ML16341G555
| ML16341G555 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/30/1992 |
| From: | Yuhas G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16341G556 | List: |
| References | |
| NUDOCS 9205150143 | |
| Download: ML16341G555 (6) | |
See also: IR 05000275/1992010
Text
~$ AEcy
P
~4
0
o
lO0
%~*~4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1460 MARIALANE, SUITE 210
WALNUTCREEK, CALIFORNIA94696-6368
APR 3
P ]992
Docket Nos.
50-275
and 50-323
Pacific Gas
8 Electric Company
77 Beale Street,
Room 1451
San Francisco,
94106
Attention:
G.
M. Rueger,
Senior Vice President
and General
Manager
Nuclear
Power
Generation
SUBJECT:
NRC INSPECTION OF DIABLO CANYON UNITS 1 AND 2
This letter refers to the routine inspection
conducted
by Mr.
M. Cillis of this
office on April 6-10
1992, of activities authorized
by NRC License
Nos.
and DPR-82,
and to the discussions
of our findings by Hr. Cillis with Mr.
D.
Miklush, and otlIer members of your staff at the conclusion of the inspect',on
on
April 10,
1992.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Mithin these
areas,
the inspection consisted of selective
examinations
jt
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790 of NRC's "Rules and Practice",
a copy of this
letter
and the enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
c.Q
G.
P.
Yu as,
Chief
Reactor Radiological Protection
Branch
Enclosure:
Inspection
Report
Nos.
50-275/92-10
and 50-323/92-10
9205150143
'720430
ADOCK 05000275
8
fgg4
i
CC:
J.
A. Sexton,
PG8E
J.
D. Townsend,
Vice President/Plant
Manager,
PGIIE
C.
M. Marner,
Esq.,
PGEE
D.
A. Taggart, Director, equality Support,
PG8E
B.
Thomas,
News Service,
PGIIE
T.
L. Grebel,
Regulatory Compliance Supervisor,
PGIIE
State of California
B. Hendrix, County Administrator
cc report only:
Sandra Silver
APR 3 0 1Qgp
bcc w/enclosure
Docket file
B. Faulkenberry
J. Martin
EP File 3-1-1
G.
Cook
Project Inspector
Res>dent
Inspector
bcc w/o enclosure
M. Smith
J. Zollicoffer
Region V/kjh 4/28/92
MCILLIS
GYU4S
4/~>/92
4'/92
0