QA Meeting Repts 50-275/91-23 & 50-323/91-23 on 910529.Major Areas Discussed:Licensee QA Program
ML16341G197
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/11/1991
From: Morrill P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16341G198 List:
References
50-275-91-23, 50-323-91-23, NUDOCS 9107310179
Download: ML16341G197 (22)


See also: IR 05000275/1991023

Text

U. S.

NUCLEAR REGULATORY COMMISSION

REGION

V

Report Nos.:

50-275/91-23

and 50-323/91-23

Docket- Nos.:

50-275

and 50-323

License Nos.:

DPR-80

and

DPR-82

Licensee:

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

Cali fornia

94106

Facility Name: Diablo Canyon Units

1 and

2

Meeting at:

Region

V Office, Walnut Creek, California

Report Prepared

by: B. J. Olson, Project Inspector

Approved by:

. Morrs

,

ref

Reactor Projects

Section

1

Meetin

on

Ma

29,

1991

Re ort Nos. 50-275/91-23

and 50-323/91-17

// / l1/

ate,

sgn

On May 29, 1991, at the request of the Pacific

Gas

and Electric Company

(PGSE),

a meeting

was held to discuss

PG&E's Quality Assurance

Program.

The

meeting was-beld, in the Region

V Office, Walnut Creek, California.

91Q731017P

Pi07i 5

PDR

ADOCH, 05000278

Q

PDR

DETAILS

1.

Meetin

Attendees.

I

a.

Licensee

Attendees

J. Sexton,

Manager, guality Assurance

M. Freund, Director, Procurement guality Assurance

D. Taggar t, Director, guality Performance

and Assessment

D. Murphy, Director, guality Programs

and Services

T. de Uriarte, Director, Nuclear Safety

and Regulatory Affairs

P. Burgess, guality Assurance

b.

NRC Attendees

2.

K. Perkins,

Deputy Director, Division of Reactor Safety

and Projects

D. Kirsch, Chief, Reactor Safety Branch

S. Richards,

Chief, Reactor Projects

Branch

P.

Morrill, Chief, Reactor Project Section

1

B. Wagner,

Reactor

Inspector

B. Olson, Project Inspector

Details

Mr. Sexton

opened

the meeting, indicating that

PGSE's guality Assurance

(gA) department

had

been in the process

of reorganizing.

As part of the

reorganization,

more emphasis

was placed

on activities at the Diablo

Canyon site.

Mr. Sexton turned the meeting over to the directors of the

threes

groups for an overview of each group's activities.

ualit

Pro

rams

and Services

This group performs trending analysis,

information resear ch, quality

problem oversight,

and technical training.

Recently,

the most

significant change in work activity has

been in the area of information

research.

Prior to performing

a gA audit, the audit leader

can request

an information package pertaining to the audit subject.

The information

package

would be developed

by reviewing industry reports,

lessons

learned,

and vendor information.

An information package

pertaining to

lubrication was provided

as

an example of the product that would be given

to the

gA audit team leader.

Region

V comments

regarding

the information

package

were generally positive.

As an oversight function, this group performs

a daily review of Action

Requests

to ensure that problems

are being categorized for significance

and are being resolved.

Mr. Kirsch commented that it often appeared

to

the

NRC that problems

were not appropriately elevated

to higher

management.

Mr . Sexton replied that,

as

a result of the daily. review of

Action Requests,

unresolved

problems

are

now discussed

in management

meetings.

Procurement

ualit

Assurance

This group performs audits of equipment

and service vendors.

Previously

about

80 to 90 percent of the audits

were contracted

but now, most audits

are performed

by PGKE.

There are approximately

250 vendors for Diablo

Canyon that receive audits.

Auditors may spend

up to three

days at each

vendor facility.

Last year about

10 to 15 vendors

were disqualified as

a

result of the audits.

The procurement of the sixth diesel

generator

was

discussed

along with the dedication

process for the diesel

generator.

ualit

Performance

5 Assessment

'his group is located at Diablo Canyon

and often makes

performance

based

assessments.

Included in these

assessments

were

a functional inspection

of the

CCW system

and

a review of maintenance activities during the last

. refueling outage.

gA indicated that this group has

been successful

in

finding design

issues

in the plant.

Also discussed

was the design basis

reconstitution

program.

This program is expected

to complete in 1993.

In closing the meeting,

Mr. Perkins

indicated that

gA needs

to be

an

extension of top management.

Mr. Sexton replied that gA has the support

of top management,

is not limited in scope,

and is improving site

activities.

AGENDA

USNRC REGION V - PG&E QA.

~

Introduction Jim Sexton, Manager

~

Quality Programs & Services (QP&S)

Reorganization, Analysis, Training

Doug Murphy, Director

~

Procurement Quality Assurance (PQA)

Vyndor Audits, CPI, Resource

Utilization

Mark Freund, Director (Acting)

~

Quality Performance

& Assessment (QP&A)

Assessments,

Improvements and Problems

Dave Taggart, Director

~

Question and Answer

Note: The prepared presentations

should

take between 45 min. and

1 hr.

0

INTRODUCTION

PG&E QA

~

Followup to February

1 6, 1990 Region V

- QA Meeting

~

Overview of the Reorganization

Introduction of the Directors

MAY29, 1991

QLIALITYPROGRAMS 8 SERVICES

QP&S

~

Progress of the Reorganization

~

Information Research,

Analysis,

& Reporting

~

Quality Problem Oversight

~

Technical Training

May 29, 1991

PROCUREMENT QUALITYASSURANCE

PQA

~ 1989 Incomplete/Inadequate

Vendor Audits-

Corrective Actions

~ Comprehensive

Procurement Initiative (CP I)

~ Resource Utilization - Third Party Audits

.

~ Sixth Diesel Generator Procurement

MAY29, 1991

I

g

QUALITYPERFORMANCE 8 ASSESSMENT

QP&A

Quality

Performance

8

Assessment

Overview

Major

Assessments

Performed

It,

New

Assessments

Developed

and

Performed

Special

Assessments

Being

Developed

Utility

Exchange / Sharing

for

Assessments

~

Technique

Improvements

Being

Implemented

Process

Improvements

and

Problems

0

MAJOR ASSESSMENTS PERFORMED

QP&A

~

SSFAR on CCW System

~

1R4/2R4 SSOMI Design Assessment

~

W4 SSOMI Installation Assessment

~

Sixth Diesel Generator Assessment

(Ongoing)

hLAY29, 1991

0

NEW ASSESSMENTS DEVELOPED

AND PERFORMED - QP8A

~

1R4 Maintenance Quality Assessment

(MQA)

~

Comprehensive

Procurement Assessment

MAY29, 1991

SPECIAL ASSESSMENTS BEING DEVELOPED

QP8A

2R4

SSOMI

Installation

2R4

Maintenance

Quality

Assessment

(MQA)

Operations

Safety

Assessment

(later in 1991)

l

Comprehensive

Sofhvare

Quality

Assessment

MAY29, 1991

Comprehensive

E Q

Assessment

SSFAR

(system to be selected - 1992)

1R5/2R5

SSOMI

Design

Assessment

(1992)