IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
17 Table:
9.8-6 Page:
1 of 1 ESSENTIAL SERVICE WATER SYSTEM MALFUNCTION ANALYSIS COMPONENT MALFUNCTION COMMENTS AND CONSEQUENCES 1.
Essential service water pumps Rupture of a pump casing Isolate pump and start a redundant pump. Minimum requirements need only two out of four pumps.
2.
Essential service water pumps Pump fails to start One operating pump will supply sufficient flow for one operating Unit. Redundancy is sufficient to provide ample flow for any condition.
3.
Essential service water pump Stop valve on discharge line closed or check valve sticks closed The stop valve and the check valve will be checked by periodic operation of the off-duty pumps during normal operation.
4.
Essential service water pump strainer Strainer casing rupture Isolate and valve in spare train.
5.
Essential service water pump strainer vent or drain valve.
Left open This will be prevented by prestartup and operational checks. On the out-of-service strainer, such a situation would be assessed during periodic checks.