ML16341C173
Jump to navigation
Jump to search
| ML16341C173 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/13/1984 |
| From: | Rehm T NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Kammerer C NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
| Shared Package | |
| ML16341A021 | List: |
| References | |
| 850613, NUDOCS 8406270172 | |
| Download: ML16341C173 (2) | |
Text
June 13, 1984 MEMORANDUM FOR:
C.
- Kamnerer, OCA FROM:
SUBJECT:
T. A. Rehm, EDO UDALL STAFF REQUEST:
DIABLO CANYON The attached draft internal NRC staff report is provided per a request from Dr. Henry Myers.
Please note that, the NRC staff is in the process of evaluating this report, in connection with its preparation o,f, the SSER for Diablo Canyon.
Attachment:
Draft Report - Concern Items on IDVP Evaluation of L/B and S/B Piping and Pipe Support Design cc:
Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal SECY OGC OPE T. A.
Rehm
"~ Assistant for Operat>ons Office of. the".Executive Director.-
for Operations 8406270172 840620 PDR ADOCK 05000275 P-
- ',,'.,PDR.
4 ~