Text
h
FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9402230068
DOC.DATE: 94/01/27
NOTARIZED:
NO
DOCKET
FACIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
VANDENBURGH,C.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGERgG.M.
Pacific Gas
& Electric Co.
R
SUBJECT:
Forwards
insp repts
50-275/93-34
& 50-323/93-34
on
931209-940112.Noncited
violations identified.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Gene'ral
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
S/'F
INTERNAL:
RECIPIENT
ID 'CODE/NAME
PDV PD
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
RES/HFB
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
lh
1
1
1
1
1
1
1
l.
1
1
1
RECIPIENT
ID CODE/NAME
PETERSON,S
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB*
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE QjR
~
02
RGN5
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
.
1
1
1
1
1
1
1
1
1
1
1
hl
1
D
EXTERNAL
EG&G/BRYCEi J
~ H ~
1
1
1
1
NRC
E
NOTE TO ALL RIDS" RECIPIENTS
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 604-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
~p,S RECy,
(Q
P
4
O
4~*y+
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK, CAUFORNIA94596-5368
" >27 )os
Pacific Gas
and Electric Company
Nuclear Power Generation,
B14A
77 Beale Street,
Room 1451
P. 0.
Box 770000
San Francisco,
California 94177
Attention:
Hr.
G.
H. Rueger,
Senior Vice President
and General
Hanager
Nuclear
Power Generation
Business
Unit
Subject:
NRC
INSPECTION
REPORT
NOS. 50-275/93-34
AND 50-323/93-34
This refers to the routine inspection
conducted
by H. Hiller, H. Tschiltz,
and
J. Winton during the period from December
9,
1993,
through January
12,
1994.
This inspection
examined your activities
as authorized
by
NRC License
Nos.
and DPR-82.
At the conclusion of the inspection,
the inspectors
discussed their findings with members of the
PG&E staff.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
We are concerned that your December
18,
1993,
request for enforcement
discretion provided limited time for
NRC response
and evidenced insufficient
familiarity on the part of your staff with the requirements
of this process.
Although the associated
technical
issues
were properly addressed,
your staff's
previous efforts to correct the weaknesses
exhibited during
a Hay 1993
enforcement discretion request
did not appear to have
been fully effective.
We understand
that you have initiated actions to provide more effective
participation
i,n this process if it should
be necessary
in the future.
Additionally,
a non-cited violation, identified by your staff was noted
regarding the fretting of component cooling water
(CCW) heat exchanger
tubes.
This issue
involved inadequate
procedures
to ensure that the
CCW heat
exchangers
were operated within their design flow rates.
This issue is
discussed
in detail in Paragraph
8 of the enclosed report.
Since the criteria
of the
NRC Enforcement Policy were satisfied, this violation is not being
cited.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
9402230068
940127
ADOCK 05000275
Q
Should you have
any questions 'concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
~
~
C. A. VanD nburgh, Acting Director
Division of Reactor Safety
and Projects
Enclosure:
Inspection
Report
Nos. 50-275/93-34
and 50-323/93-34
cc w/enclosure:
Dr. 'Richard Ferguson,
Energy Chair, Sierra
Club C'alifornia
Hs.
Nancy Culver,
San Luis Obispo Mothers for Peace
Hs. Jacquelyn
C. Wheeler
Hanaging Editor, The County Telegram Tribune
Hr. Truman Burns, California Public Utilities Commission
Hr. Robert Kinosian, California Public Utilities Commission
Robert
R. Wellington, Esq.,
Diablo Canyon
Independent
Safety Committee
Hr. Steve
Hsu, Radiologic Health Branch,
State
Department of Health Services
Hr. Peter
H. Kaufman,
Deputy Attorney General,
State of California
Hr. Hark Urban,
Deputy Attorney General,
State of California
Christopher J.
Warner,
Esq.,
Hr. John Townsend,
Vice President
and Plant Manager,
Diablo Canyon
bcc w/ copy of enclosure:
Docket File.
Project Inspector
Resident
Inspector
K. Perkins
,S. Richards
R.
Huey
P. Johnson
S. Peterson,
G.
Cook
D. Sullivan (electronic
copy)
bcc:
M. Smith
J.
Bianchi
D. Clevenger
REGION V
JWinton..
1/
/94
MTschi ltz
f,M
1p
I/~y/94
/
PJ
sn
1/=
9
I
lj) p
/~l
RHuey
I/~794
REQUEST
COPY
REQUEST
COPY
EQUEST
COPY
EQUEST
COPY
EST
COPY
YES
NO
YES
0
ES'O
YES'.
NO
YE
NO
CVan
e burgh
1/~$ 94
REQUEST
Y
YES
NO
END TO PDR
YESi
NO
EN i TO
YES
NO
Fi 1 e Locati on:
G:~PSINDC-93-34. PHJ