7 to Updated Final Safety Analysis Report, Chapter 5, Table 5.2-3 - Electrical Penetration - Prototype Tests Penetrations. Page 1 of 1
ML16341A847
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16341A847 (1)


Text

IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:

16.6 Table:

5.2-3 Page:

1 of 1 ELECTRICAL PENETRATION - PROTOTYPE TESTS PENETRATIONS1 Test & Sequence 5 Kv Power Penetration 600 Volt Power &

Control Penetration Instrumentation Penetration High Potential2 X

X X

Leakage 2 X

X X

Ampacity X

X Accident Operating Environment X

X X

Short Circuit X

X 1 Prototype testing compliance was allowed to be demonstrated by the submittal of test data from tests conducted on penetrations of equivalent type and design as those furnished for Donald C. Cook nuclear Plant.

2 Conducted after Ampacity, Accident Operating Environment, and Short Circuit Tests.