ML16342A028

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/93-01 & 50-323/93-01 on 930119- 29.No Violations or Deviations Noted.Some Test & Insp Results (Worn Starting Motor Gear Teeth) Could Have Been Identified Earlier During Listed Insps
ML16342A028
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/19/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342A029 List:
References
NUDOCS 9303230070
Download: ML16342A028 (8)


See also: IR 05000275/1993001

Text

~R llEQy~'Vp

~4

0

Cy

4r

1

0

v~n +**++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK. CALIFORNIA94S98-5368

Fgg 19

19"--

Docket Nos.

50-275

and 50-323

Pacific

Gas

and Electric Company

Nuclear

Power Generation,

B14A

77 Beale Street,

Room 1451

P.O.

Box 770000

San Fr'ancisco,

California 94177

Attention:

Mr. Gregory

M. Rueger,

Senior Yice President

and General

Manager,

Nuclear

Power Generation

Business

Unit

SUBJECT:

NRC

INSPECTION OF DIABLO CANYON UNITS

1

AND 2

(REPORT

NO. 50-275,

50-323/93-01)

This refers to the routine announced

inspection

conducted

by Messrs.

D. Acker

and

F.

Gee of this office on January

19 through January

29,

1993.

This

inspection

examined certain of your activities authorized

by

NRC license

numbers

DPR-80

and DPR-82.

The results of this inspection

were provided to

your staff on January

28,

1993.

Areas

examined during this inspection

are described

in the enclosed, inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

The enclosed

inspection report details

noted the

comprehensive

testing

and inspections

you performed for your sixth Emergency

Diesel

Generator.

We wish to bring to your attention that

some of those test

and inspection results

(e.g.

worn starting motor gear teeth)

could have

been

identified earlier during your commercial

grade dedication inspections.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

L.

F

Miller, Jr., Chief

Reactor Safety

Branch

9S0SZS00ro

930a~9

PDR

ADQCK 05000275

6

PDR

Enclosure:

Inspection

Report

Nos.

50-275/93-01

and 50-323/93-01

cc w/enclosure:

J.

A. Sexton,

PGRE

C. J.

Warner,

Esq.,

PGEE

J.

D. Townsend,

Vice President/Plant

Manager,

PGLE

D. A. Taggart, Director, guality Support,

PG&E

B. Thomas,

News Services,

PGKE

T. L. Grebel,

Regulatory

Compliance

Supervisor,

PGSE

State of California

R. Hendrix, County Administrator

Sandra Silver

b c w/enclosure:

P.

ohnson

Proj t Inspector

Resid

t Inspector

G.

Cook

B. Faulk

berry

J. Hartin

Docket File,

bcc w/o enclosur

H. Smith

J. Zollicoffer

J. Bianchi

g fu-

D. Acker

Z/M/9

>/ a/93

> / l'Y93

P. Johnson

~/~ 1/93

[REQUEST COPY]

[REQUEST COPY]

ST COPY]

@%+EST

COPY

[YES /

NO

]

[YES /

NO

]

ES /

NO

]

~YES'

NO

[R

ST COPY]

ES

/

NO

]

SEND

TO

PDR

[YES /

NO

220'(2

bcc w/enclosure:

P.

Johnson

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Hartin

M. Fields,

Project Hanager,

NRR

L. Norrholh, VIB, NRR

Docket File

bcc w/o enclosure:

H. Smith

J. Zollicoffer

J.

Bianchi

D. Acker

/

/93

F.

Gee/

/93

W. Ang

P.

Johnson

/

/93

/

/93

[REQUEST COPY]

[REQUEST COPY]

[REQUEST COPY]

[REQUEST

COPY

[YES /

NO

]

[YES /

NO

]

[YES /

NO

]

[YES /

NO

L. Hiller

/

/93

[REQUEST

COPY]

[YES /

NO

]

[SEND TO

PDR

[YES /

NO