ML16341A847
| ML16341A847 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16341A847 (1) | |
Text
IINNDDIIAANNAA AANNDD M MIICCHHIIGGAANN PPOOW WEERR DD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTT UUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISS RREEPPOORRTT Revision:
16.6 Table:
5.2-3 Page:
1 of 1 ELECTRICAL PENETRATION - PROTOTYPE TESTS PENETRATIONS1 Test & Sequence 5 Kv Power Penetration 600 Volt Power &
Control Penetration Instrumentation Penetration High Potential2 X
X X
Leakage 2 X
X X
Ampacity X
X Accident Operating Environment X
X X
Short Circuit X
X 1 Prototype testing compliance was allowed to be demonstrated by the submittal of test data from tests conducted on penetrations of equivalent type and design as those furnished for Donald C. Cook nuclear Plant.
2 Conducted after Ampacity, Accident Operating Environment, and Short Circuit Tests.