IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
22 Table:
6.2-6 Page:
1 of 3 SINGLE ACTIVE FAILURE ANALYSIS EMERGENCY CORE COOLING SYSTEM RECIRCULATION PHASE Component Malfunction Comments A. Accumulator Deliver to broken loop Totally passive system with one accumulator per loop.
Evaluation based on three accumulators delivering to the core and one spilling from ruptured loop.
B.
Pump:
- 1) Centrifugal Charging Fails to start Two provided. Evaluation based on operation of one.
- 2) Safety Injection Fails to start Two provided. Evaluation based on operation of one.
- 3) Residual Heat Removal Fails to start Two provided. Evaluation based on operation of one.
C.
Automatically Operated Valves:
- 1) Boron injection tank isolation a) inlet valve Fails to open Two parallel lines; one valve in either line is required to open.
b) outlet valve Fails to open Two parallel lines; one valve in either line is required to open.
- 2) Centrifugal Charging pumps a) suction line from RWST isolation valve Fails to open Two parallel lines; only one valve in either line is required to open.
b) discharge line to the normal charging path isolation valve1 Fails to close Two valves in series; only one valve required to close.
c) minimum flow line isolation valve Fails to close Two trains in parallel; only one train required.
d) suction from volume control tank isolation valve Fails to close Two valves in series; only one valve required to close.
1 The reactor coolant pump seal water path is left open.
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
22 Table:
6.2-6 Page:
2 of 3 SINGLE ACTIVE FAILURE ANALYSIS EMERGENCY CORE COOLING SYSTEM RECIRCULATION PHASE Component Malfunction Comments Recirculation Phase A. Valves operated From Control Room for Recirculation:
- 1) Containment sump recirculation isolation Fails to open Two lines parallel; only one valve in either line is required to open.
- 2) Residual heat removal pumps suction line from RWST isolation Fails to close Check valve in series with two gate valves; operation of only one valve required.
- 3) Safety injection pumps suction line from RWST Fails to close Check valve in series with gate valve; operation of only one valve required.
- 4) Centrifugal Charging pumps suction line from RWST isolation valve Fails to close Check valve in series with two parallel gate valves.
Operating of either the check valve or the gate valves required.
- 5) Safety injection pump suction line isolation valve at discharge of the west residual heat exchanger Fails to open Separate and independent high head injection path via the centrifugal charging pumps taking suction from discharge of the East residual heat residual head exchanger. A cross over line allows the flow from one heat exchanger to reach both safety injection and charging pumps if necessary.
- 6) Residual Heat Removal discharge bypass line Fails to close The second isolation valve for RWST backflow is still available.
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
22 Table:
6.2-6 Page:
3 of 3 SINGLE ACTIVE FAILURE ANALYSIS EMERGENCY CORE COOLING SYSTEM RECIRCULATION PHASE Component Malfunction Comments B. Pumps:
- 1) Component Cooling Water Pump Fails to start Two provided. Evaluation based on operation of one. One pump is running during normal operation. An additional shared pump is available.
- 2) Essential Service Water Pump Fails to start Four provided for both units. Two pumps are required for normal operation.
- 3) Residual Heat Removal Pump Fails to start Two provided. Evaluation based on operation of one.
- 4) Charging Pump Fails to operate Same as injection phase.
- 5) Safety Injection Pumps Fails to operate Same as injection phase.