ML16341B996

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28 & Rev 2 to Verification of Pressure,Temp,Humidity..., Interim Technical Rept 14
Date released: 02/07/2020 Download: ML16341B996


Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28
ML20024D083
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/25/1983
From: Sestak F
STONE & WEBSTER ENGINEERING CORP.
To:
References
Download: ML20024D083 (33)
Forwards Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28 & Rev 2 to Verification of Pressure,Temp,Humidity..., Interim Technical Rept 14
ML17083B195
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/28/1983
From: Krechting J
STONE & WEBSTER ENGINEERING CORP.
To: DENTON H R, MANEATIS G A, MARTIN J B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
References
Download: ML17083B195 (64)
Rev 2 to Verification of Pressure,Temp,Humidity & Submergence Environs Used for Safety-Related Equipment Spec Outside Containment for Auxiliary Feedwater Sys & Control Room Ventilation..., Interim Technical Rept 14
ML16341B995
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/25/1983
From: Sestak F
STONE & WEBSTER ENGINEERING CORP.
To:
References
Download: ML16341B995 (88)