November 1, 1990 DOCKET NOS.:
50-275 and 50-323 LICENSEE:
FACILITY'UBJECT:
PACIFIC GAS AND ELECTRIC COMPANY (PG&E)
DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2
SUMMARY
OF SEPTEMBER 25, 1990 PUBLIC MEETING ON INSTALLATION OF SCHEDULE AND DEDICATION OF SIXTH DIESEL GENERATOR AT DIABLO CANYON On September 25, 1990 the NRC staff met with the Pacific Gas and Electric Company (PG&E or the licensee) in Rockvi lie, Maryland to discuss the above subjects.
Attendees at the meeting are given in Enclosure 1.
Viewgraphs presented by PG&E at the meeting are given in Enclosure 2.
At the meeting PG&E discussed the schedule for installation, testing, and final tie-in of the sixth diesel, and the basis for the schedule.
Also discussed were some aspects of the dedication process for the diesel generator.
At the conclusion of the the meeting, the licensee indicated that it would be prepared to discuss the dedication program in more detai 1 in about two months, and that a meeting for that purpose could be arranged.
Enclosures:
1.
Meeting Attendees 2.
Licensee's Viewgraphs cc: w/enclosures - see next page DISTRIBUTION original signed by Harry Rood, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects KWlCH g
NRC
& LPDR
~ Docket File+
FMirag 1ia JPartlow DCrutchfield JDyer ACRS(10)
HRood OGC EJordan DRSP/PD HRood 11/( /90 LCampbell RMcIntyre WHaass WBr ach FRosa MVirgi 1 io JKnight JKnox
- MSlosson, 17G21'Morrill,Region V
- PNarbut, Region V
DRSP/(AiD,: PD5 JEDyer~
11/// /90 9'Oii130084 90110' PDR ADOCH, 05000275 P
PNU
4 I
f 4
I,hh I
I h
I
~
I
~ 'Ih h
~
~
C~
I 4l I ~h) ll ll,~ 4
. Il II I ~
h V, h h
I 'gh h
I, II
~
'hII I
II hh I
- ~
II It I h
~
Mr. J.
D. Shiffer Pacific Gas and Electric Company Diablo Canyon CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. R. B. Ferguson Sierra Club - Santa Lucia Chapter Rocky Canyon Star Route Company Creston, California 93432 Ms. Sandra A. Silver Mothers for Peace 660 Granite Creek Road Santa Cruz, California 95065 Bruce Norton, Esq.
c/o Richard F. Locke, Esq.
P. 0.
Box 7442 San Francisco, California 94120 Managing Editor The Count Tele ram Tribune o nson venue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Richard F. Locke, Esq.
Pacific Gas 5 Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. John Hickman Senior Health Physicist Env ironmenta 1 Radi oacti ve Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Regional Adminstrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Ms. Nancy Culver 192 Luneta Street San Luis Obispo, California 93401 Michael M. Strumwasser, Esq.
Special Assistant Attorney General State of California Department of Justice 3580 Wilshire Boulevard,.
Room 800 Los Angeles, California 90010
I
~
1 C
ENCLOSURE 1
ATTENDEES Public Meeting on Diablo Canyon Sixth Diesel Installation
- Tuesday, September 25, 1990 NAME Larry L. Campbell E. Connell III Usama Farradj William H. Goelzer Walter P.
Haass Daniel R. Hardesty John B. Hoch Roger Johnson James E. Knight John L. Knox Richard McIntyre Harry Rood Faust Rosa Bruce D. Smith James Tomkins Ed Walters Clay C.
Young ORGANIZATION NRC/NRR/RVIB PG&E/NECS PG&E/NECS PG&E/Plant System Engr.
NRC/NRR/RVIB PG&E/NECS/ME PG&E/NSARA PG&E/NSARA NRC/NRR/SELB NRC/NRR/SELB NRC/NRR/RVIB NRC/NRR/PDV NRC/NRR/SELB PG&E/NECS/EE PG&E/NSARA PG&E/Mechanical Engr.
PG&E/Procurement
& gA
1 s
CI
ENCLOSURE 2 VIEWGRAPHS PRESENTED BY PGAE Public Meeting on Diablo Canyon Sixth Diesel Installation
- Tuesday, September 25, 1990 C
1
~
OIABLO CANYON Units I and Z Installation Schedule Sixth Diesel Generator September 25, 1990
'I
~
AGENOA Installation of Sixth Diesel Generator
. Opening Remarks Introductory Remarks Regulatory Background/
Effects of Planned 2R5 Installation Overview of Project Status of Installation and Schedules NRC PG&E PG&E PG&E
. PG&E Comments and Discussion NRC/PG&E
~
y
AOT INCREASE/SIXTH DIESEL Regulatory Interactions
~
Mal'ch 31, 1989
~
May 11, 1989
~
May 12, 1989
~
May 23, 1989
~
July 20, 1989
~
October 4,
1989
~
August 1990 Meeting with NRC Risk-Based Report LAR for AOT Increase/
Sixth Diesel Addition Meeting with NRC Meeting with NRC License Amendment Issued by NRC Discussion of Reschedule 09/19/90 RLJ12
PROVISIONS OF LICENSE AMENOMENT Existing Five Diesel Configuration
~
7 Day AOT for Preplanned Maintenance/Testing on Diesel 1-3 Once Per Year
~
3 Day AQT for Maintenance/Testing of Other Diesels Six Diesel Configuration
~
7 Day AOT for Planned and Unplanned Maintenance/
Testing of All Diesels SER Noted PG8E's Commitment to Install Sixth Diesel
~
~
INSTALLATIONOF SIXTH DIESEL FORECAST FOR 2R5 Effect on Technical Specifications
~
None Effect on PRA
~
Positive Benefit Calculated for Six Diesel Configuration Would be Realized in 2R5 09/19/90 RLJ14
0 l
l
NEED FOR SIXTH DIESEI Increased Onsite power Distribution System Availability
~
More Flexibility for Maintenance
~
Dedicated Diesel for Each ESF Bus
~
Elimination of Operation and Testing of Complex Control System for Swing Diesel
~
Simplify Operating Procedures and Testing 09/20/90 RLJ18
I
,r
EXISTING ELECTRICAL OISTRIBUTION SYS TEM
, TO
$ÃNCY BUS TO 70 280KV 600KV BUS BUS 4KV BUS H UNIT 1 4KV BUS 9
) UNIT 1 i 4KY BUS F UNIT 0 4KV 4KV BUS F BUS 6 UNIT 2 UNIT 2 4KV BUS H UNIT 2 DIESEL DIESEL OENERAZOR QENERATOR NO. Ct HO. f8 DIESEL QENERATOR NO. Ri DIESEL QENERATCNI NO. 22 09/20/90 R LJ19
I
ELECTRICAL DISTRIBUTION SYSTEM AFTER 6TH DIESEL INSTALLATION l
TO 500KV BUS TO TO 230KV 5iKV 808 BUS 4KV BUS H UNiT 1 4KV BUS 0
) UNIT1 4KV BU8 F UNIT 1 4KV BUS F UNlT 2 4KV BU8 O UNIT 2 4KV BUS H UNlT 2 OlESEL DIESEL OlESEL lgESEL OENERAMA OENERATOR GENERATOR OENERATOR NO. 12 NO. 13 NO. 2-3 NO. 21 DlESEL OENERAYON NO. 22 09/20I80 RLJ20
I p
~0
~ JJ CS
<</
Sp SI9 JSS I
~ 0
~ 0
~ J
~ ~
~ 0
~ ~
~ ~
~ ~
~ 0
~ ~!I
~ ~\\ ~
~ ~
~ ~l ~
~ ~
II O
0 0
~
~
~
00 00
~
~
~
~
~
0
~
~
0 0
~
0
~0j I~
II OCV 00 IIO OISIOCOIO I~
402
)00
~os
~
50 I
~0
~0 00
~0 0J (eve IJJO SOI ~
SITE OVERLOOK
~
C 500.kv SMITCHYARD
((4
~0
~
~ ~
~ ~ 0 ee PROIICILO AIIIA OOIPCOARV (
0
~ 0
~ 00 F 0' 0
~
~ ~ ~
0 ~ 0 ~ 0 ~ 0
~ 0
~
IOO 505
)'~JJS RESERVOIR 230-kv SNIYCHYAR llACRIRG I IISO IIIIL5llfQII-
"op~~ Q RESERvO I R
~ ~
4
~Ot Ce 5
I I
O AVILA GATEL
~ ~
~ ~
~ ~
1 ~ ~
log Cee ~
78 q
~ ~
~ 0 0
~
~
~
+o
- 'o IOI 0 O 0
ER I I5
~
I PAOCING IOI O SSS
(
eK)
~0
'pe 0(t 104 I05
~A
~
~
~\\ ~
~
~
~
~
~
~ ~
~ 0
~ 0 00 ~
tOI
OCAC IVO lol ~
OOC C 00 (COC I0O
~ Of
~
OIASIO COvf
~.
~oo=
0 p I09
~
~
~
~
I
(
I I9 (AOCI0O COI te OOO 509 t(vi'I~ OO IOI (: Is QH 0 (000 Ieo COI C PA I IC(1 COvE I'ACI(IC OCCAIC l00 BRLAAVAICR COvf BOAI 5L IP CS ~
0 I5 I 50 5CASC 000 rCCI
~
~
MAJOR SUBSUPPLIERS Engine GE Locomotives Generator NEI Peebles Excitation Panel Basler
- Panels, 18C components, piping PGB E Assembler GEC Diesels
DESIGN OF SYSTEM
~
Sixth Diesel System Same Design as Original Five Except for Obsolete Components
~
GE Locomotive
Formerl Alco Designer of Engine and Overall System
~
NEI Peebles
- Designer of Generator
~
Basler
- Designer of Excitation Panels
~
PG8E Fabrication of Control and-Gauge Panels Will Incorporate Modifications Performed on Existing Five Engines'9/20/90 R LJ24
E
~
MAGNITUDEOF SIXTH DIESEL GENERATOR INSTALLATIONEFFORT Organizations Providing Input to Program:
NECS Engineering EQS TES Site QC Startup Maintenance Training 09/20/90 RLJ26 QA NECS Construction Plant Engineering PSG Operations NSARA
0
'J
NEO'S ENGlNEERlNG Overall Management of Project
\\
3 Months Contract Negotiations Design Effort 36;000 MHours Establish Special Testing Requirements 676 Parts Engine Power Train 60 Dedication Packages (Engine 1460 Pages)
Direct Interface with Suppliers, 10 Trips in 6 Months Coordinate Input/Review of Dedication Methodology by All Organizations (40 people, 10 Managers)
IJ
Oversight of All Aspects Of Project Lead Organization for Audits/Assessments/Surveys 10 People Participate in GE Locomotives Evaluation of Selected Subsuppliers 09/20/90 RLJ27
Source Verification Trips, 12 to Date Development of 5 Source Inspection Plans Support Special Testing of Power Train Parts 5 Inspectors Interface with Suppliers i
'9/20/90 RLJ28
0 I
~
NECS CONSTRUCTION Demolition of Existing Storage Area Construction Sixth Diesel Rooml New Storage Area Fabrication of 3 Panels Installation of Sixth Diesel 09/20/90 RLJ29
I
Metallurgists, Welding Engineers Evaluation of Special Testing Methodology Performance of Special Testing 08/20/90 RLJ30
PLANT
. ENGINEERlNG
- 'ctive Participation/Interface in Project Start to Finish Coordination of Engineering and Construction with Plant Organizations Review of Design Change Packages
,Revise or Write Over 350 Procedures Coordinate Site Testing Schedule Outage Work 09/20/90 RLJ31
I t
SITE QC Performance of Special Testing for Power Train Parts Perform Dedication Activities on Commercial Grade Parts at Site 09/20/90 RLJ32
Issue POs for 200 Items Receipt/Tracking GE/GEC/PG8 E Procured Equipment Coordinate Site Performance of Dedication Activities Coordinate Export/Import of Parts From Canada and Scotland 09/20/90 RLJ33
SUMMARY
Overall Project Cost 84o,ooo,ooo.oo Major Effort in Planning, Coordination, and Implementation Project Affects Most NPG Departments QOIRQl90 RLJ34
STATUS OF PROJECT Procurement/Desi n Chan es
~
Purchase Orders of Engine, Generator, Excitation Panel Issued
~
Review of Vendor Drawings in Progress
~
Document Storage Facility Construction Complete
~
Diesel Generator Room Demolition DCP Issued
~
Structural Preparation DCP Issued
~
Panel Fabrication in Progress
~
Diesei Generator Installation DCP Undergoing Review 09/20/90 RLJ36
g
STATUS OF PROJECT CONTINUED U comin Milestones
~
Diesel Engine Testing Scheduled for 10/15/90
~
Generator Delivery to GEC Scheduled for 11/30/90
~
Diesel Engine/Generator Testing Scheduled for 02/14/91 09/20/90 RLJ36
1 JI E
STATUS OF PROJECT CONTINUED Construction
~
Construction of New Document Storage Area
~
Demolition of Old Document Storage Area
~
Diesel Generator Room Preparation
~
Conduit Routing Diesel Generator Installation
~
Diesel Generator Determination/Termination 09/20/90 RLJ37
t i
JUSTIFICATION FOR COMMERlCAL GRADE PURCHASE OF SYSTEM COMPONENTS FOR ENGINE:
~
ALCO Reliable, Quality Engine
~
Easy to Maintain FOR OVERALL SYSTEM:
~
Operators and Maintenance Familiar with Engine
~
Less Resources Needed for Spare Parts
~
Compatible with Site Systems and Operation, Maintenance, Surveillance Procedures
g
'o ~
~
ENGINE DEDICATION Special 1
Testing Item 4
Performance CG 2
Survey With Survey of
- Design
- Process
- Material Source Verification 09/20/90 RLJ39
r )
~
DEDICATION CONTlNUED
\\
- Breakers, Relays,
- Panels, Switches, Indicators,
- Piping, Manual Valves Purchased from Commercial Grade Suppliers Have Component Specific RPEs Using:
~
Method 1, Special Inspections and Testing Performed at DCPP
~
Method 1, Functional Testing.at Supplier 09/20/90 RLJ40
I
~
METHOO 4 Following Data Sources Examined for Dedication by Method 4
~
Failure History of Five Engines Installed at DCPP
~
IE Bulletins, Information Notices, SOERs
~
INPO NPRDs
~
EPRI NP-4262, Surveillance Testing Failures
~
NSAC-108, Reliability of EDGs in U.S.
09/20/90 RLJ41
0 Jy P
Ik gf
METHOD 2 Commercial Grade Survey of GE Locomotives Conducted in Two Phases:
PHASE
~
Across-the-Board Programmatic Review Including Design Control, Special Processes, Materia!
- Control, MBTE, Procurement,
- Testing, Nonconformance PHASE 2:
~
Determined Representative Sample of All Engine Parts
~
Identified Critical Characteristics for Those Parts
~
Phase 2 of Survey Concentrated on the Control of These Critical Characteristics Quality Assurance and Engineering Participated in Assessments of GE Locomotives Subsuppliers 09/20/90 RLJ42
I'
METHOO 3 Source, Verification Performed at GE Locomotive and its'ajor Subsupplier, GEC Diesels
~
At GE Locomotives, Verify Vital Stages of Engine Manufacture and Testing Meet Drawings, Procedures and Inspection and Test Plan
~
At GEC Diesels, Verify System Assembly and Testing are in Accordance with Inspection and Test Plan Q8/20/90 RLJ43
e
METHOD f
~
Dimensional Checks Performed by Qualified PG&E Inspectors
~
Material/Hardness Testing Utilizing PG &E Equipment Performed by Qualified PG&E Quality Control Personnel
~
Functional Testing Witnessed by PG8E 09/20/90 RLJ44
~
z
~
l(
I
TES TING BEFORE SIXTH DIESEL INSTALLATION A't GE Locomotive
~
Engine Break-in Test At NEI Peebles
~
Generator Tests At GEC Diesels
~
Performance Testing of Engine/Generator Assembly 09/20/90 RLJ46
A
TESTING AT DIABLO CANYON PG8E will Perform the Following Testing After System Installation:
~
Subsystem Star tup Testing
~
Start/Load Cycle Testing Per Reg Guide 1.9 Draft Revision 3
~
All EDG Surveillance Test Procedures 09/20/90 RLJ47
~)
c P
INSTALLATIONAND TES TING SCHEDULE
~
Installation
~
Tie-In
~
Testing
~
Plant Outage Schedule 09/20/90 RLJ23
~
~ >
l.
~
t
6th DIESEL SCHEDULE 1990 1991 1992 1993 Prepare DG Room Aug Mar Install Diesel May Nov Pre-Tie in Testing Aug Feb Preliminary Procedures Revision/Training:
Tie-in and Final Testing
- Feb Apr
- Final Procedures
- RevisionlTraining May 1R4 Feb Apr 2R4 Sept Noy Feb 1R5 Sept Nov Jan Apr 2R5 Feb Apr 8
, J Q
IA I~
FINAL TIE-IN OF OG 2-9
~
DG 1-3
\\
Disconnect DG 1-3 From Unit 2 Test DG 1-3 for Unit 1
~
DG 2-3 Perform Final Electrical Terminations Construction/Star tup Testing Regulatory Guide 1.9 Testing Includes 23 Starts and Load Cycle Tests
~
Current Technical Specification Allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
~
Current Schedule Projects 2 Months 09I19I90 RLJ16
~ ~
l
~*
>e
BASIS FOR FORECAST COMPLETION IN 285
~
Development of Supplier Quality Requirements Delayed PO Issuance
~
Complicated Procurement Interface Requirements
~
Overall Complexity of Dedication Process
~
Coordination with Plant Programs and Procedures
~
Quality Over Schedule 09/20/90 RLJ48
)