ML16342A028
| ML16342A028 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/19/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16342A029 | List: |
| References | |
| NUDOCS 9303230070 | |
| Download: ML16342A028 (8) | |
See also: IR 05000275/1993001
Text
~R llEQy~'Vp
~4
0
Cy
4r
1
0
v~n +**++
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK. CALIFORNIA94S98-5368
Fgg 19
19"--
Docket Nos.
50-275
and 50-323
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
77 Beale Street,
Room 1451
P.O.
Box 770000
San Fr'ancisco,
California 94177
Attention:
Mr. Gregory
M. Rueger,
Senior Yice President
and General
Manager,
Nuclear
Power Generation
Business
Unit
SUBJECT:
NRC
INSPECTION OF DIABLO CANYON UNITS
1
AND 2
(REPORT
NO. 50-275,
50-323/93-01)
This refers to the routine announced
inspection
conducted
by Messrs.
D. Acker
and
F.
Gee of this office on January
19 through January
29,
1993.
This
inspection
examined certain of your activities authorized
by
NRC license
numbers
and DPR-82.
The results of this inspection
were provided to
your staff on January
28,
1993.
Areas
examined during this inspection
are described
in the enclosed, inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations or deviations of NRC requirements
were identified within the
scope of this inspection.
The enclosed
inspection report details
noted the
comprehensive
testing
and inspections
you performed for your sixth Emergency
Diesel
Generator.
We wish to bring to your attention that
some of those test
and inspection results
(e.g.
worn starting motor gear teeth)
could have
been
identified earlier during your commercial
grade dedication inspections.
In accordance
with 10 CFR 2.790(a),
a copy of this letter
and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
L.
F
Miller, Jr., Chief
Reactor Safety
Branch
9S0SZS00ro
930a~9
ADQCK 05000275
6
Enclosure:
Inspection
Report
Nos.
50-275/93-01
and 50-323/93-01
cc w/enclosure:
J.
A. Sexton,
PGRE
C. J.
Warner,
Esq.,
PGEE
J.
D. Townsend,
Vice President/Plant
Manager,
PGLE
D. A. Taggart, Director, guality Support,
B. Thomas,
News Services,
PGKE
T. L. Grebel,
Regulatory
Compliance
Supervisor,
PGSE
State of California
R. Hendrix, County Administrator
Sandra Silver
b c w/enclosure:
P.
ohnson
Proj t Inspector
Resid
t Inspector
G.
Cook
B. Faulk
berry
J. Hartin
Docket File,
bcc w/o enclosur
H. Smith
J. Zollicoffer
J. Bianchi
g fu-
D. Acker
Z/M/9
>/ a/93
> / l'Y93
P. Johnson
~/~ 1/93
[REQUEST COPY]
[REQUEST COPY]
ST COPY]
@%+EST
COPY
[YES /
NO
]
[YES /
NO
]
ES /
NO
]
~YES'
NO
[R
ST COPY]
/
NO
]
SEND
TO
[YES /
NO
220'(2
bcc w/enclosure:
P.
Johnson
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Hartin
M. Fields,
Project Hanager,
L. Norrholh, VIB, NRR
Docket File
bcc w/o enclosure:
H. Smith
J. Zollicoffer
J.
Bianchi
D. Acker
/
/93
F.
Gee/
/93
W. Ang
P.
Johnson
/
/93
/
/93
[REQUEST COPY]
[REQUEST COPY]
[REQUEST COPY]
[REQUEST
COPY
[YES /
NO
]
[YES /
NO
]
[YES /
NO
]
[YES /
NO
L. Hiller
/
/93
[REQUEST
COPY]
[YES /
NO
]
[SEND TO
[YES /
NO