Responds to Re Quality in Design,Const,Operation & Mgt of Facility.Investigation,Insp & Evaluation of Allegations Being Conducted.Commission Will Proceed W/ Authorization for Low Power Operation After Evaluation
ML16341C125
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/29/1984
From: Harold Denton
Office of Nuclear Reactor Regulation
To: English C
ENGLISH & ASSOCIATES
Shared Package
ML16340E282 List:
References
NUDOCS 8404130024
Download: ML16341C125 (14)


Text

Mr. Cary English English

& Associates 1205 Bath Street Santa Barbara, California 93101

Dear Mr. English:

NEAR 2 9 1984 I am responding to your letter of January 31, 1984.

lie share your view that quality in the design, construction, operation, and management of nuclear power plant facilities is a major element to assure the health and safety of the public with respect to the operation of any such facility.

We also share your view that in the case of Pacific Gas and Electric Company's Diablo Canyon Project the high goals of quality have not always been met.

Whenever we have determined that this was the case, we identified such deficiencies to the company and requested that a'ppropriate corrective action be taken.

During the past months we have received numerous allegations and concerns re-garding the design, construction, operation, and management of the Diablo Canyon Nuclear Power Plant.

We are conducting an investigation, inspection and evaluation of these allegations and concerns, as appropriate.

Largely as a result of the allegations, we have also received extensive correspondence regarding the licensing of the Diablo Plant.

'This correspondence, in general, expresses concern about the licensing of the Diablo Plant.

The specific re-quests range from urging us to deny any license to PG&E for the operation of the plant under any circumstances to requests that we expedite licensing of the plant and requests that we proceed with the licensing process after thor-oughly reviewing and evaluating all appropriate safety concerns and taking necessary corrective action for the health and safety of the public.

The latter approach has always been and continues to be the NRC position.

It is for this reason that the Commission suspended the Diablo Canyon Unit 1 oper-ating license in 1981.

After we have completed our review and evaluation of the allegations and concerns, and after PG&E has made any corrections and modifications as we believe are necessary the Commission will proceed with the authorization of criticality and low power operation.

You raised a specific concern regarding the adequacy of experience of the PG&E staff to operate the Diablo Plant.

This particular issue also has been iden-tified recently by the Commission and is an area where the NRC is reassessing its requirements.

The NRC will ensure that PG&E will meet all the appropriate requirements to assure adequate public safety prior to authorizing criticality.

p~ggP02+

aq0329

'PDR',ADOCK 05000275 t

PDR

~

~

I fy

)I

~

~

1 Nr. Cary English Finally, you commented on the possibility and advisability of using the Diablo Plant for purposes other than as a nuclear power plant for the generation of electricity.

This is a matter which is not within the purview and responsibility of the NRC.

Me recommend that you discuss such issues with PGSE as the licensee and owner.

Sincerely, original sgaed by H. ft Deabm Harold R. Denton, Director Office of Nuclear Reactor Regulation

  • See previous concurrence.

LB43:OLI LB43:DL L843:DL BELD AD:L:DL D:OL DD R

0:8@

HSchierl g:kab JLee*

GKnighton* LChandler* TNovak*

DEisenhut*

E ase HDenton 03+33 /84 03/

/84 03/

/84 03/

/84 03/

/84 03/

/84 03/g/84 03/P/84

I f

~

~

1 H

f f

g

),

g

~ ~

B Mr. Cary English Finally, you commented the possibility and advisability of using the Diablo Plant for purposes other than as a nuclear power plant for the generation of electricity.

This is a

m tter which is not w'ithin the purview and responsibility of the NRC.

We recommend hat you discuss such issues with PGIIE as the licensee and owner.

Sincerely, 1

d Harold R. Denton, Director Office'f Nuclear Reactor Regulation DISTRIBUTION:

(Green 14148) (*w/ ncoming)

BBB Egg, EDD NRC PDR*

PPAS L PDR*

SECY (3)

PRC System*

MGarver (w/orig ckt 5 *)

LB¹3 R/F

JMartin, (Reg.

V HSchierling RDeYoung JLee ECase/HDenton MJambor PPAS CChandler (OELD)

TSpeis TNovak/Peggy RMattson RVollmer HThompson BSnyder DEisenhut

  • See previous concurrence.

LB¹3:DL LB¹3'DL LB¹3:DL OELD AD:L'DL D:DL DD'NRR D:NRR HSchierling:kab JLee*

GKnighton* LChandler+ TNovak> '"DEisenhuP ECase HDenton 03/

/84 03/

/84 03/

/84 03/

/84 03/

/84 03/

/84 03/

/84 03/

/84

11 1 ~

ii~

1 SM 1

~ s 1

Mr. Cary English Finally, you ommented on the possibility and advisability of using the Diablo Plant for purp yes other than as a nuclear power plant for the generation of electricity.

Th'i is a matter which is not within the purview and responsibility of the NRC.

We re ommend that you discuss such issues with PGSE as t e licensee and owner.

Sincerely, Harold R. Dento Director Office of Nucl ar Reactor Regulation DISTRIBUTION:

(Green 14148) (*w/inco ing)

NB idg

. Etltl NRC PDR*

PPAS L PDR*

SECY (3)

PRC System*

MGarver (w/orig tpkt 5

)

LB¹3 R/F

JMartin, (Reg.

Vr)'Schierling RDeYoung JLee ECase/HDento MJambor PPAS CChandler (OELD)

TSpeis TNovak/Peggy RMattso RVollmer HThomp on BSnyder DEis nhut

  • See pr ious concurrence.

LB¹3:D LB¹3:DL LB¹3:DL OELD

.DL D

DD:NRR D:NRR HSchjg 1>ng:kab JLee*

GKnighton* LChandler*

ovak n ut ECase HDenton 03/('f/84 03/

/84 03/

/84 03/

/84 03/ )$

84 03+/84 03/

/84 03/

/84

1'

'I*

~ ~ V h(hvh.r I

II

~ j V

g a ~

Iv7Vg 77hg

~.

~ 7 Vh I'h l, IV,V'

~

I i

II 7 l

lh j lih r

~ h I

hi I

V h

hk II hvh v '

II

Mr. Cary English 4lg(A g Fi lly, you commented on the possibility and advisability of the Diablo Plant f

p h

hh gl g

hl f

l f.fly~. fhl is a

ma ter which is no/'within the purview and responsibility of th) NRC.

'We recommen that you d scuss such issues with PG&E as the licensee an owner.

Sincerely, Harold R. Dentp

, Director Office of N

Tear Reactor Regulation DISTRIBUTION:

(Green 14148)

/incomi n MBridgers, 0

NRC PDR*

PPAS L PDR*

SECY (3)

PRC System*

MGarver (w/o ig t t & *)

LB¹3 R/F

JMartin,

( eg.

V)

HSchierling RDeYoung JLee ECase/

enton MJambor PPAS CChandler (OELD)

TSp s

TNovak/Peggy R

ttson RVollmer hompson BSnyder DEisenhut LB¹3: DL L

HSchierling:kab J

03/ g /84 03/

L LB OELD+

AD:L:DL D:DL DD:N R D:NRR Gf ton t.'Chand+er TNovak DEisenhut ECase W HDenton

/84 03/)5/84 03/gg /84 03/

/84 03/

/84 03/

/84 03/

/84

I lit,l,, i l

~

~l:> ~ ~

~"

i> ~ u'sr, h(

~r,~-i~

41

I ~

~

~

~

FROM:

Car'y Engl ish English E Associates TO:

Chairman Palladino ACTION CONTROL COMPL DEADLINE INTERIM REPLY FINAL REPLY FILE LOCATION ATES CONTROL NO.

j4 48 DATE OF DOCUMENT 1

31 84 PREPARE FOR SIGNATURE OF:

OPIA!RMAN" -..

Q EXSOUTIVE DIRECTOR OTHER:

jy<<k-;

<<!II I,

'SSIGN TO Eisenhut g~IC.

DATE INFORMATION ROUTING I!1artin DeYouna Case/Denton 1..PPAS 2.

Speis 3.

Yiattson

.4.

Vollmer 5.

Thompson Snyder

. Snyder DESCRIPTION Q LETTER 0 MEMO I-I REPORT + OTHER Comments concerning Diablo Canyon SPECIAL INSTRUCTIONS OR REMARKS.

I P

Iy g

y II I

I

"-.c.'

r~%.* ~j y

Kyr!',I

'I:"<<,"p,

,'<<'y, j

'II

<<IIy, rt r

NRC FORM P~

(640)

I W(

t,l; I

y EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL I.

I r

r

,I,,, I, y"y I

DISTRIBUTION:

(Green Ticket No.

14148)

(*v(/incoming)

Docket=File~~

(50-275/323)

NRC PDR*

L PDR*

PRC System*

LBP3 Reading*

HSchierling JLee*

MJambor CChandler (OELD)

TNovak/Peggy RVollmer BSnyder MBridgers, (EOOD 14148)*

PPAS SECY (3)

MGarver (EDOP 14148)*

JMartin, Region V

RDeYoung ECase/HDenton TSpeis RMattaon HThompson DGEisenhut

'l

~

V P

f p I