ML16341G266

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/91-20 & 50-323/91-20 on 910608- 0722.No Violations Noted.Several Instances Where Personnel Made Errors in Work Clearances & Surveillance Testing Identified
ML16341G266
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/22/1991
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G267 List:
References
NUDOCS 9109110240
Download: ML16341G266 (6)


See also: IR 05000275/1991020

Text

'8 IIEOy

0

~y

J

nO

(i

~e

C

UNITED STATES

NUCLEAR REGULATORY COMMISSlON

REGION V

1460 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIAS4696-6368

AUG 2 2

lS91

Docket Nos. 50-275

and 50-323

Paci fic Gas

and Electri c Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Nr. J.

D. Shiffer, Senior Vice President

and General

Manager

Nuclear

Power Generation

i

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the routine inspection

conducted Nr. P.

P. Narbut during the

period of June

8 through July 22, 1991.

This inspection

examined your

.activities

as authorized

by

NRC License Nos.

DPR-80

and DPR-82.

At the

conclusion of the inspection,

discussions

of his findings were held with Mr.

J.

D. Townsend,

and other members of your. staff.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective,

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Although no violations of NRC requirements

were identified as

a result of this

inspection, your attention is directed to paragraph

4 which identifies several

instances

where your personnel

made errors in work clearances

and surveillance

testing.

Increased

management

attention in these

areas

appears

appropriate.

In accordance

with 10 CFR 2.790 (a),

a copy of'his letter and the enclosure

will be placed in the

NRC Public Document

Room.

II

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S. A. Richards,

Chief

Reactor Projects

Branch

Enclosure:

Inspection

Report Nos. 50-275/91-20

and 50-323/91-20

~ n I.r.

9109110240

910822

PDR

ADDCK 05000275

G

PDR

0

cc w/enclosure:-

J.

A. Sexton,

PG&E

R.

F. Locke,

PG&E

J . D. Townsend,

PG&E (Diablo Canyon)

D. A. Taggert,

PGSE (Diablo Canyon)

T. L. Grebel,

PG&E (Diablo Canyon)

B. Thomas,

News Services,

PG&E

State of California

Sandra Silver (Report Only)

AUG 2 2

1991

3

AUG 2 2 lggl-

bcc w/enclosure:

Docket File

G.

Cook

B. Faulkenberry

J. Martin

Resident

Inspector

Project Inspector

bcc w/o enclosure:

J. Zollicoffer

M. Smith

J. Bianchi

REGION%/dot

PPNarbut

PJM

ri 1 1

8/I 0/91

8/ (

91

SARichards

8~ /91

R4~ 8

RZimmerman

8~91

RE

COPY

RE

T COPY

YES

N

COPY

RE

UEST

Y

RE

UEST

COPY

YES

N

ES

N

E

N

PDR

YES

NO

0