ML16342A407

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/93-34 & 50-323/93-34 on 931209-940112.Noncited Violations Identified
ML16342A407
Person / Time
Site: Diablo Canyon  
Issue date: 01/27/1994
From: Van Denburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A408 List:
References
NUDOCS 9402230068
Download: ML16342A407 (8)


See also: IR 05000275/1993034

Text

h

FORD I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9402230068

DOC.DATE: 94/01/27

NOTARIZED:

NO

DOCKET

FACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

VANDENBURGH,C.

Region

5 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGERgG.M.

Pacific Gas

& Electric Co.

R

SUBJECT:

Forwards

insp repts

50-275/93-34

& 50-323/93-34

on

931209-940112.Noncited

violations identified.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: Gene'ral

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

S/'F

INTERNAL:

RECIPIENT

ID 'CODE/NAME

PDV PD

ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

lh

1

1

1

1

1

1

1

l.

1

1

1

RECIPIENT

ID CODE/NAME

PETERSON,S

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB*

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE QjR

~

02

RGN5

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

.

1

1

1

1

1

1

1

1

1

1

1

hl

1

D

EXTERNAL

EG&G/BRYCEi J

~ H ~

NSIC

1

1

1

1

NRC

PDR

E

NOTE TO ALL RIDS" RECIPIENTS

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 604-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

~p,S RECy,

(Q

P

4

O

4~*y+

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

" >27 )os

Pacific Gas

and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street,

Room 1451

P. 0.

Box 770000

San Francisco,

California 94177

Attention:

Hr.

G.

H. Rueger,

Senior Vice President

and General

Hanager

Nuclear

Power Generation

Business

Unit

Subject:

NRC

INSPECTION

REPORT

NOS. 50-275/93-34

AND 50-323/93-34

This refers to the routine inspection

conducted

by H. Hiller, H. Tschiltz,

and

J. Winton during the period from December

9,

1993,

through January

12,

1994.

This inspection

examined your activities

as authorized

by

NRC License

Nos.

DPR-80

and DPR-82.

At the conclusion of the inspection,

the inspectors

discussed their findings with members of the

PG&E staff.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

We are concerned that your December

18,

1993,

request for enforcement

discretion provided limited time for

NRC response

and evidenced insufficient

familiarity on the part of your staff with the requirements

of this process.

Although the associated

technical

issues

were properly addressed,

your staff's

previous efforts to correct the weaknesses

exhibited during

a Hay 1993

enforcement discretion request

did not appear to have

been fully effective.

We understand

that you have initiated actions to provide more effective

participation

i,n this process if it should

be necessary

in the future.

Additionally,

a non-cited violation, identified by your staff was noted

regarding the fretting of component cooling water

(CCW) heat exchanger

tubes.

This issue

involved inadequate

procedures

to ensure that the

CCW heat

exchangers

were operated within their design flow rates.

This issue is

discussed

in detail in Paragraph

8 of the enclosed report.

Since the criteria

of the

NRC Enforcement Policy were satisfied, this violation is not being

cited.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

9402230068

940127

PDR

ADOCK 05000275

Q

PDR

Should you have

any questions 'concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

~

~

C. A. VanD nburgh, Acting Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection

Report

Nos. 50-275/93-34

and 50-323/93-34

cc w/enclosure:

Dr. 'Richard Ferguson,

Energy Chair, Sierra

Club C'alifornia

Hs.

Nancy Culver,

San Luis Obispo Mothers for Peace

Hs. Jacquelyn

C. Wheeler

Hanaging Editor, The County Telegram Tribune

Hr. Truman Burns, California Public Utilities Commission

Hr. Robert Kinosian, California Public Utilities Commission

Robert

R. Wellington, Esq.,

Diablo Canyon

Independent

Safety Committee

Hr. Steve

Hsu, Radiologic Health Branch,

State

Department of Health Services

Hr. Peter

H. Kaufman,

Deputy Attorney General,

State of California

Hr. Hark Urban,

Deputy Attorney General,

State of California

Christopher J.

Warner,

Esq.,

PG&E

Hr. John Townsend,

Vice President

and Plant Manager,

Diablo Canyon

bcc w/ copy of enclosure:

Docket File.

Project Inspector

Resident

Inspector

K. Perkins

,S. Richards

R.

Huey

P. Johnson

S. Peterson,

NRR

G.

Cook

D. Sullivan (electronic

copy)

bcc:

M. Smith

J.

Bianchi

D. Clevenger

REGION V

JWinton..

1/

/94

MTschi ltz

f,M

1p

I/~y/94

/

PJ

sn

1/=

9

I

lj) p

/~l

RHuey

I/~794

REQUEST

COPY

REQUEST

COPY

EQUEST

COPY

EQUEST

COPY

EST

COPY

YES

NO

YES

0

ES'O

YES'.

NO

YE

NO

CVan

e burgh

1/~$ 94

REQUEST

Y

YES

NO

END TO PDR

YESi

NO

EN i TO

DCS

YES

NO

Fi 1 e Locati on:

G:~PSINDC-93-34. PHJ