Forwards Insp Repts 50-275/93-24 & 50-323/93-24 on 930818-28 & Notice of Violation
ML16342A317
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/28/1993
From: Vandengurgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A318 List:
References
NUDOCS 9312030148
Download: ML16342A317 (6)


See also: IR 05000275/1993024

Text

~S REgg

0

rC

I

n

C

O

IVl0

Op

JP

Cy

+***+

P

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WAlNUTCREEK, CAUFORNIA94596-5368

October

28,

1993

Pacific Gas

and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street,

Room 1451

P. 0.

Box 770000

San Francisco,

California 94177

Attention:

Hr.

G. H. Rueger,

Senior

Vice President

and General

Hanager

Nuclear

Power Generation

Business

Unit

Subject:

NOTICE OF VIOLATION

NRC

INSPECTION

REPORT

NOS. 50-275/93-24

AND 50-323/93-24

This refers to the routine inspection

conducted

by H. Hiller, D.. Kirsch and

H. Tschiltz during the period from August

18 through September

28,

1993.

This

inspection

examined your activities

as authorized

by

NRC License

Nos.

DPR-80

and DPR-82.. At the conclusion of the inspection,

the inspectors

discussed

their findings with members of the

PGLE

staff.'reas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the irIspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

Based

on the results of this inspection, 'it appears

that certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

forth in the enclosed 'Notice of Violation (Notice),

and in the enclosed

inspection report:

This violation involved

a temporary

gage which was

installed in the Unit 2 component cooling water

(CCW) system without appro-

priate documentation

or safety analysis.

A non-cited violation was also noted

regarding the

same

gage,

in that it had been installed

and removed at

an

earlier date using improper administrative controls.

This. deficiency was

identified by a system engineer,

as discussed

in Paragraph

8 of the enclosed

report.

Since the criteria of the

NRC Enforcement Policy were satisfied, this

violation was not cited.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspection,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosures,

and

your response will be placed in the

NRC Public Document

Room.

9312030i48 93i028

PDR

ADOCK 05000275

9

PDR

0

The response

directed

by this letter and the accompanying

Notice is not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

C. A. VanD

burgh, Chief

"

Reactor Projects

Branch

Enclosures:

1.

Notice of Violation

2.

Inspection

Report Nos. 50-275/93-24

and 50-323/93-24

cc w/enclosures:

Dr. Richard Ferguson,

Energy Chair, Sierra Club California

Ms. Nancy Culver,

San Luis Obispo Mothers for Peace

Ns. Jacquelyn

C. Wheeler

Managing'Editor,

The County Telegram Tribune

Mr. Truman Burns, California Public Utilities. Commission

Nr . Robert Kinosian, California Public Utilities Commission

Robert

R. Wellington-, Esq.,

Diablo Canyon

Independent

Safety Committee

Mr. Steve

Hsu, Radiologic Health Branch, State

Department of Health Services

Nr. Peter

H. Kaufman,

Deputy Attorney General,

State of California

Mr. Nark Urban,

Deputy Attorney General,

State of California

Christopher J.

Warner,

Esq.,

PG&E

Mr. John Townsend,

Vice President

and Plant Manager,

Diablo Cahyon

II

bcc w/copy of enclosures

1 and 2:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

S. Richards

R. Huey

P. Johnson

S. Peterson,

NRR

G.

Cook

bcc w/enclosure

1 .only:

N. Smith

J.

Bianchi

D. Clevenger

REG IO

V

-3-

NT 'z

~0/28/93

DKi sc

10~93

1

10/Zt,/93

P

10/

RHuey

10)24/93

S

ES

NO

YES

NO

WES

NO

YES

NO

YES

NO

CVa

D nburgh

10/,

93

YES

NO

YES

NO

C

ES

NO

File Location:

G:I1PSI~DC-93-24.PHJ