Informs That Ref Matl Identified in Attachment 2 of ES-201 Required by 930224 to Meet Schedule of Initial Licensing Exams on 930524 & Operating Tests on 930525-0602
ML16341G808
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/28/1992
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
RTR-NUREG-1021 NUDOCS 9301050123
Download: ML16341G808 (6)


Text

~p,R RECy,Mp

~4 0~i 0O II/I0 VJ+g ++*++

,0 UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 Opg g 8 3992 Docket Nos.

50-275/323 Pacific Gas L Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P. 0.

Box 770000 San Francisco, CA 94177 Attention:

Gregory H. Rueger Senior Vice President and General Hanager Nuclear Power Generation Business Unit

Subject:

Initial Reactor Operator Licensing Examinations

Dear Hr. Rueger:

In a telephone conversation on December 16, 1992 between Hr. J.

Welsch, Operation and Engineer Training, Supervisor and Hr. D. Pereira, Region V, Chief Examiner, arrangements were made for the administration of initial licensing examinations at Diablo Canyon Units 1

and 2.

The written examinations are scheduled for Hay 24,

1993, and the operating tests are scheduled for Hay 25 June 2,

1993.

NUREG-1021, "Operator Licensing Examiner Standards,"

Revision 7, will be used for preparation and administraion of these examinations.

During the week of Hay 10, 1993, at the Diablo Canyon site, your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in ES-201, Attachment 4, of NUREG-1021.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2

of ES-201 by February 24, 1993.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be, necessary for your staff to provided adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the ope} ating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance date (e.g.,

system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

9301050123 921228 PDR ADOCK 05000275 V

PDR

ES-402, Attachment 2,

and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a

postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OHB) Clearance Number 3150-0101, which expires October 31, 1995.

This estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management

Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C.

20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and

Budget, Washington, D.C. 20503.

Thank you for your cooperation in this matter.

Hr. J.

Welsch has been advised of the policies and guidelines referenced in this letter.

If you have any questions regarding th'e NRC's examination procedures and guidelines, please contact D. Pereira, Chief Examiner at (510) 975-0307, or P. Horrill, Operations Section Chief at (510) 975-0293.

Sincerely, F. Hiller, Jr.,

C ef Reactor Safety ch cc w/enclosures:

J.

A. Sexton, PG&E J.

D. Townsend, Vice President/Plant

Manager, PGEE C. J.
Warner, Esq., Attorney D. A. Taggart, Director, guality Support, PGKE B. Thomas, News Services, PG8E T. L. Grebel, Regulatory Compliance Supervisor, PGS,E T. Martin, DCPP, Diablo Canyon J.
Welsch, DCPP, Diablo Canyon State of California Bob Hendrix, County Administrator

bcc:

R. Gallo, NRR/LOLB S. Peterson, NRR/PD5 J. Hartin, RV B. Faulkenberry, RV K. Perkins, RV H. Hiller, Acting SRI, Diablo Canyon P. Horrill, RV L. Hiller, RV D. Pereira, RV R. Cross, RV (2 copies)

PEREIRA HORRILL LHILLER 12

/92 12 92 12 92 RE(VEST COPY YES NO 0 REQUEST COP YES N

EOUEST COPY YES 0 NO SEND TO CS YES NO 0 SEND TO PDR YES NO 0 0460C'