ML16341F939

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/90-31 & 50-323/90-31 on 901211-19.No Violations Noted
ML16341F939
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/10/1991
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F940 List:
References
NUDOCS 9101290080
Download: ML16341F939 (6)


See also: IR 05000275/1990031

Text

~y,g RE0y~

(4

Vp

O~

Cj

r

') g

cT

~O

+>>*++

UNITED STATES

NUCLEAR REGULATORY COIVIMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

JAN i 0 1991

i

Docket Nos.

50-275

and 50-323

Pacific Gas

and Electric Company

77 Beale Street'oom

1451

San Francisco,

California

94106

Attention:

Mr..J.

D. Shiffer, Senior Vice President

Nuclear

Power Generation

Business

Unit

Gentlemen:

SUBJECT:

NRC Inspection of Diablo Canyon Nuclear

Power Plant

(DCPP)

This refers to the inspection

conducted

by Mr.

W. J.

Wagner of this office

'from December

11-19

1990 of activities authorized

by

NRC License

Nos.

DPR-80

and

DPR-82 and to the discussions

of our findings held with members of your

staff on December

12,

1990.

Areas examined during this irispection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted 'of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC requirements

were. identified as

a result of this

inspection.

Our investigation of the Chemical

and Volume Control

System

letdown piping

weld cracks

concluded that your actions

were not timely in the pursuit of the

root cause,,as

evident by the six months in which the

No.

2 cracked weld had

not been analyzed.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be please to

discuss

them with you.

Sincerely,

D.

F. Kirsc

Chief

Reactor Safety Branch

Enclosure:

Inspection

Report Nos. 50-275/90-31

and 50-323/90-31

910i290080 910iiO

PDR

ADGCK 05000275

8

PDR

~

'

"

cc w/enclosure:

J.

A. Sexton,

PG8E

J.

D. Townsend

PG8E (Diablo Canyon)

R.

F.

Locke,

P68E

D.

A. Taggart,

PG8E (Diablo Canyon)

B. Thomas,

News Services

PG8E (Diablo Canyon)

'T.

L. Grebel,

PG8E (Diablo Canyon)

State of California (Gordon

K. Van Vleck)

Sandra Silver (report only)

bcc w/enclosure:

Docket File

Resident Inspector

Project Inspector

G.

Cook

B. Faulkenberry

J. Nartin

bcc w/o enclosurt,:

M. Smith,

/l/, g/>Qadi-n

J. Zollicoffer

REGION V g/

WWagner g

PMorri 11

I'/v /91

1 /q/91

RHuey

DKirsch

I //o/91

q /(@91

E

/

NO

]

E

/

NO

E

/

NO

] YES /

NO

]

/

NO