7 to Updated Final Safety Analysis Report, Chapter 6, Table: 6.2-10, Recirculation Sump Component Design Load Combinations
ML16341B096
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16341B096 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

22 Table:

6.2-10 Page:

1 of 1 RECIRCULATION SUMP COMPONENT DESIGN LOAD COMBINATIONS1 Load Combination Case No.

Description Load Combination 0

Full Recirculation Flow with Clean Main and Remote Strainers; Applicable to Main and Remote Strainers DW2 + TAL3 + DBE4 + FRHL5 + DL6 +

NL(t)7 1

Loads Immediately after the Pipe Rupture; Applicable to Main and Remote Strainers DW(2) + TBL8 + DBE(4) + NL(t)(7) 2 Containment Fill; Forward Flow through Main Strainer with Reverse Flow through Waterway to Remote Strainer DW(2) + TFL9 + DBE(4) + NL(t)(7) +

PFHL10 3

Plugged Main Strainer with Recirculation Flow from Remote Strainer DW(2) + TAL(3) + DBE(4) + FRHL(5) +

DL(6) + NL(t)(7) 4 Pressure Pulse at Instant of Pipe Rupture; Applicable to Main and Remote Strainers DW(2) + TOL11 + PP12 + NL(t)(7) 1 The load combinations are used for the design and qualification of the main and remote strainers and waterway, unless otherwise indicated in the Description column.

2 DW - Dead Weight.

3 TAL - Thermal effects at accident temperature of 160°F when recirculation is initiated for a large break LOCA consistent with the time of maximum hydrodynamic load.

4 DBE - Design Basis Earthquake.

5 FRHL - Full Recirculation Hydraulic Loads at 14,400 gpm, the bounding value for ECCS flow 6 DL - Debris Load. For structural analysis of main and remote strainers, bounding debris mass values of 1986 lbs and 1530 lbs, respectively, were used.

7 NL(t) - Nozzle Loads. Loads applicable only to the remote strainer and local conditions at the time of the load case.

8 TBL - Thermal Break Load. Thermal effects at post-break containment environment temperature of 236°F.

9 TFL - Thermal Fill Loads During Pool Fill (200°F).

10 PFHL - Pool Fill Hydraulic Loads - reverse flow and waterway loads.

11 TOL - Thermal effects at normal (maximum) operating temperature of 160°F for the main strainer and 120°F for the remote strainer.

12 PP - Pressure Pulse. Short term pressure pulse of 5.0 psid acting outward from within the main strainer and waterway and 2.5 psid acting outward from within the interface between the waterway and the remote strainer.