ML16342A533
| ML16342A533 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/09/1998 |
| From: | Murray B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9810190026 | |
| Download: ML16342A533 (10) | |
Text
gDS ~<Cy
<c+
Igj 8'a*<<<<
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE. SUITE 400 ARLINGTON.TEXAS 7601 I 8064 QCI Gregory M. Rueger, Senior Vice President and General Manager Pacific Gas and Electric Company Nuclear Power Generation Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424
SUBJECT:
DIABLOCANYON POWER PLANT EMERGENCY PLANNING MEETING
Dear Mr. Rueger:
This refers to the meeting conducted in the Region IV office on October 5, 1998. This meeting was conducted to introduce the new emergency planning supervisor to the Region IV staff and discuss program status.
Specific topics covered included: program staffing and challenges, drill results, exercise objectives and scenario, and.exercise controller training.
k In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter willbe placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we willbe pleased to discuss them with you.
Sincerely, Blaine Murray, Chief Plant Support Branch Docket Nos.:
50-275 50-323 License Nos.: DPR-80 DPR-82
Attachment:
Attendance List
'P8i0190026 98i00'9 PDR ADQCK 05000275 F
Diablo Canyon Nuclear Power Plant CC:
Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408
'r. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.
Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.
Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, California 93424
Diablo Canyon Nuclear Power Plant Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406
Diablo Canyon Nuclear Power Plant bcc to DCD (IE35) bcc distrib. by RIV:
Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File Resident Inspector DRS-PSB MIS System RIV File DOCUMENT NAME: R:3 DC'tDCMS1005.GMG To receive co of docurnen, indicate in box: "C" = Co without enclosures "E" = Co with enclosures "N" = No co SEPA E
6MGood 10 98 C:PSB E
B rra 10 98 S
E ATHowe 10/ /98 OFFICIAL RECORD COPY
MEETING: DIABLOCANYON NUCLEAR POWER STATION
SUBJECT:
Emer enc Plannin Su ervision DATE: October 5 1998 ATTENDANCE LlST (PLEASE PRINT CLEARLY)
NAME ORGANIZATION MR.C Re ia POSITION TITLE
~> F( 'i i 6 bfP
/(. S"