DCL-90-036, Responds to NRC Bulletin 88-011 & Forwards Nonproprietary WCAP-12416, Evaluation of Thermal Stratification for Diablo Canyon Units 1 & 2 Pressurizer Surge Line, & Proprietary WCAP-12415.Proprietary Rept Withheld (Ref 10CFR2.790(b)(4))
| ML16341F528 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/01/1990 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML16341F529 | List: |
| References | |
| DCL-90-036, IEB-88-011, NUDOCS 9002080351 | |
| Download: ML16341F528 (6) | |
Text
ACCELERATED D STRIBUTION DEMONSTRATION SYSTEM C
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET 05000275 05000323
SUBJECT:
Responds to NRC Bulletin 88-011
& forwards WCAP-12416 proprietary %CAP-12415.
DISTRIBUTION CODE:
IE30D COPIES RECEIVED:LTR I ENCL J SIZE:
TITLE: Bulletin 88-11 Pressurizer Surge Line TEermal Stratification NOTES ACCESSION NBR:9002080351 DOC.DATE: 90/02/01 NOTARIZED: YES FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, U it 2 acific Ga AUTH.NAME AUTHOR AFFILIATION SHIFFER,J.D.
Pacific Gas
& Electric Co..+~ ~~~
~~>>4]+Vi4 RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Documen Control Desk)
RECIPIENT ID CODE/NAME PD5 LA ROOD,H COPIES LTTR ENCL 1
0 1
1 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DOA AEOD/ROAB NRR HOU,S NRR KUO,P NRR/DOEA/OEAB11 NRR/DREP/PEPB9D NRR/~JIAS/ LRB12 CREOLE 8
RGN5 F~~ 01 EXTERNAL: LPDR NSIC 1
1 1
1 1
1 1
1 1 g!
NRC PDR In P AEOD/DSP/TPAB NRR CHAN,T NRR KADAMBI,P NRR/DET/EMEB9H3 NRR/DOEA/OGCB11 NRR/DST 8E2 NUDOCS-ABSTRACT RES/DSIR/EIB 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1P NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL 22
0
Pacific Gas and Efectrfc Company 77 Beate Street San Francisco, CA 94106 415/972.7000 415/973-4684 James
- 0. Shiffer Senior Vice President and General Hanager Nuclear Power Generation February 1,
1990 PGhE Letter No. DCL-90-036 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1
and 2
Response
to NRC Bulletin 88-11 Gentlemen:
In accordance with reporting requirement no.
3 of NRC Bulletin 88-11, "Pressurizer Surge Line Thermal Stratification," this letter provides notification that Bulletin Actions l.b and l.d have been completed for Diablo Canyon Units 1
and 2.
Response
to Bulletin Action l.a regarding completion of surge line inspection activities was provided in PGLE letter DCL-89-021, dated January 30, 1989.
- Thus, PGhE's actions related to NRC Bulletin 88-11 are completed.
Bulletin Action l.b requested performance of a plant specific analysis to demonstrate that the pressurizer surge line meets the applicable design codes for the licensed life of the plant, considering the phenomenon of thermal stratification.
Bulletin Action l.d requested updating of the plant specific stress and fatigue analyses to ensure compliance with applicable Code requirements.
P E
R 1
A i
n 1.
n l.
In support of PG&E's response, enclosed are:
1.
WCAP-12415, "Evaluation of Thermal Stratification for the Diablo Canyon Units 1
and 2 Pressurizer Surge Line" (Proprietary) 2.
HCAP-12416, "Evaluation of Thermal Stratification for Diablo Canyon Units 1
and 2 Pressurizer Surge Line" (Non-Proprietary) 90020<0~51 90020l PDR ADOCK 05000275 9
PDC the Westinghouse has performed a detailed, plant specific analysis of the Diablo Canyon pressurizer surge lines.
From the analysis, PGhE concludes that thermal stratification does not affect the integrity of the pressurizer surge lines for Diablo Canyon Units 1
and 2.
The existing as-built piping and support layout remain in compliance with the applicable code requirements for the design life (including 250 heatup and cooldown events).
PGhE has updated the Diablo Canyon stress and fatigue analyses to ensure compliance with the applicable codes and license commitments, including ASHE Section III fatigue analysis requirements.
Document Control Des'GIIE Letter No. DCL-90-036 February 1,
1990 Also enclosed is a Westinghouse authorization letter, CAH-89-122, Proprietary Information Notice, and accompanying Affidavit.
As HCAP-12415 contains information proprietary to Hestinghouse Electric Corporation, it is.supported by an affidavit signed by Westinghouse, the owner of the information.
The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the supporting Westinghouse Affidavit should reference CAW-89-122 and should be addressed to R. A. Hiesemann, Manager of Regulatory Im Legislative Affairs, Hestinghouse Electric Corporation, P.O.
Box 355, Pittsburgh, Pennsylvania 15230-0355.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Subscribed to in San Francisco, California this 1st day of February 1990.
Respectfully submitted, Pacifi Gas and Electric Company Howard V. Golub Richard F.
Locke Attorneys for Pacific Gas and Electric Company By D. Shif enior Vice President and General Manager Nuclear Power Generation Subscribed and sworn to before me this 1st day of February 1990 Bianca E; Zelnik, Notary Public for the City and ounty of San Francisco State of California My commission expires July 30, 1991.
(w/HCAP-12415)
(w/HCAP-12415)
By Richard F.
Locke cc:
A. P.
Hodgdon J.
B. Martin M. M. Mendonca P.
P. Narbut H.
Rood CPUC Diablo Distribution Enclosure 3031S/0077K/JHA/2225 (w/HCAP-12415)
(w/HCAP-12415)
(w/HCAP-12415)
(w/HCAP-12416)
(w/o Enc.)
OFFICIALSEAL BIANCAE. ZELNIK NOSY PUBLIC - CALIFORNIA San Francisco County MyCommtssIon Expires July IL1991