ML16341B027
From kanterella
Jump to navigation
Jump to search
ML16341B027 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/24/2016 |
From: | Indiana Michigan Power Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16336A263 | List:
|
References | |
AEP-NRC-2016-42 | |
Download: ML16341B027 (1) | |
Similar Documents at Cook | |
---|---|
Category:Drawing
MONTHYEARML22340A1522022-11-30030 November 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML22340A1342022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22340A1912022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22340A2152022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML22340A1692022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML22340A1942022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Figures ML22340A1442022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML22340A1422022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML22340A1842022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML22340A1382022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Figure ML22340A1872022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML22340A1892022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22340A1292022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21125A4882021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) ML21125A5832021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML21125A5672021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 9, Figures ML21125A5462021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML21125A5792021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) ML21125A5032021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML21125A5182021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Figures ML21125A5352021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML21125A4822021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21125A5252021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) ML21125A5702021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML21125A5432021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML21125A5942021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML21125A5332021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML21125A4562021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML21125A5242021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 10, Figures ML21125A5692021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML21125A5642021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 4, Figures ML21125A4752021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML21125A5092021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 11, Figures ML18220A6192018-08-0808 August 2018 Figure 8.3-4, Amendment 5, Existing Soil Profiles Section D-D, Boring Location Plan, Looking East ML18220A6292018-08-0808 August 2018 Figure 3.2.3-6, Upper Core Support Assembly. ML18220A6282018-08-0808 August 2018 Figure 3.2.3-9, Fuel Assembly Outline. ML18220A6212018-08-0808 August 2018 Figure 8.3-1, Amendment 5, Existing Soil Profiles Section A-A, Boring Location Plan, Looking East ML18220A6222018-08-0808 August 2018 Figure 8.3-2, Amendment 5, Existing Soil Profiles Section B-B, Boring Location Plan, Looking East ML18220A6182018-08-0808 August 2018 Figure 8.3-5, Amendment 5, Existing Soil Profiles, Section E-F, Boring Location Plan, Looking North ML18220A6202018-08-0808 August 2018 Figure 8.3-3, Amendment 5, Existing Soil Profiles Section C-C, Boring Location Plan, Looking East ML18219D3302018-08-0707 August 2018 Figure 4.2-2, Reactor Vessel Schematic. ML18219D3292018-08-0707 August 2018 Figure 3.2.3-5, Lower Core Support Structure. ML16341C6252016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.8-3, Compressed Air System ML16343A0522016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.5-1, Steam Generator Blow-Down System, Unit No. 1 & 2 ML16336A6502016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Grid to Thimble Attachment Joints, Figure 3.2-5A ML16336A6532016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Typical Core Barrel Assembly, Figure 3.2-8 ML16336A6492016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Top Grid to Thimble Attachment, Figure 3.2-5 ML16341B0142016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 5, Figure 5.3.5.1-1, Floor Structure ML16341B5732016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Vital Instrument Bus Distribution System ML16343A0482016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.1-2B, Wds Liquids & Solids, Units No. 1 & 2, Sheet 3 of 3 2022-11-30 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22340A1912022-11-30030 November 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22340A1662022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.5-1 to 14.2.8-1 (Unit 2) ML22340A2032022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems ML22340A2092022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22340A2002022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) ML22340A1932022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Standby Safeguards Analysis (Unit 2) ML22340A2102022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML22340A1972022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Tables ML22340A2072022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) ML22340A1832022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System ML22340A1862022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Tables ML22340A1902022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 13, (Historical) Initial Tests and Operations ML22340A1842022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML22340A1752022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) ML22340A1552022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22340A1822022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 1) ML22340A1892022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22340A2062022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 2) ML22340A1692022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML22340A1732022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) ML22340A1672022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2) ML22340A1612022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 2) ML22340A1742022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML22340A1642022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3.4, Containment Integrity Analysis (Loss of Coolant Accident) (Unit 2) ML22340A1722022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML22340A1282022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML22340A1772022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1-1 to 14.1.13-1 (Unit 1) AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)2022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) ML22340A1922022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Containment System ML22340A1802022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1) ML22340A1962022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML22340A1882022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML22340A1632022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection System ML22340A1562022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1) ML22340A1952022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Tables ML22340A1712022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Tables ML22340A2142022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A, Radiation Sources (Appendix 14A) (Unit 2) ML22340A2122022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3.5 to 14.5.9, Environmental Consequences of a Loss-Of-Coolant Accident (Unit 2) ML22340A1622022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML22340A2152022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML22340A1812022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Tables ML22340A1682022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Table 14.0-1 (Unit 2) ML22340A2052022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Tables ML22340A2042022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 15, Supplement for Renewed Operating Licenses ML22340A2012022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 1) ML22340A1852022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.4-1 to 14.3.4-47 (Unit 2) ML22340A2082022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Revision 19, Environmental Qualifications Analyses (Unit 1) ML22340A1872022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML22340A1942022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Figures ML22340A1982022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control 2022-11-30 |
Text
REVISIONS DESCRIPTION FSAR FIG. 5.3.5.9-1 Typical Ice Condenser Door Frame Section REV. NO. AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO.TITLE LOWER SUPPORT STRUCTURE COLUMN PLANT ELEVATION SECTION REVISED PER 98-UFSAR-115 16.3 SECTION A-A SH 1 of 1 FLOOR EL 641'-8 1/4" SECTION B-B FRAME EL 642'-1" CRANE WALL OPENING EL 642'-5" LOWER SUPPORT STRUCTURE FRAME INSULATION SPACER DOOR SEAL LOOSE FILL INSULATION CRANE WALL OPENING EL 649'-9"
Retrieved from "https://kanterella.com/w/index.php?title=ML16341B027&oldid=842180"