Forwards, Std Order for DOE Work to Assist NRC in Insp & Evaluation of Identified Allegations Re Discrepancies in Const of Facility.Statement of Work Should Be Used as Basis for Preparing Proposal
ML16341D188
Person / Time
Site: Diablo Canyon  
Issue date: 02/07/1985
From: Muir A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Duval R
ENERGY, DEPT. OF
References
CON-FIN-A-0255, CON-FIN-A-255 NUDOCS 8502220366
Download: ML16341D188 (12)


Text

FEB 7 1985 Mr. Richard A. DuVal, Acting Manager

-RECK)VSD San Francisco Operations Office hP<0 U.S. Department of Energy 1333 Broadway, Wells Fargo Building.~-.w<.'.j~jgTG1$ '>

Oakland, CA 94612 p.

t3II5

'Qg

Dear Mr. DuVal:

REGrou v i;.,'.

SUBJECT:

LLNL TfCHNICAL ASSISTANCE TO THE OFFICE OF INSPECTION AND ENFORCEMENT, NRC, " DIABLO CANYON ALLEGATIONS EVALUATION" (FIN A0255)

The enclosed NRC Form 173, "Standard Order for DOE Work" for $ 125,000 is hereby submitted in accordance with Section III.B.2 of the DOE/NRC Memorandum *of Under-standing of February 24, 1978.

This work is urgently required to assist the NRC Region V Office in inspection and evaluation of identified allegations related to alleged discrepancies in construction of the Diablo Canyon nuclear power facility and the SOEW is forwarded without prior proposal.

The work authorization provides for proposal preparation as part of the work scope.

The enclosed statement of work details the required work and should be used as a basis for preparing a proposal.

NRC Form 189 contains the minimum information needed and will be used for the proposal.

Standard terms and conditions for NRC work, as approved by Headquarters, DOE, apply to this effort.

A copy of these terms and conditions has been furnished to your office separately.

The proposal should be submitted within 15 days in four copies to:

U.S Nuclear Regulatory Commission Office of Inspection and Enforcement ATTN: Debra J. Corley, Contract Administrator (Mail Stop EW/W-359)

Washington, D.C.

20555 Please indicate DOE acceptance by signing and returning the enclosed NRC Form 173 to the Office of the Controller, Division of Accounting and Finance, ATTN:

D. B. Dandois with a copy to the Office of Inspection and Enforcement, ATTN:

C.A. Paugh.

If you have any questions, please contact IE Headquarters Project Manager, Henry Phillips (FTS 492-4531) or If Contract Administrator, D. J. Corley (FTS 492-9772).

Thank you for your assistance.

Sincerely, 85022203hh 850207 PDR ADOCK 05000275 P

PDR Alan P. Muir, Senior Resource Analyst Program Support and Analysis Staff Resource Management and Analysis Branch Office of Inspection and Enforcement

Enclosure:

As Stated cc:

See page 2

RNID B.

SAS: IE CA augh (g-/g 85 I

R A

PAS IE R5 Distribution:

IE C.

A. Paugh, If L.

E. Portner, IE H. Phi 1 1 ips, IE D. B. Dandois, ADM RM5 P

S IE AP 1r

/85 K. Hamill, RV E. B. Frigillana, RV L D. F. Kirsch, RV~

R. T. iDodds, RV PSAS Reading

FEB 7 1985 Richard A. DuVal cc:

R.

W. Barber, DOE/EV W. Gallagher, DOE/SAN J.

Johnson, LLNL

I' 1

NRC FORM 173 (2.78)

US. NUCLEAR REGULATOR Y COMMISSION OROE R NUMBER 30-85-27 STANDARDORDER FOR DOE WORK OA TE February 7,

1985 ISSUED TO:

(DOE Office)

San Francisco Operations Office ISSUED BY: (NRC office) 0ffice of Inspection and Enforcement ACCOUNTING CITATION APPROPRIATION SYMBOL 31X0200.305 84R NUMBER PERFORMING ORGANIZATIONAND LOCATION Lawrence Livermore National Laboratory Livermore, CA 30-19-02-01 FIN NUMBER WORK PERIOD

~ THIS ORDER FIN TITLE Diablo Canyon Allegations Evaluations OBLIGATIONAVAILABILITYPROVIDED BY:

A. THIS ORDER B.

TOTAL OF ORDERS PLACED PRIOR TO THIS DATE WITH THE PERFORMING ORGANIZATION UNDER THE SAME "APPROPRIATION SYMBOL"ANO THE FIRST FOUR DIGITS OF THE "8&R NUMBER"CITED ABOVE.

FIXED G "8"jl1/85 s 125,000 s

0 ESTIMATED Rl/10/85 C. TOTAL ORDERS TO DATE (TOTALA & 8) s 125,000 D. AMOUNTINCLUDED IN "C" APPI.ICABLE TO THE "FIN NUMBER" CITED IN THIS ORDER.

s 125,000 FINANCIALFLEXIBILITY:

Q FUNDS WILLNOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATIONQN OBLIGATIONS AUTHORI2ED.

Q FUNDS MAY BE REPROGRAMMED NOT TO EXCEED + 10'F FIN LEVEL UP TOS50K. LINE C CONSTITUTES A LIMITATION QN OBLIGATIONSAUTHORI2ED.

STANDARDTERMS AND CONDITIONS PROVIDED DQE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.

ATTACHMENTS:

THE FOLLOWING ATTACHMENTSARE HF REBY MADE A PART OF THIS ORDER:

DSTATEMENTOF WOR K Q ADDIT(QNALTERMS ANO CONDITIONS Q OTHER SECURITY:

Q WORK ON THIS ORDER IS NOT CLASSIFIED.

0 WORK ON THIS ORDER INVOLVESCLASSIFIED INFORMATION. NRC FORM 'I87 IS ATTACHED.

REMARKS:

This order provides funds for authorization of work, which is urgently required, as delineated in the attached statement of work, and requests that a proposal be submi tted within 15 days to Debra J.

Cori ey, I E, Due to the urgency associated with this work, the accepted NRC Form 173 should be telecopied to Debra J.

Cor ley,'NRC/IE, prior to February 11, 1985.

The telecopier phone numbers are FTS 492-7376 or 492-7285 and can be verified on 492-7293.

SI G NATUR E lan P. Nuir ISSUING AUTHORITY R~eoucce nelyet SIGNATURE'CCEPTING ORGANIZATION TI TI. E RNKAB, PSAS, IE NRC FORM 173 (2.78)

TITLE OA TE

I

/

II J

STATEMENT OF WORK TITLE:

Diablo Canyon Allegations Evaluation FIN:

A0255 BSR NO. 30-19-02-01 PROJECT MANAGER:

Henry Phillips (FTS492-4531)

TECHNICAL MONITOR:

Robert T. Dobbs,'V (FTS 463-3720) 1.

BACKGROUND During the past year, 83 allegations requiring specialized review, inspection and documentation activities have been identified.

Technical assistance is needed related to these allegations as deemed advisable by the NRC Region V

Allegation Review Board.

NRC Region V has requested assistance from the NRC Office of Inspection and Enforcement in procuring technical assistance services for these activities.

The allegation review, inspection and documentation effort will. be per-formed by a team effort including a

Team Leader from NRC Region V and six specialists provided by LLNL.

The NRC Team Leader will provide the tech-nical direction at the Diablo Canyon facility, act as coordinator with the licensee and specialists, and assume overall responsibility for the activities of the team.

The NRC will make necessary arrangements with the licensee for security clearances.

2.

0 EtEUIRE Provide technical assistance services to the NRC Office of Inspection and Enforcement for support to NRC Region V to assist in independent inspection and evaluation of identified allegations related to alleged discrepancies in construction at the Diablo Canyon nuclear power facility.

The inspection and evaluation activities will be in the areas of welding and nondestructive examination (NDE), electrical/instrumentation construction, mechanical con-struction (including piping, supports, restraints, hangers and snubbers),

civil/structural construction, gA/corrective actions/documentation and material traceability/control.

The following technical assistance services are required.

a.

Two specialists to evaluate allegations related to welding and provide technical services in the areas of welding/metallurgy and nondestructive examination (NDE) including MT, PT, UT and RT.

b.

One specialist in mechanical construction capable of evaluating allegations and providing technical services related to mechanical equipment and piping installations including hangers, restraints, supports and snubbers.

h

c.

One specialist in electrical construction capable of evaluating allegations and providing technical services related to electrical/

instrumentation equipment installation and termination, cable pulling, conduit erection, and cable tray erection.

d.

One specialist in civil/structural construction capable of evaluating allegations and providing technical services related to concrete construction, concrete anchor bolts and embedments, and structural steel construction/weld'ing.

e.

One specialist in quality assurance, corrective action systems, and material traceability/control, capable of evaluating alle-gations and providing related technical services.

Consent of specialists selected by LLNL should be obtained from the NRC Team Leader prior to initiation of work.

Therefore, resumes and conflict of interest determination should be provided for each specialist.

3, ESTIMATED LEVEL OF EFFORT It is estimated that a preparatory meeting for this program will take place at NRC Region V offices during the week of February 25, 1985.

The review of background information, site inspection and documentation work will follow and be completed by May 1, 1985.

The participation and time duration 'for each specialist will be commensurate with the number of allegations and their complexity for each speciality, and will be identified by the NRC Team Leader.

A total of one staff year of effort is estimated to be required for site and office work, and meeting attendance.

4.

REPORT REIEUI ENENTS The following reports are required:

a.

Progress reports of information review, inspection and documentation activities will be provied to the Team Leader.

These will be required on an intermittant basis identified by the Team Leader.

b.

A separate report of findings and other information for each assigned allegation task will be provied to the Team Leader.

The Team Leader will identify the appropriate format.

C.

A monthly letter status reports will be submitted by the 15th of the month to the IE Project Manager, Henry Phillips, NRC Team Leader, R.

Dodds (Region V) and to the IE Contract Administrator, Debra Corley, that summarizes (1) progress

summary, (2) delays encountered or antic-ipated and the work planned for the next month, (3) the personnel time expenditures during the previous month, and (4) the costs generated against the work effort.

The report will identify the FIN, the project title, and the reporting period; the personnel time and cost expenditures will be submitted in the following format:

A

~

1 7

Current Month I.

Direct Staff Efforts (months of charged effort XXX Year to Date XXX II.

Direct Salaries Materials and Services ADP Support Subcontracts Travel Indirect Labor Cost Other (as needed)

General and Administrative Expense III. Funding Status:

XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX FY85 rojecte Funding Level F 85 unds Rec'd to Date FY85 unding Bal Needed XXX XXX XXX 5.

PLACE OF PERFORMANCE The Diablo Canyon site, 12 miles WSW of San Luis Obispo, California.

6.

PERIOD OF PERFORMANCE The period of performance from initiation through completion of this Task Order shall commence February ll, 1985 and end on May 10, 1985.

7.

NRC TEAM LEADER: R. T.

Dodds (NRC Region V).

gk

'7