Ack Receipt of 990326 Response to NRC 990216 Request for Written Response to Explain Why Greater than 5 Percent Post Exam Changes to Test Questions Were Needed & What Actions Taken to Prevent Recurrence.Finds Reply Acceptable
ML16342A768
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/15/1999
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
Public Service Enterprise Group
References
50-275-99-301, 50-323-99-301, NUDOCS 9904210110
Download: ML16342A768 (8)


Text

r, l

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:9904210110 DOC.DATE: 99/04/15 NOTARIZED: NO DOCKET I FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION HOWELL,A.T.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.

Public. Service Electric

& Gas Co. of New Jersey

SUBJECT:

Ack receipt of 990326 response to NRC 990216 request for written response to explain why greater than 5 percent post exam changes to test questions were needed

&. what actions taken to prevent recurrence. Finds reply acceptable.

DTSTR1BUTTON CODE:

1E42D COPTES RECEIVED: LTR I

ENCL 0 STRE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT ID CODE/NAME LPD4-2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME BLOOM,S COPIES LTTR ENCL XNTERNAL: ACRS NRR/DIPM/IOLB

~RILE CEIg.'E RGN4 FILE 01 EXTERNAL: NOAC NRC PDR NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU.OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL

)

1

CI.

gag Rfgg,

+4 P

0 I

O fA Co V/+n

~O

++**+

UNITEDSTATES NUCLEAR REGULATORYCOMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011-8064 April 15, 1999 Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B32 77 Beale Street, 32nd Floor P.O. Box 770000 San Francisco, California 94177

SUBJECT:

NRC INSPECTION REPORT 50/275/99-301; 50-323/99-301

Dear Mr. Rueger:

Thank you for your letter of March 26, 1999, in response to our February 16, 1999, letter concerning the request for a written response to explain why greater than 5 percent post-examination changes to the test questions were necessary and what actions willbe taken to preclude recurrence on future examinations.

We have reviewed your reply and find it responsive to the concerns raised in our inspection report.

Sincerel, Arthur T. Howell I, Director Division of Reacto Safety Docket Nos.:

50-275; 50-323 License Nos.: DPR-80; DPR-82 CC:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814

'79042iOii0 990415 PDR ADOCK 05000275 V

~

PDR

0 1

Pacific Gas and Electric Company Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman BurnshMr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732

'acramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo'Canyon Nuclear Power Plant

. P.O. Box3 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 SanLuisObispo, California 93406

1 4

Pacific Gas and Electric Company bcc to DCD (IE01)(IE42) bcc distrib. by RIV:

Regional Administrator DRP Director DRS Director Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

L. Hurley R. Gallo (MS 09 D24)

DRS AI 99-6-.0040 Resident Inspector DRS-PSB MIS System RIV File DOCUMENT NAME: R:+DC>DC9301ak.tom.wpd To receive co of document, Indicate In ox: "C =Co viithout nclosures E =Co with enclosures N = Noco RIV:SRE:OB TOMcKe mon/I