Forwards Insp Repts 50-275/91-11 & 50-323/91-11 on 910603-14.Several Weaknesses in Performance of Design Engineering Work Noted.Nrc Concerned That Separation of Safety Related Electrical Circuits Not Properly Implemented
ML16341G187
Person / Time
Site: Diablo Canyon  
Issue date: 07/10/1991
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341G188 List:
References
NUDOCS 9107290021
Download: ML16341G187 (6)


See also: IR 05000275/1991011

Text

'

~ ~

~ gS AECy,

o

1~

I

0+

I

'C

o"

IP +>>*+>>

UNITED STATES

NUCLEAR REGULATORY COMIVIISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

JUL i 0 )ggI

Docket Nos.

50-275

and 50-323

Pacific

Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco, California 94106

Attention:

Mr. J.

D. Shiffer, Senior Vice President

and General

Manager

Gentlemen:

SUBJECT:

- NRC INSPECTION

OF DIABLO CANYON UNITS

1 AND 2

This refers to the unannounced

inspection

conducted

by Mr. F.

Gee of this

office on June

3 through June

14, 1991, of activities authorized'y

NRC

'icense

Nos.

DPR-80 and DPR-82,

and to the discussion of our findings held

with members of your staff at the conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

As

a result of this inspection,

we noted several

weaknesses

in the

performance of design engineering

work.

In particular,

we are concerned

that required separation

of some safety related electrical circuits may

not be properly implemented at Diablo Canyon.

You are requested

to take

prompt action to resolve this apparent

design

problem.

We encourage

continued

use of Safety

System

Outage Modification Inspections

(SSOMI) by your guality Assurance

group and timely resolution of SSOMI

findings.

No violations or deviations of NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

ennis

F. Kirsch, Chief

Reactor Safety Branch

Enclosure:

Inspection

Report Nos. 50-275/91-11,

50-323/91-11

9107290021

910710

PDR

ADOCK 05000275

G

PDR

~

'

'

JUL

1 o

1991

cc w/enclosure:

J.

A. Sexton,

PAGE

J.

D. Townsend,

Vice President/Plant

Manager,'PGIIE

R.

F. Locke, Esq., Attorney

D. A. Taggart, Director, guality Support,

PGIKE

B. Thomas,

News Services,

PG&E

T. L. Grebel, Regulatory Compliance Supervisor,

PGIIE

State of California

Sandra Silver

kI

'

bcc w/enclosure:

R.

Zimmerman

K. Perkins

P. Morrill

Project Inspection

Resident'Inspector

G.

Cook

B. Faulkenberry

J. Martin

Oocket File

bcc w/o enclosure:

M. Smith

J. Zollicoffer

N. Western

FGee 4

DK'rsch

I

7/5 /91

7 /ig /91

'

//y/91

YES

/

40

VYg

0