Text
~p,P 4E Gy
e
l'O (r+
P
+M
0
i
UNITED STATES
NUCLEAR REGULATORY COIVIMISSION
WASHINGTON, D.C. 2%65
December
8,
1992
Qct kN+ j-g/~
Docket No.:
50-275
Hr. Gregory H. Rueger,
Senior Vice President
and General
Manager
Pacific
Gas
and Electric Company
Nuclear
Power Generation,
B14A
77 Beale Street,
Room 1451
P.O.
Box 770000
San Francisco,
CA
94177
Dear Nr. Rueger:
SUBJECT:
DIABLO CANYON SHUTDOWN RISK AND OUTAGE MANAGEMENT INSPECTION
(NRC
INSPECTION
REPORT 50-275/92-201)
We are forwarding the report of the shutdown risk and outage
management
inspection
conducted
by the U.S. Nuclear Regulatory
Commission
(NRC) staff
from August
24 through October 30,
1992.
The activities inspected
were
authorized
by
NRC Operating
License
DPR-80 for the Diablo Canyon Unit
1
Nuclear Station.
At the conclusion of the inspection,
an exit meeting
was
held where the team's
inspection findings were discussed
with members of your
staff.
During the first phase of the inspection,
conducted
before the
1992 refueling
outage,
the
team examined
the adequacy of your outage
planning with respect
to
minimizing the risk of accident
sequences
during shutdown conditions.
During
the
second
phase
conducted
during the outage,
the team examined the
implementation of your outage plan.
The team found that you have developed
and implemented
a comprehensive
and
effective outage
plan that appropriately considered
the risk associated
with
plant shutdown evolutions.
Specific significant strengths
the team identified
included, training, self-assessments,
scheduling,
control
room operations,
and
the outage safety plan.
The concept of shutdown risk minimization was well
incorporated
into your overall outage planning.
The team also identified several
deficiencies
in your programs in the areas of
drawing 'control, overtime control,
inadequate
procedures,
and failure to
follow procedures.
Some observations
where additional
improvements
and
program enhancements
could
be
made included the definition and control of
"available" equipment
and the implementation of internal
assessment
recommendations.
No response
to this letter is required.
The
NRC Region
V office will issue
any enforcement
actions that
may result from this inspection.
mz2ieaivs minos. TT~=
ADOCK 05000275<,i
8
'DR
i
I
's
~
f~
C
=t~~
't,
-,,~)96
Decanber
8,
1992
In accordance
with 10 CFR 2.790(a),
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any
questions
concerning this inspection
please
contact the inspection
team
leader, Jeffrey
B. Jacobson
at (301)
504-2996 or the
NRC Project Manager,
Sheri
R. Peterson
at (301) 504-1325.
Sincerely,
ORIGINAL SIGNED BY
Enclosure:
Inspection
Report 50-275/92-201
cc:
See
page
3
Distribution:
See
page
4
- SEE
PREVIOUS
CONCURRENCE
Jack
W. Roe, Director
Division of Reactor Projects, III, IV,
V
Office of. Nuclear Reactor Regulation
OFFICE:
NAME:
DATE:
RS IB: DRIL:NRR
RS IB: DRIL:NRR
J Jacobson:
sf*
JDWi 1 cox*
12/02/92
12 02 92
RS IB: DRIL:NRR
PSKoltay*
12 02 92
S IB: DRIL:NRR
HWan *
12 02 92
OFFICE:
NAME:
DATE:
OFFICE:
NAME:
DATE:
OFFICE:
D:NRR
DHO'Heal*
12/02/92
RV
MJRoyack*
12/02/92
DD:DRIL:NRR
RS IB: DRIL:NRR
SPSanchez*
12 02
92
RV
CH ers*
12 02 92
D:DRIL:NRR
SELB:NRR
RVJenkins*
12 03/92
SC: RS IB:DRI L
DPNorkin*
12 02/92
D:DRPW
DEIIB'D
AHadi
n
12/
92
C: RS IB: DRI L
EVImbro*
12 03/92
NAME:
RPZik(%an 6
CElfos i
DATE:
12
92
OFFICIAL RECORD
ILE
DOCUMENT NAME: DCANYON.RPT
12 8
92
12
0/92
I
A
/
II
Hr. Gregory H. Rueger
Pacific
Gas
and Electric Company
Diablo Canyon
CC:
NRC Resident
Inspector
Diablo Canyon Nuclear
Power Plant
c/o U.S. Nuclear Regulatory
Commission
P. 0.
Box 369
Avila Beach, California
93424
Dr. Richard Ferguson,
Energy Chair
Sierra
Club California
6715
Rocky Canyon
Creston,
93432
Hs.
Sandra
A. Silver
Mothers for Peace
660 Granite Creek
Road
Santa
Cruz, California
95065
Hs. Jacquelyn
C. Wheeler
3303 Barranca
Court
San Luis Obispo, California
93401
Managing Editor
The County Telegram Tribune
1321
Johnson
Avenue
Post Office Box 112
San Luis Obispo, California
93406
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government
Center
San Luis Obispo, California
93408
Hr. Truman Burns
California Public Utilities Commission
505
Van Ness,
Room 4103
San Francisco,
94102
Hr. Hank Kocol
Radiologic Health Branch
State
Department of Health Services
Post Office Box 942732
Sacramento,
94234
Regional Administrator,
Region
V
U.S. Nuclear Regulatory
Commission
1450 Maria Lane, Suite
210
Walnut Creek, California
94596
Mr. Peter
H. Kaufman
Deputy Attorney General
State of California
110 West
A Street,
Suite
700
San Diego, California
92101
Hs.
Nancy Culver
192 Luneta Street
San Luis Obispo, California
93401
Michael
H. Str umwasser,
Esq.
Special Assistant Attorney General
State of California
Department of Justice
3580 Wilshire Boulevard,
Room 800
Los Angeles, California
90010
Christopher J. Warner,
Esq.
Pacific
Gas
& Electric Company
Post Office Box 7442
San Francisco,
94120
Diablo Canyon
Independent
Safety Committee
ATTN: Robert T. Wellington,
Esq.
Legal
Counsel
857
Cass Street,
Suite
D
Monterey, California
93940
Mr. Robert Kinosian
California Public Utilities Commission
505
Van Ness,
Room 4102
San Francisco,
94102
0
Distribution:
Docket Files 50-275
RSIB R/F
DRIS R/F
TEMurley,
FJMiraglia,
WTRussell,
JGPartlow,
ACThadani,
NRP.
CERossi,
RPZimmerman,
EVImbro,
DPNorkin,
JBJacobson,
SRPeterson,
RLSpessard,
JWRoe,
TRQuay,
HRood,
DJFoster,
Sr. Resident
Inspector
Regional Administrators
Regional Division Directors
Inspection
Team
LPDR
ACRS (3)
OGC (3)
IS Distribution
l
'1