ML16341G756

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/92-27 & 50-323/92-27 on 920914-1008.Violations Noted.Violation Re Failure to Maintain Certification of ISI Examiner for Visual Acuity Is Repeat Violation
ML16341G756
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/30/1992
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G757 List:
References
NUDOCS 9211180209
Download: ML16341G756 (4)


See also: IR 05000275/1992027

Text

~

~ gy,g AECy

I

+n

  • .+

+)i*+"

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE

WALNUTCREEK, CAUFORNIA94596-5368

Ot!T. 3 0>>~

Pacific Gas

and Electric Company

Nuclear Power Generation,

B14A

77 Beale Street,

Room 1451

,

P. 0.

Box 770000

San Francisco,

California

94177

Attention:

Hr.

G; H. Rueger,

Senior Vice President

and General

Hanager

Nuclear

Power Gener ation Business

Unit

SUBJECT:

NOTICE OF VIOLATION

NRC INSPECTION

REPORT 50-275,

50-323/92-27

This refers to the routine inspection

conducted

by Hessrs.

C. Clark and

C.

Hyers during the period from September

14 through October

8,

1992.

This

inspection

examined your activities

as authorized

by NRC License

Nos.

DPR-80

and DPR-82.

At the conclusion of the inspection,

the inspectors

discussed

their findings with members of the

PG&E staff.

Areas examined during this inspection

are described

in the enclosed, inspection

report.

Mithin these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appeared

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set

forth in the enclosed

Notice of Violation (Notice).

'Ihe violations described:

~

a failure to maintain the certification of an Inservice Inspection

~ (ISI) examiner for visual acuity,

and

~

a failure to document

and evaluate

the consequences

of measuring

the

vibration of the auxiliary feedwater

pump at

a location other than

that prescribed

by the

ASHE Code.

The violation for failure to maintain the certification of an ISI examiner for

visual acuity is

a repeat violation.

The previous violation was described

in

NRC Inspection Report 50-323/83-04.

Escalated

enforcement

is not applicable

due to the age of the previous violation and the low safety significance in

'this particu'1ar

case.

However, your attention is directed to this and the

several

other indications of a lack of rigor in testing described

in the

enclosed report.

For example,

the report describes

a lack of testing rigor by

corrosion engineers

performing pipe, wall thickness

measurements

at incorrect

locations,

and by surveillance test personnel

measuring auxiliary feedwater

pump vibration at

incorrect locations.

92iii80209 92i030

PDR

ADOCK 05000275

9

PDR

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions

y'ou plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions.and

the results of future

inspections,

the

NRC will determine whether further

NRC enforcement action is

,

necessary

to ensure

compliance with NRC regulatory'equirements.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosures,

and

your response will be placed in the

NRC Public Document

Room.

This letter and its enclosures

are not subject to the clearance

procedures

of

the Office of Management

and Budget

as required

by the Paperwork Reduction Act

of 1980,

Pub.

L.96-511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

L. F. Miller', Jr., Chief

Reactor Safety Branch'

Enclosures:

Notice of Violation

Inspection Report Hos. 50-275/92-27

and 50-'323/92-27

cc w/enclosures:

J. A. Sexton,

PG&E

J.

D. Townsend,

Vice President/Plant

Manager,

PG&E

C. J. Warner,

Esq., Attorney

D. A. Taggart, Director guality Support,

PG&E

T.

L;- Grebel,

Regulatory Compliance Supervisor,

PG&E

C. B. Thomas,

News Services,

PG&E

, State of California (Gordon K. Van Vleck)

R. Hendrix, County Administrator

Sandra Silver