,- ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9212280255
DOC.DATE: 92/12/11
NOTARIZED: NO
'CIL:50-275 Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
AUTH.NAME
AUTHOR AFFILIATION
RICHARDS,S.A.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
RUEGER',G.M.
,
Pacific Gas
a Electric Co.
SUBJECT: Forwards,Insp
Repts
50-275/92-31
& 50-323/92-31
on
920929-1109
a notice of violation. One noncited violation
also noted re documentation
a periodic verification of
jumpers.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
ENCL 2
SIZE:
l
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES
DOCKET
05000275
05000323
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIB
AEOD/TTC
NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9H
NRR/PMAS/ILRB12
0FgJ)QR
REG FILE
02
EXTERNAL: EGSG/BRYCEzJ.H.
COPIES
LTTR ENCL
1
1
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PETERSONiS
AEOD/DSP/TPAB
DEDRO
NRR/DLPQ/LHFBPT
NRR/DOEA/OEAB
NRR/PMAS/ILPB
NUDOCS-ABSTRACT
OGC/HDS1
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
'2
2
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF. COPIES
REQUIRED:
LTTR
26
ENCL
26
~R IlEOy~
lO0
n
o~
+**0+
UNITED STATES
NUCLEAR REGULATQRYCOMMISSION
REGION V
1450 MARIAlANE
VVALNUTCREEK, CAUFORNIA94596-5368
December ll, 1992
Pacific Gas
and Electric Company
Nuclear Power Generation,
B14A
77 Beale Street,
Room 1451
'.
0.
Box 770000
San Francisco,
California 94177
Attention:
Hr. G. H. Rueger,
Senior Vice President
and General
Hanager
Nuclear
Power Generation
Business
Unit
Subject:
NRC INSPECTION REPORT
NOS. 50-275/92-31
AND 50-323/92-31
This refers to the routine inspection
conducted
by D. Corporandy, J. Helfi,
H. Hiller, C. Hyers,
and
B. Olson during the period from September
29 through
November 9,
1992.
This inspection
examined your activities
as authorized
by
NRC License
Nos.
and DPR-82.
At the conclusion of the inspection,
the
inspectors
discussed their findings with members of the
PG3E staff.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel;
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted
in full compliance with NRC requirements,
as set
forth in the enclosed
Notice of Violation (Notice),
and in the enclosed
inspection report (Paragraph
6).
In October
1991, at the close of the Unit 2
outage,
you correctly i'dentified and reported
an inadequate
program to control
'oose
material in the Unit 2 containment.
However,
NRC inspectors identified
similar materials in the Unit
1 containment at the close of the October
1992
outage,
indicating that your corrective actions
had not addressed
this
weakness
in a sufficiently comprehensive
manner .
Before completion of this
inspection,
the inspectors
confirmed that your organization
has taken or
initiated corrective actions which satisfactorily address this concern before
the next scheduled
outage.
Consequently,
a written response
to the enclosed
Notice is not required..
A non-ci,ted violation was also noted,
involving documentation
and periodic
verification of jumpers,
as discussed
in Paragraph
13 of the enclosed report.
Since the criteria of the
NRC Enforcement Policy were satisfied, this
violation was not cited.
An area of noteworthy strength
was identified.
Concerning
outage safety,
your
Unit
1 shutdown safety requirements
appeared
to have
been well developed
and
implemented.
Operations
and outage
management
appeared
to have maintained
a
very high level of safety system availability and configuration control during
the outage.
You are encouraged
to maintain this high level of safety.
9212280255
'F21211
ADOCK 05000275
8
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be~pleased
to discuss
them with you.
Sincerely,
S. A. Richards,
Acting Chief
Reactor Projects
Branch
Enclosures:
1.
2.
Inspection
Report Nos. 50-275/92-31
and 50-323/92-31
cc w/enclosures:
J.
A. Sexton,
PGLE
C. J. Warner,
PGLE
J.
D. Townsend,
PGLE (Diablo Canyon)
D. A. Taggart;
PGLE (Diablo Canyon)
T. L. Grebel,
PG&E (Diablo Canyon)
C.
B. Thomas,
News Services,
PGLE
State of California
R. Hendrix, County Administrator
Sandy Silver
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
B. Faulkenberry
J. Hartin-
R. Huey
P. Johnson
S. Peterson,
G.
Cook
bcc w/o enclosure:
H. Smith
J. Bianchi
J. Zollicoffer
REGION V
DCorporandy
l
12/io/92
12/
/92
7
s
n
12/0 /92
el
12IA I92
1
e
12/g /92
NO
S
NO
NO
S
NO
P
n
11/Q 92.
1/ii/92
SRichards
YES
NO
YES
NO
YES
NO
YES
NO
'c oU4"