ML16341B261
ML16341B261 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/18/1979 |
From: | Shackleford B PACIFIC GAS & ELECTRIC CO. |
To: | NRC COMMISSION (OCM) |
Shared Package | |
ML16341B262 | List: |
References | |
NUDOCS 7912260280 | |
Download: ML16341B261 (4) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML16341D1311999-10-15015 October 1999
[Table view]Discusses Arrangements Made During 991013 Telephone Conversation for Administration of Licensing Exams at Diablo Canyon Power Plant Facility During Wks of 990410 & 990417. Requests Submittal of Ref Matls by Jan 15,2000 ML16341D1291999-10-14014 October 1999 Forwards Insp Repts 50-275/99-15 & 50-323/99-15 on 990920- 24.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML16342A9081999-09-30030 September 1999 Informs That Staff Review of Util 980327 Response to GL 96-06, Degradation of SG Internals, Did Not Identify Any New Concerns & Concludes That Util Response to GL Provides Reasonable Assurance That Conditions of SG Compliant IR 05000275/19990071999-09-29029 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/99-07 & 50-323/99-07 on 990727 ML16342A9091999-09-29029 September 1999 Forwards SER Granting Requests for Relief NDE-12.2R8, NDE-13-2R8,NDE-14.2R8,NDE-22.2R8 & NDE-25.2R8 Pursuant to 10CFR50.55a(g)(6)(i) for Second 10-year ISI Interval for Diablo Canyon,Unit 2 ML16342A8981999-09-20020 September 1999 Requests That PG&E Update ERDS Dpls Submitted in to Provide Missing Info ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML16342A8461999-06-30030 June 1999 Discusses Closeout of Responses to RAI Re GL 92-01,Rev 1, Suppl 1, Rv Structural Integrity, for Plant,Units 1 & 2 ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address IR 05000275/19990061999-06-25025 June 1999 Forwards Insp Repts 50-275/99-06 & 50-323/99-06 on 990418-0529.Two Violations Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl ML16342A8271999-06-16016 June 1999 Announces Corrective Action Program Insp at Plant,Units 2 & 2,reactor Facilities on 990726-30.Insp Will Evaluate Effectiveness of Activities for Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations ML16342A8151999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990312,which Transmitted Change 16, Rev 18 to Physical Security Plan for Diablo Canyon Under Provisions of 10CFR50.54(p).No NRC Approval Required ML16342C1221999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan,Rev 3,Change 17, Under Provisions of 10CFR50,App E,Section V ML16342A8081999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon Power Plant Emergency Plan Implementing Procedures EP G-1,Emergency Classifications & EP Activation, Rev 27,under Provisions of 10CFR50,App E,Section V ML16342A8061999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Diablo Canyon NPP Er Plan Implementing Procedures,Ep G-1, Emergency Classification & Ep,Activation,Rev 28,under 10CFR50,App E,Section V Provisions.No NRC Approval Required ML16342C1211999-06-0303 June 1999 Refers to 990602 Meeting with Util in Arlington,Tx Re Planned Electrical Configuration for Refueling Outage 2R9 During Midloop Operation.List of Attendees & Handouts Used by Util Encl ML16342A7951999-05-25025 May 1999 Informs of NRR Reorganization Effective 990328 & That as Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML16342A7891999-05-14014 May 1999 Forwards Insp Repts 50-275/99-04 & 50-323/99-04 on 990307-0417.Four Violations Identified & Being Treated as non-cited Violations ML16342C1141999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407 to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals ML16342A7691999-04-14014 April 1999 Requests That First Page of Ltr Transmitting NRC Insp Repts 50-275/99-03 & 50-323/99-03 Be Replaced with Encl Page. Initial Transmittal Contained Minor Editorial Error ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 ML16342A7571999-04-0808 April 1999 Forwards SER Accepting Util Emergency Core Cooling Sys Manual & Automatic Switchover from Refueling Water Storage Tank to Containment Sump for Diablo Canyon Power Plant IR 05000275/19990031999-04-0505 April 1999 Corrected Ltr Forwarding Insp Repts 50-275/99-03 & 50-323/99-03 on 990124-0306.Minor Editorial Error Corrected on First Page DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML16342A7381999-03-23023 March 1999 Refers to PG&E SG 90-day Rept, 90-Day Rept for Voltage- Based Alternate Repair Criteria - Unit 2 Eighth Refueling Outage, Dtd 980628.Forwards SE Concluding PG&E Implemented voltage-based Criteria in Accordance with Licensing Basis ML16342A7341999-03-18018 March 1999 Forwards FEMA Final Rept for 981104,emergency Preparedness Exercise.Rept Indicates No Deficiencies During Exercise, However 7 Areas Requiring Corrective Action Identified DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl IR 05000275/19980201999-02-19019 February 1999 Forwards Insp Repts 50-275/98-20 & 50-323/98-20 on 981206- 990123 & Notice of Violation Re Failure to Obtain Transient Combustible Permits for Storing Compressed Gas Cylinders Containing Flammable Hydrogen Into safety-related Areas ML16342A6881999-02-16016 February 1999 Forwards Insp Repts 50-275/99-301 & 50-323/99-301 on 990125- 28.No Violations Noted.Insp Included Evaluation of Six Applicants for Senior Operator Licenses.All Applicants Satisfied Requirements of 10CFR55 ML16342C0931999-02-0909 February 1999 Informs That by Ltrs & 1223,NRC Responded to WOG Positions Re Corrective Actions to Address Generic Aspects of part-length Control Rod Drive Mechanism Housing Issue as Result of Leak at Prairie Island Unit 2 on 980123 ML16342A6981999-02-0303 February 1999 Refers to Investigation Conducted by OIG Re Activities at Dcnpp.Informs That Based on Evidence Developed During Investigation,Testimony & Document Reviews,Allegation Re Employee Discrimination Not Substantiated.Synopsis Encl ML16342C0911999-02-0202 February 1999 Informs of Plans to Administer Gfes of Written Operator Licensing Exam at PG&E Facility on 990407.Names of Candidates for Exam & Personnel Proctoring Exam Requested by 990305 ML16342A6701999-01-29029 January 1999 Forwards Request for Addl Info Re 970310 PG&E Rev 1 of W Technical Rept of WCAP-14797 (Proprietary) & WCAP-14798 (non-proprietary), Generic W* Tube Plugging Criteria for 51 Series Generator Tubesheet Region Wextex Expansions ML16342A6691999-01-29029 January 1999 Refers to 990115 Meeting Conducted at San Luis Obispo.Staff Presented Results of Safety Culture Survey.Survey Addressed Identification & Resolution of Problems & Mgt Influence.List of Attendees,Presentation Slides & Summary of Survey Encl ML16342A7151999-01-29029 January 1999 Discusses 990115 Meeting Conducted at Embassy Suites in San Luis Obispo Re Results of Util Safety Culture Survey. List of Attendees,Presentation Slides & Summary of Safety Culture Survey Provided by Licensee Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML16342A6451999-01-12012 January 1999 Discusses Insp Repts 50-275/98-21 & 50-323/98-21 on 981204-18 & Forwards Nov.Violation Identified,Involving Two Examples of Failure to Meet NRC Requirements.Insp Focused on Operator Performance in Response to 981201 Manual RT IR 05000275/19980151999-01-0707 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weaknesses Noted in Insp Repts 50-275/98-15 & 50-323/98-15 on 981120 ML16342A6391999-01-0606 January 1999 Forwards Insp Repts 50-275/98-17 & 50-323/98-17 on 981102-05 & 1207-11.No Violations Identified ML16342A6431999-01-0505 January 1999 Refers to NRC 981230 Response to D Lochbaum 981124 Petition That Request Mod of Operating Licenses for Diablo Canyon. Correct Date for Public Meeting Should Have Been 990115, Instead of 990111 ML16342C0811998-12-30030 December 1998 Forwards Safety Evaluation Re Inservice Testing Relief Request P-RR5, Auxiliary Saltwater Pump Performance Using Evaluation of Pump Curves ML16342C0831998-12-29029 December 1998 Advises of Planned Insp Effort Resulting from Dcnpp Insp Planning Review Held on 981202.Historical Listing of Plant Issues,General Description of PIM Table Labels & Insp Plan for Next Eight Months Encl ML16342A6251998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 1999-09-30 Category:INCOMING CORRESPONDENCE MONTHYEARML18107A7011999-06-25025 June 1999
[Table view]Requests Rev of NRC Records to Reflect Change of PG&E Address DCL-99-081, Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl1999-06-18018 June 1999 Forwards Rev 15 to Diablo Canyon Power Plant,Units 1 & 2 IST Program Plan.Detailed Summary of Changes to IST Program Plan,Encl DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld DCL-99-005, Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included1999-01-22022 January 1999 Forwards Responses to 981105 & 981118 RAIs Re LAR 98-06,to Revise RCS Pressure & Temperature Limit Curves to Be Applicable Through 16 Efpy.Rev 0 to Calculation N-NCM-97009, Included ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-116, Forwards Response to NRC 980707 & 09 RAIs Re LAR to Convert Current TS Sections 1.0,2.0 & 3.0 to Improved Std TS1998-08-28028 August 1998 Forwards Response to NRC 980707 & 09 RAIs Re LAR to Convert Current TS Sections 1.0,2.0 & 3.0 to Improved Std TS DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments DCL-97-033, Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.901997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld DCL-96-214, Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld1997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld ML20100L4631996-02-23023 February 1996 Forwards Response to NRC Enforcement Action 95-279 Re Violations Noted in Insp Repts 50-275/95-17 & 50-323/95-17 on 951021-1208.Corrective Actions:Directive Was Issued to Plan 2R7 W/Six Day Work Schedule DCL-96-036, Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr1996-02-20020 February 1996 Forwards Public Version of Rev 18 to EPIP EP EF-1, Activation & Operation of Technical Support Ctr ML20097E9341996-01-25025 January 1996 Forwards Public Version of EPIP Update for Diablo Canyon Power Plant,Units 1 & 2 DCL-95-272, Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training1995-12-11011 December 1995 Supports Comments Submitted by NEI Re Licensee Qualification for Performing Safety Analyses,With Listed Exception.Nrc Should Allow Traning Requirement to Be Met by on-job Training DCL-95-264, Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5))1995-12-0606 December 1995 Forwards Change 6 to Rev 18 to Physical Security Plan.Encl Withheld (Ref 10CFR73.55(d)(5)) DCL-95-262, Forwards Publicly Available Version of Update to Corporate Erpips1995-12-0101 December 1995 Forwards Publicly Available Version of Update to Corporate Erpips ML20094M6001995-11-21021 November 1995 Forwards Final Rept of Investigation & Analysis of Event 29257 Re Substandard Fastner Processed & Sold by Cardinal Industrial Products,Lp,So That Customers Can Evaluate Situation in Light of 10CFR21.21(a)(1)(ii) & (b)(1) DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld1995-09-19019 September 1995 Forwards Proposed Changes to Physical Security Plan.Encl Withheld DCL-95-199, Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan1995-09-14014 September 1995 Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan ML20087A0471995-07-28028 July 1995 Forwards Security Safeguards Info in Form of Change to Proposed Draft Plant Security Program.Encl Withheld DCL-95-153, Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo1995-07-27027 July 1995 Forwards Public Files Version of Revised Corporate Emergency Response Plan Implementing Procedures,Including Rev 14 to 1.1,Rev 8 to 1.2,Rev 11 to 2.1,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 14 to 4.3.W/950807 Release Memo DCL-95-134, Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d)1995-07-0505 July 1995 Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d) ML20086H5461995-06-29029 June 1995 Forwards Final Exercise Rept for 931020,full Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response plans,site-specific to Plant.No Deficiencies Noted DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld1995-02-28028 February 1995 Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld DCL-95-039, Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo1995-02-23023 February 1995 Forwards Public Version of Revised Epips,Including EPIP Table of Contents,Rev 18 to EP G-2,rev 3 to EP OR-3,rev 17 to EP EF-1 & Rev 3 to EP EF-9.W/950306 Release Memo ML18101A5671995-02-17017 February 1995 Informs of Improper Presentation of Jet Expansion Model in Bechtel Technical rept,BN-TOP-2,Rev 2 Design for Pipe Break Effects Issued May 1974.NRC May Need to Consider Evaluating Consequences of Potential Misapplication of Expansion Model 1999-06-25 Category:UTILITY TO NRC MONTHYEARDCL-90-202, Forwards Public Version of Corporate Emergency Response Plan Implementing Procedures (Ip),Including Rev 7 to IP 2.2,Rev 4 to IP 3.6,Rev 10 to IP 4.3 & Rev 8 to IP 4.91990-08-0707 August 1990
[Table view]Forwards Public Version of Corporate Emergency Response Plan Implementing Procedures (Ip),Including Rev 7 to IP 2.2,Rev 4 to IP 3.6,Rev 10 to IP 4.3 & Rev 8 to IP 4.9 DCL-90-128, Forwards Response to Violations Noted in Insp Repts 50-275/90-02 & 50-323/90-02 Re Unauthorized Individuals Gaining Access to Vital Areas & Failure to Protect Safeguards Matl.Response Withheld1990-05-17017 May 1990 Forwards Response to Violations Noted in Insp Repts 50-275/90-02 & 50-323/90-02 Re Unauthorized Individuals Gaining Access to Vital Areas & Failure to Protect Safeguards Matl.Response Withheld ML20042G6491990-05-10010 May 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) DCL-90-123, Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)1990-05-10010 May 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) DCL-90-110, Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection1990-04-26026 April 1990 Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection ML16341F6901990-04-26026 April 1990 Forwards Public Version of Rev 9 to Corporate Emergency Response Plan 4.3, Radiological Analyses & Protection. DCL-90-109, Forwards Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4, Per Tech Spec Paragraph 6.9.1.8.a1990-04-24024 April 1990 Forwards Rev 0 to Core Operating Limits Rept (COLR) COLR 2-4, COLR for Diablo Canyon Unit 2 Cycle 4, Per Tech Spec Paragraph 6.9.1.8.a DCL-90-090, Forwards Response to Questions on Geology/Seismology/ Geophysics/Tectonics in long-term Seismic Program Final Rept.Proprietary Data Withheld (Ref 10CFR2.790).W/one Oversize Drawing1990-04-0202 April 1990 Forwards Response to Questions on Geology/Seismology/ Geophysics/Tectonics in long-term Seismic Program Final Rept.Proprietary Data Withheld (Ref 10CFR2.790).W/one Oversize Drawing DCL-90-084, Forwards Rev 17 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21)1990-03-26026 March 1990 Forwards Rev 17 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21) ML20033H1331990-03-21021 March 1990 Provides List of Property Insurance Coverage DCL-90-077, Forwards Public Version of Rev 8 to Corporate Emergency Response Plan Implementing Procedure 4.3, Radiological Analysis & Protection1990-03-20020 March 1990 Forwards Public Version of Rev 8 to Corporate Emergency Response Plan Implementing Procedure 4.3, Radiological Analysis & Protection DCL-90-045, Forwards Public Version of Rev 11 to EPIP EP G-4, Personnel Accountability & Assembly. W/900305 Release Memo1990-02-14014 February 1990 Forwards Public Version of Rev 11 to EPIP EP G-4, Personnel Accountability & Assembly. W/900305 Release Memo ML16341F5581990-02-0606 February 1990 Forwards Proprietary WCAP-12495 & Nonproprietary WCAP-12496, Review of Flow Peaking & Tube Fatigue in Diablo Canyon Units 1 & 2 Steam Generators Per El Murphy Aug 1989 Request DCL-90-038, Forwards Proprietary WCAP-12495 & Nonproprietary WCAP-12496, Review of Flow Peaking & Tube Fatigue in Diablo Canyon Units 1 & 2 Steam Generators Per El Murphy Aug 1989 Request1990-02-0606 February 1990 Forwards Proprietary WCAP-12495 & Nonproprietary WCAP-12496, Review of Flow Peaking & Tube Fatigue in Diablo Canyon Units 1 & 2 Steam Generators Per El Murphy Aug 1989 Request DCL-90-035, Forwards Public Version of Revised Epips,Including Rev 17 to EP M-1 & EP M-6 & Rev 13 to EP G-2S1.W/900215 Release Memo1990-01-30030 January 1990 Forwards Public Version of Revised Epips,Including Rev 17 to EP M-1 & EP M-6 & Rev 13 to EP G-2S1.W/900215 Release Memo ML16341F5421990-01-29029 January 1990 Forwards Public Version of Rev 7 to Corporate Erpip Update DCL-90-031, Forwards Public Version of Rev 7 to Corporate Erpip Update1990-01-29029 January 1990 Forwards Public Version of Rev 7 to Corporate Erpip Update DCL-90-008, Forwards Rev 3 to Safeguards Contingency Plan,Per Generic Ltr 89-07.Rev Withheld (Ref 10CFR73.21)1990-01-0909 January 1990 Forwards Rev 3 to Safeguards Contingency Plan,Per Generic Ltr 89-07.Rev Withheld (Ref 10CFR73.21) DCL-89-285, Forwards Public Version of Epips,Consisting of Pages 15,29 & Test Data Sheets to Rev 10 to EP M-4, Earthquake, & Pages 32-1 & 32-3 to Rev 16 to EP M-6, Nonradiological Fire. W/891205 Release Memo1989-11-13013 November 1989 Forwards Public Version of Epips,Consisting of Pages 15,29 & Test Data Sheets to Rev 10 to EP M-4, Earthquake, & Pages 32-1 & 32-3 to Rev 16 to EP M-6, Nonradiological Fire. W/891205 Release Memo ML19327B5191989-10-24024 October 1989 Forwards Endorsements 67 & 68 to Nelia Policy NF-228 & Endorsements 37 & 38 to Maelu Policy MF-103 ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form DCL-89-183, Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)1989-07-0606 July 1989 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML16341F2351989-07-0505 July 1989 Forwards Application for Amends to Licenses DPR-80 & DPR-82, Consisting of License Amend Request 89-08,reducing Boron Concentration in Boric Acid Sys from 12 to 4 Weight Percent, Per Generic Ltr 85-16 DCL-89-162, Forwards Objectives,Guidelines & Participants Developed for 1989 Emergency Preparedness Field Exercise1989-06-13013 June 1989 Forwards Objectives,Guidelines & Participants Developed for 1989 Emergency Preparedness Field Exercise DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages DCL-89-129, Forwards Application for Amends to Licenses DPR-80 & DPR-82, Consisting of License Amend Request 89-05,changing Tech Spec to Increase Diesel Generator Allowed Outage Time from 72 H to 7 Days1989-05-12012 May 1989 Forwards Application for Amends to Licenses DPR-80 & DPR-82, Consisting of License Amend Request 89-05,changing Tech Spec to Increase Diesel Generator Allowed Outage Time from 72 H to 7 Days ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively DCL-89-051, Forwards Public Version of Rev 5 to EPIP EP R-3 & Rev 10 to EP G-4.W/undtd Release Memo1989-03-0202 March 1989 Forwards Public Version of Rev 5 to EPIP EP R-3 & Rev 10 to EP G-4.W/undtd Release Memo DCL-89-042, Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21)1989-02-23023 February 1989 Forwards Rev 16 to Physical Security Plan,Per NRC .Rev Withheld (Ref 10CFR73.21) ML20235J2191989-02-17017 February 1989 Forwards Endorsements,Including Endorsement 3 to Nelia Certificate NW-132,Endorsement 3 to Maelu Certificate MW-73, Endorsement 4 to Nelia Certificate NW-51 & Endorsement 4 to Maelu Certificate MW-135 DCL-89-015, Forwards Public Version of Rev 6 to Corporate Emergency Response Plan & Implementing Procedure Updates.W/Release Memo1989-01-24024 January 1989 Forwards Public Version of Rev 6 to Corporate Emergency Response Plan & Implementing Procedure Updates.W/Release Memo DCL-89-008, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 10 to EP G-1,Rev 4 to EP RB-15:B,Rev 3 to RB-15:G & Rev 0 to EP RB-15:O.W/undated Release Memo1989-01-10010 January 1989 Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 10 to EP G-1,Rev 4 to EP RB-15:B,Rev 3 to RB-15:G & Rev 0 to EP RB-15:O.W/undated Release Memo DCL-88-303, Forwards Proprietary WCAP-11312,Rev 1 & Nonproprietary WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance Optimization.... WCAP-1312,Rev 1 Withheld (Ref 10CFR2.790)1988-12-12012 December 1988 Forwards Proprietary WCAP-11312,Rev 1 & Nonproprietary WCAP-11966, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/Surveillance Optimization.... WCAP-1312,Rev 1 Withheld (Ref 10CFR2.790) DCL-88-302, Forwards Proprietary WCAP-12064 & Nonproprietary WCAP-12065 Repts in Support of Util Review of Steam Generator Tubing at Plant for Susceptibility to Fatigue Induced Cracking1988-12-12012 December 1988 Forwards Proprietary WCAP-12064 & Nonproprietary WCAP-12065 Repts in Support of Util Review of Steam Generator Tubing at Plant for Susceptibility to Fatigue Induced Cracking DCL-88-296, Forwards Proprietary WCAP-11594 & Nonproprietary WCAP-11595 Westinghouse Improved Thermal Design Procedure Instrument Uncertainity Calculations for Diablo Canyon Units 1 & 2 & Application for Withholding Proprietary Info1988-12-0909 December 1988 Forwards Proprietary WCAP-11594 & Nonproprietary WCAP-11595 Westinghouse Improved Thermal Design Procedure Instrument Uncertainity Calculations for Diablo Canyon Units 1 & 2 & Application for Withholding Proprietary Info DCL-88-290, Forwards Proprietary WCAP-12064, Diablo Canyon 1 & 2 Evaluation for Tube Vibration Induced Fatigue. All Five Tubes Requiring Corrective Action Removed from Svc During Unit 2 Refueling Outage.Rept Withheld (Ref 10CFR2.790)1988-11-30030 November 1988 Forwards Proprietary WCAP-12064, Diablo Canyon 1 & 2 Evaluation for Tube Vibration Induced Fatigue. All Five Tubes Requiring Corrective Action Removed from Svc During Unit 2 Refueling Outage.Rept Withheld (Ref 10CFR2.790) DCL-88-277, Endorses NUMARC Comments on Proposed Rule 10CFR26 Re Fitness for Duty.Receipt of Matl Should Be Ack on Ltr & Returned in Encl Envelope1988-11-18018 November 1988 Endorses NUMARC Comments on Proposed Rule 10CFR26 Re Fitness for Duty.Receipt of Matl Should Be Ack on Ltr & Returned in Encl Envelope DCL-88-216, Forwards Public Version of Emergency Response Plan Implementing Procedures for Plants,Including IP 4.5, Engineering & Technical Support1988-09-0202 September 1988 Forwards Public Version of Emergency Response Plan Implementing Procedures for Plants,Including IP 4.5, Engineering & Technical Support DCL-88-193, Forwards Proprietary WCAP-11312, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/ Surveillance Optimization Program. Rept Withheld (Ref 10CFR2.790)1988-08-0101 August 1988 Forwards Proprietary WCAP-11312, Westinghouse Owners Group Tech Spec Subcommittee Reactor Trip Breaker Maint/ Surveillance Optimization Program. Rept Withheld (Ref 10CFR2.790) DCL-88-128, Forwards Response to NRC Re Violations Noted in Insp Rept 50-275/88-05.Response Withheld (Ref 10CFR73.21)1988-05-12012 May 1988 Forwards Response to NRC Re Violations Noted in Insp Rept 50-275/88-05.Response Withheld (Ref 10CFR73.21) DCL-88-095, Forwards Changes to Rev 16 of Physical Security Plan & Rev 2 to Training & Qualification Plan.Changes Withheld (Ref 10CFR73.21)1988-04-19019 April 1988 Forwards Changes to Rev 16 of Physical Security Plan & Rev 2 to Training & Qualification Plan.Changes Withheld (Ref 10CFR73.21) DCL-88-051, Forwards Rev 16 to Physical Security Plan.Rev Withheld1988-03-0404 March 1988 Forwards Rev 16 to Physical Security Plan.Rev Withheld ML20151G1181988-02-22022 February 1988 FOIA Request for Documents Re ACRS Subcommittee Meetings on 750218-19 Re Plant ML20147E3651988-02-10010 February 1988 FOIA Request for Documents Re NRC 750318 Summary of ACRS Subcommittee Meeting on 750218-19 ML20236N5361987-11-0909 November 1987 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments 860323-870322. Rept Same as Reporting Interval of Annual FSAR Update Rev DCL-87-269, Forwards Description of Implementation Schedule for Miscellaneous Amends & Revised Pages for Rev 16 to Physical Security Plan & for Rev 2 to Contingency Plan,Per NRC 870924 Request.Schedule & Revised Pages Withheld (Ref 10CFR73.21)1987-11-0909 November 1987 Forwards Description of Implementation Schedule for Miscellaneous Amends & Revised Pages for Rev 16 to Physical Security Plan & for Rev 2 to Contingency Plan,Per NRC 870924 Request.Schedule & Revised Pages Withheld (Ref 10CFR73.21) ML20236H9691987-10-26026 October 1987 Forwards Endorsement 25 to Maelu Policy MF-103 & Endorsement 55 to Nelia Policy NF-228 DCL-87-249, Forwards Page Changes for Rev 16 to Physical Security Plan, Per Util 870826 Commitment in Response to NRC Reaffirming Validity of Violation Opposed in Util1987-10-13013 October 1987 Forwards Page Changes for Rev 16 to Physical Security Plan, Per Util 870826 Commitment in Response to NRC Reaffirming Validity of Violation Opposed in Util DCL-87-216, Responds to NRC Re Violations Noted in Insp Rept 50-323/87-18.Corrective Actions:Procedure OP A-2:II Revised & Reissued to Clarify RCS Level to Be Maintained During mid-loop Operation1987-09-0808 September 1987 Responds to NRC Re Violations Noted in Insp Rept 50-323/87-18.Corrective Actions:Procedure OP A-2:II Revised & Reissued to Clarify RCS Level to Be Maintained During mid-loop Operation 1990-08-07 |
Text
COPIES I.TTH ENCL 1
0 1
0 i
RFGULA TUHY If4FOR'TfAf'IUN OISTHIBUTIUN SYSTEM (HIOS)
AGChSSIUN NBR: 7912i?60280 DOC ~ OATh,: 79/12/16 NO f ARIZEO:
YES DOCKET F ACIL:50-275 Oi ab I o Canyon Nuclear Power P 1 ant g Uni't 1 i Pac i f i c Ga 05000275 50 323 Diablo Canyon Nuclear Power Plant'R Unit 2R Pacific fza 05000323 AUTH ~ TVAI~K AU THOR AFFILIATIVIV SHAGKLEFOHDRB.A Paci fic'Gas 8 Electric Co ~
RFCIP
~ NAHE RKCIPIEfu T AFFILIATION Commission I
SUBJECT:
Forwards Amend 81 in FSAH 5
82 in Hosgri Hept
~
OISTRISUTIO,'T CO'OE:
80018 COPIES RECEI TEO LTR QQRCI6 0 SIZE:
. TI TLh.:
PSAH/F SAR A'lDTS ana Related Correspondence tOTES: ~ L+~~<B,WM ~l I
6 ~ ~F.+ 6~
RECIPIENT COPIES', HECIP IETVI ID GOOK/NAME L I TR ENCL ID CODE/NAIVE ACTION:
05 PM Q. ~~+ ~QQ 1
1 AO BG1 ~~Wf
~
0 LA'L~~~
IN 1 EHIVAL:
0 Hh.G I ILh,"
06 09 GEosc IETu BR 11 I'TfECH FNG BH 13 IATL ENG BR 16 AiuAI YSIS BR 18 AUX SYS BH 20 I L
G SYS BH 22 AO S I f'E TECH 27 EFFL rHT SYS 29 K IRKIUOO AO PLANT SYS AO Sl l'E AfuLYSIS HYOHO~METEUR BR OELD EXTERNAL! 03 LPOH 30 ACRS 1
1 2
1 1,
1 1
1 1
1 1
1 0
1 1
1 1
1 0
n 2
2 1
0 1
10 10 02 uHG POH 08 OPERA LIG BR 10
<AB 12 S T HTJC ENG BH 15 REAC SYS BR 17 GVRK PERF BH 19 COiu TAIN SYS.
PUAKR SYS BH 26 ACCONI'NLYS 28 RAD ASST BR AO FOH KNG AD REAC SAFETY DIREG TOH NRR idP A 04
~ IVSIC 1
1 1
1 1
1 1
'1 1
1 1
1 1
1 1
1 1
0 1
0 1
0 0
1 1
&~c.c-
~OGr e CPS ]~ I K ~R' a~~
f~2Vt979 TUTAL TVUMBhH OF CUP IES HEQUIRKD: LTTR ~
FNGL
e UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSXON In the Matter of
)
)
PACIFIC GAS 'AND ELECTRIC COMPANY.. )
)
Units 1 and 2 - Diablo Canyon Site
)
)
Docket No. 50-275-OL Docket No. 50-323-OL AMENDMENTS NOS. 81 AND 82 I
Pacific Gas and Electric Company hereby submits Amendments Nos.
81 in the FSAR and 82 in the Hosgri Report to its application for an operating license for Units 1 and 2 at its Diablo Canyon Site.
'These amendments include material for Chapters 3, 9, 13, 14, and= 15 I
of the FSAR and Chapters 4 and 4A of the Hosgri Report.
For a brief description, of the changes made by these amendments, see the Summary of Amendment.81 and Summary of Amendment 82 which precede the Removal and Insertion Instructions for these-amendments.
Subscribed in San Francisco, California, this 18th day of
- December, 1979.
Respectfully submitted, PACIFIC GAS AND ELECTRIC COMPANY By Barton W. Shackelford President MALCOLM H.
FURBUSH PHILIP A. CRANE, O'.
Attor eys for Pacif'c goo/
SF
<o/u Subscribed and sworn to before me 18 day of December, 1979 Theodora Cooke, Notary Public in and fo'he City and County of San Francisco, State of California My Commission expires O'anuary 28, 1981 n W
)~- V91g260 ~i~