ML16341D522

From kanterella
Jump to navigation Jump to search
Submits Background Matl,Including Sept 1976 Suppl 5 to Safety Reevaluation Rept & Util Seismic Reevaluation for Postulated..., for BNL Advisory Board on Soil Interaction for Plant long-term Seismic Reevaluation Program.W/O Encls
ML16341D522
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/19/1985
From: Schierling H
Office of Nuclear Reactor Regulation
To: Reich M
BROOKHAVEN NATIONAL LABORATORY
References
NUDOCS 8512050080
Download: ML16341D522 (2)


Text

Docket Nos.:

50-275 and 50-323 tgq as%

Dr. Morris Reich Structural Analysis Division Building 129 Brookhaven National Laboratory

Upton,

)ew York 11973 Dear Mr.

SUBJECT:

Reich:

DIABLO CANYON POWER PLANT - BACKGROUND INFORMATION As agreed at our meeting on October 24, 1985 we are hereby providing the following )ackground information f'r the Brookhaven Advisory Board on Soil nteraction for the Diablo Canyon long-term seismic reevaluation Structure program:

1.

Su plement 5 to NRC Safety Reevaluation Report for Diablo Canyon Po er Plant, September 1976.

2.

Pacific Gas and Electric Company, "Seismic Reevaluation for Postulated 7.5 Hosgri Earthquake - Units 1 and 2, Diablo Canyon Site",

USNRC Doc et Nos.

50-275 and 50-323, Sections 1.0, 3.0 and 4.0.

Sincerely,

,Dtlgtpigf

-'>R Sch1ermz~

Hans Schierling, Project Manager Licensing Branch No.

3 Division of Licensing 3.

Pacific Gas and Electric Company, "Phase I Final Report - Design Verification Program, Diablo Canyon Power Plant",

1982, Sections 1.1 through 1.5, 2.1.1, 2.1.2 and 2.1.6.

The same information has been provided by copy of this letter to the members of the Board'.

Please contact me if further information is needed (301-492-7100).

i I

1 j

1

Enclosures:

As stated cc:

Dr. George', Gasetas Dr.'ndrewI Ve1 etsos Dr. Robert~Whitman Dr. C. J. Constantino DL I 'L H

erling/es 'i G

zghton 11/i) /85 ll//$/85 Distribution:.

w/o enclosures Docket-File 50-275/323 NSIC ACRS (16)

PDR BGrimes LPDR JPartlow PRC System EJordan LB3 Reading OELD, Attorney HSchierling SBrocoum JLee LReiter RRothman PTKuo BSiQOSppap R

ggOCl SSl 1i9 0SppppyS PDR

A

~

~

V