A LIocket Nos.
50-275 and 50-323 A
April 29, 1994 Mr. Gregory M. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company I'7 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177' I
t\\
f tt
Dear Mr. Rueger:
." J
SUBJECT:
DIABLO CANYON UNITS I AND,2,,WITHDRAWALOF LICENSE AMENDMENT REDUEsT No. 92-01 (TAc Nos.
2964 ANDtS2965) j'r t
By letter dated, February 4,
- 1992, you. submi,tted License Amendment'Request No.
92-01 to revise applicable specifi'cations, to 'increase the Accumulator Allowed Outage Time (AOT) from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for reasons other than,a closed isolation valve, to revise the Action Statement'o be consistent'ith the Applicability Statement by replaci'ng the requirement'to be in Hot" Shutdown with a requirement to place, the plant in Hot Standby with pressurizer pressure less than or equal to 1000 psig, to revise'he frequency of surveillance 4.5. 1.2 for the accumulator pressure and water level channels from 31 days to 92 days, and to revise the surveillance from a Channel Functional Test to an Analog Channel Operational Test.
However, your staff subsequently informed the NRC during a telephone conference that the amendment is no longer requested.
Therefore, your proposed change is considered to be withdrawn.
If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.
We have prepared a proposed Notice of Withdrawal of Application for Amendment to Facility Operating License.
Unless you notify us that we are incorrect within 10 days of receipt of this letter, we will file the notice with the Office of the Federal Register for publication.
Sincerely, Original signed by:
Sheri R. Peterson, Project Manager Project Directorate IV-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation cc:
See next page 9405040184 940429 PDR ADOCK 05000275 P
)- DISTRIBUTION
'Docket File, (Pl-22)
I NRC Il Local PDRs PDIV-3 R/F JRoe EAdensam TQuay DFoster-Curseen SPeterson
- OGC, (15B18)
'Hagan, (3206)
ACRS(10),(P-315)
- OPA, (2G5)
OC/LFDCB(11104)
- KPerkins, WCFO/R-IV
- BBeach, RIV OFFICE:
NAME:
DATE PDIV-3/LA DFoster-Curseen&~
/
/94 PDIV-3/Intern HSIIuaibi A4-4
/
/94
'PDIV-3/PH SPetersohnt iI,
'94 PD IV-3 TOuay
/2 f/94 OFFIC AL RECORD COPY/ FILENAME: DC8 9
.AMD giFIKlt; BILKSEAL'".'U PM~V
0 I
O.
/
~I
~
)p
'I
/!
1 I
I 1
'1
gP,S gE001 4~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 29, 1994 Docket Nos.
50-275 and 50-323 Hr. Gregory H. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94177
Dear Hr. Rueger:
SUBJECT:
DIABLO CANYON UNITS 1
AND 2 - WITHDRAWAL OF LICENSE AMENDMENT REqUEST NO. 92-01 (TAC NOS.
H82964 AND M82965)
By letter dated February 4,
- 1992, you submitted License Amendment Request No.
92-01 to revise applicable specifications to increase the Accumulator Allowed Outage Time (AOT) from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for reasons other than a closed isolation valve, to revise the Action Statement to be consistent with the Applicability Statement by replacing the requirement to be in Hot Shutdown with a requirement to place the plant in Hot Standby with pressurizer pressure less than or equal to 1000 psig, to revise the frequency of surveillance 4.5. 1.2 for the accumulator pressure and water level channels from 31 days to 92 days, and to revise the surveillance from a Channel Functional Test to an Analog Channel Operational Test.
However, your staff subsequently informed the NRC during a telephone conference that the amendment is no longer requested.
Therefore, your proposed change is considered to be withdrawn.
If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.
We have prepared a proposed Notice of Withdrawal of Application for Amendment to Facility Operating License.
Unless you notify us that we are incorrect within 10 days of receipt of this letter, we will file the notice with the Office of the Federal Register for publication.
Sincerely, cc:
See next page Sheri R. Peterson, Project Manager Project Directorate IV-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation 4
e
Mr. Gregory M. Rueger Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Ms. Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448 Ms. Jacquelyn
'C. Wheeler P. 0.
Box 164 Pismo Beach, California 93448 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center'an Luis Obispo, California 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm.
4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94234 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower
& Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Peter H. Kaufman Deputy Attorney General State -of California 110 West A Street, Suite 700 San Diego, California 92101 Christopher J.
- Warner, Esq.
Pacific Gas
& Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Townsend Vice President and Plant Manager Diablo Canyon Power Plant P. 0.
Box 56 Avila Beach, California 93424