7 to Updated Final Safety Analysis Report, Chapter 6, Table 6.2-8, Accumulator Inleakage
ML16341B093
Person / Time
Site: Cook  
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16341B093 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

19.1 Table:

6.2-8 Page:

1 of 1 ACCUMULATOR INLEAKAGE TIME PERIOD BETWEEN LEVEL ADJUSTMENTS (BETWEEN LEVEL ALARM) 1, 2 OBSERVED LEAK RATE CC/HR MAXIMUM ANTICIPATED (OBSERVED LEAK RATE) DIVIDED BY (MAX ALLOWED DESIGN) 3 1538 1 month 16 days 77 513 3 months 7 weeks 25.7 256 6 months 13 weeks 12.8 171 9 months 20 weeks 8.6 128 1 year 27 weeks 6.4 1 25.0 cu. ft. between level alarms.

2 Accumulator initially at "Lo" level and pressure conditions.

3 Maximum allowed leak rate for manufacturers acceptance test is 20 cc/hr (Back Leakage through check valves).