

98201-01 is closed.

Sincerely,/

S /

[original signed by TRQ]

Theodore R. Quay, Chief

Quality Assurance, Vendor Inspection,

Maintenance and Allegations Branch

Division of Inspection Program Management

Office of Nuclear Reactor Regulation

Docket Nos.'50-275, 50-323

cc: See next page (insert DCPP service list)

Distribution:

Central Files

PDR

RIDS Code: IE09

IQMB R/F

BRogers

LSmith, RIV (ABC, RPB-E, DRP)

CClark, RIV/DRS(SC/DCPP)

DProulx, RIV (Sr Rl, DCPP)

0 Q

  • See previous concurrence

Document Name: G."tIQMB>DraftNlexande>DCPP599.LTR

SBloom (LPM,DCPP)

JLee

\\ 0

Ive a co

of this document, Indicate In the box: "C" = Co

without enclosures

"E" ~ Co

viith enclosures "N" = No co

NAME

DATE

RMS/IQMB

C

SAlexander:

05/28/99*

IQMB/DIPM

GCwalina

05/28/99*

Q

TRQua

06/3 /99

eqoso7ooii

evoios

PDR

AoacK osooo27S

8

PDR

OFFICIALRECORD COPY

m1

gp,8 REGS

Cg

~o

Cy

I

0O

Vl

tp

'0

IP

~O

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D.C. 20555-0001

June 3,

1999

Mr. David H. Oatley

Vice President-Diablo Canyon

Operations and Plant Manager

Diablo Canyon Power Plant

PO Box 56

Avila Beach, CA 93474

SUBJECT

PGSE LETTER DCL-98-12B, REPLY TO NRC INSPECTION REPORT

(REPORT NO. 50-275,323/98201)

Dear Mr. Oatley:

Thank you for your letter DCL-98-12B, dated September

14, 1998, in response to the request

for additional information contained in our letter to Mr. Ruger, dated July 16, 1998, which

forwarded NRC Inspection Report 50-275,323/98201.

We find the actions described in your

letter, taken to address concerns in the areas of procurement staffing and training of

procurement staff, and procurement and commercial-grade dedication procedures to be

responsive to our concerns.

The inspection report also identified Inspector Followup Item (IFI) 50-275,323/98201-01.

This

IFI involved confirmation of your actions taken to resolve problems associated with a DEG

voltage regulator card replaced in 1994.

By telefax, dated August 18, 1998, your Regulatory

Services staff provided us with a copy of Action Request (AR) A0465240 and its associated

evaluations which tracked actions to resolve the IFI. The AR prompted further followup

questions by our inspector regarding drawings, circuit board part numbers, warehouse material

and revisions to your dedication procedure IDAP CF3.ID13. Your staff's efforts to resolve these

issues over the past few months resulted in discovery of an additional material deficiency in a

circuit board in the warehouse which prompted inspections of the six DEG voltage regulators.

After a series of telephone conversations over the past several months and finally by telefax

dated May 26, 1999, regarding the satisfactory DEG voltage regulator inspections and the

specifics of the revisions to CF3.ID13, we have the information necessary and as a result have

concluded that your staff's actions to resolve the IFI have been satisfactory.

Accordingly, IFI

98201-01 is closed.

Sincerely,

gQek

g.Qy

Theodore R. Quay, Chief

Quality Assurance, Vendor Inspection,

Maintenance and Allegations Branch

Division of Inspection Program Management

Office of Nuclear Reactor Regulation

Docket Nos. 50-275, 50-323

cc: See next page (insert DCPP service list)

Diablo Canyon Power Plant, Units 1 and 2

CC:

NRC Resident Inspector

Diablo Canyon Nuclear Power Plant

c/o U.S. Nuclear Regulatory Commission

P. O. Box 369

Avila Beach, California 93424

Regional Administrator, Region IV

U.S. Nuclear Regulatory Commission

Harris Tower 8 Pavillion

611 Ryan Plaza Drive, Suite 400

Arlington, Texas

76011-8064

Dr. Richard Ferguson, Energy Chair

Sierra Club California

1100 11th Street, Suite 311

Sacramento,

California 95814

Christopher J. Warner, Esq.

Pacific Gas 8 Electric Company

Post Office Box 7442

San Francisco, California 94120

Ms. Nancy Culver

San Luis Obispo

Mothers for Peace

P. O. Box 164

Pismo Beach, California 93448

Chairman

San Luis Obispo County Board of

Supervisors

Room 370

County Government Center

San Luis Obispo, California 93408

Mr. David H. Oatley, Vice President

Diablo Canyon Operations and

Plant Manager

Diablo Canyon Nuclear Power Plant

P.O. Box 3

Avila Beach, California 93424

Telegram-Tribune

ATTN: Managing Editor

1321 Johnson Avenue

P.O. Box 112

San Luis Obispo, California 93406

Mr. Truman Burns

Mr. Robert Kinosian-

California Public Utilities Commission

505 Van Ness, Room 4102

San Francisco, California 94102

Mr. Steve Hsu

Radiologic Health Branch

State Department of Health Services

Post Office Box 942732

Sacramento,

California 94232

Diablo Canyon Independent Safety

Committee

AKIN: Robert R. Wellington, Esq.

Legal Counsel

857 Cass Street, Suite D

Monterey, California 93940

0'