REGULATO INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBR 8407170556 DOC ~ DATE'o 84/07/1 6 NOTARIZED ~
NO DOCKET FACIL:50 275 Diablo Canyon Nuclear Power Plant~ Unit ii Pac)fic Ga 05000275 50 323 Diablo. Canyon Nuclear Power Planti Unit 2i Pacific Ga 05000323 AUTHeNAME AUTHOR AFFILIATION EBERSOLE~J<C.
ACRS Advisory Committee on Reactor Safeguard ds REC IP, NAME RECIPIENT AFFILIATION PALLADINOiN,J~
Commissioners
SUBJECT:
Submits ACRS review of Peer Review Group draft rept discussed at 291st meeting on 840712 14 'erved on 840617, DISTRIBUTION CODE:
YA01S COPIES RECEIVEDILTR, ENCL SIZEi TITLE:
ACRS Letter s NOTES:J Hanchett icy PDR Documents.
OL:09/22/81 J Hanchett 1cy PDR Documents'5000275 05000323 INT RECIPIENT ID CODE/NAME'RNAL:
EDO IE/DEPER/EPB NRR/CRBRPO DIR NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB NRR/DE/MTEB NRR/DE/SGEB NRR/DHFS/HFEB NRR/DHFS/PSRB NRR/DL/ADL NRR/DL/LB2 NRR/DL/ORAB NRR/DL/ORB2 NRR/DL/ORB4 NRR/DL/SEPB NRR/DL/TAPMG NRR/DSI/ADCCS NRR/DS I/AEB NRR/DSI/CPB NRR/DSI/ICSB NRR/DSI/RAO NRR/DST DIR NRR/DST/ADT NRR/DST/RRAB NRR/DST/SPEB NRR/TMIPO DIR RES DEPY RES FILE-RES/DAE RES/DFO RES/DRA COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
1 1
1 1
1 1
RECIPIENT ID CODE/NAME IE/DEPER DIR IE/DQASIP/QAB NRR/DE/ADPS NRR/DE/CEB NRR/DE/EQB NRR/DE/MEB NRR/DE/SAG NRR/DHFS DEPY NRR/DHFS/LQB NRR/DL DIR NRR/DL/LB1 NRR/DL/LB3 NRR/DL/ORBi NRR/DL/ORB3 NRR/DL/ORB5 NRR/DL/SSPB NRR/DSI DIR NRR/DSI/ADRP NRR/DSI/ASB NRR/DSI/CSB NRR/DS I/METH NRR/DSI/RSB NRR/DST/ADGP NRR/DST/GIB NRR/DST/RSCB NR DEPY G FIL RES/ARCS RES/DET RES/DHSNM a
COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL: LPDR NSIC NOTES:
1 TOTAL NUMBER OF COPIES REQUIRED+
70 ENCL
i~~ y a
h hhh I
~
II y
I pea P
'gw~ "~au P
~4 0
0 Ic n +4*4+
0 r
UNITEDSTATES NUCLEAR REGULATORY COMMISSION ADVISORYCOMMITTEEON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 July 16, 1984 Honorable Nunzio J. Palladino Chairman U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Dr. Palladino:
SUBJECT:
ACRS REVIEW OF THE REPORT OF THE DIABLO CANYON PEER REVIEW GROUP During its 291st
- meeting, July 12-14,
- 1984, the Advisory Committee on Reactor Safeguards completed its review of a draft report (Reference 1) prepared by the Diablo Canyon Peer Review Group as requested by your memorandum dated July 9,
1984.
This matter was considered during a
Subcommittee meeting held in Washington, D.C.
on July ll, 1984.
During our review we had the benefit of discussions with members of the NRC
- Staff, including NRC Inspector, Nr.
Isa Yin, representatives of the Pacific Gas and Electric Company (Licensee),
and representatives of the Independent Design Verification Program (IDVP) organization.
We also heard statements from two members of the public and had the benefit of the documents listed.
The draft report of the Peer Review Group relates to activities under-taken by the Licensee in accordance with the seven conditions imposed by the Commission in the low power license for the Diablo Canyon Nuclear Power Plant, Unit 1.
The report also addresses issues raised regarding the scope and effectiveness of the IDVP and concerns relating to quality.
assurance aspects of the work done by the onsite engineering group.
The Peer Review Group has concluded that the seven license conditions have been addressed satisfactorily by the
- Licensee, that the previous conclusions of the NRC Staff regarding the acceptability of the IDVP remain valid, and that the Programmatic Issues concerning the onsite engineering group have been resolved.
Although Nr. Yin participated to some degree in the reviews made by the Peer Review Group, he has concerIIs about the extent of the reviews and the judgmental basis for some of its findings.
We believe that Nr.
Yin's concerns represent a
difference in professional engineering judgment.
We believe that the Peer Review I'roup's review of the Licensee's activities was adequate for the purpose.-
ppg gr>op~ odvKAIE~ ~g gg (P
'.]o7t pp(
t 0
CaI) 4 h.
Honorable Nunzio J. Palladino July 16, 1984 4e agree with the conclusions reached by the Peer Review Group that the issues discussed in the draft report have been resolved and should not prevent operation of the Diablo Canyon Nuclear Power Plant, Unit 1 at full power.
Sincerely, Jesse C. Ebersole Chairman
References:
1.
Memorandum from Richard H. Vollmer,. NRR, to R.
F. Fraley, ACRS, dated July 6, 1984,
Subject:
Diablo Canyon License Conditions on Piping ana Supports 2.
Memorandum from Nunzio J. Palladino, NRC Chairman, to Jesse C.
- Ebersole, ACRS Chairman, dated July 9, 1984,
Subject:
Review of Diablo Canyon Issues 3.
Memorandum from I. T. Yin, Region III, to Richard H. Vollmer, NRR,
- undated,
Subject:
Comments on SSER License Condition 2.C (ll)
Prepared by the Diablo Canyon Piping Peer Review Panel
- 4. Draft Memorandum from I. T. Yin, Region III, to Richard H. Vollmer, NRR, undatea,
Subject:
Comments on SSER License Condition 2.C (11)
Prepared by the. Diablo Canyon Piping Peer Review Panel
- 5. Letter from Thomas
- Devine, Counsel, Mothers for Peace, Government Accountabi.lity Project, to Nunzio J. Palladino, et al., dated July 11, 1984,
Subject:
Diablo Canyon Nuclear Power Plant
E
~.s,