Report Nos. 50-275/83-34
and 50-323/83-24
Docket Nos. 50-275
and 50-323
License
No. DPR-76
Construction Permit No.
CPPR-69
Licensee:
Pacific Gas
and Electric
Co
an
77 Beale Street
Room 1435
San Francisco
California 94106
Facility Name:
Diablo Can on Units
1 and 2
Inspection at:
Diablo Can on Site
San Luis Obis
o Count
. Inspected
conducted:
October
11-14
1983
Inspectors:~ G.
H. Hernandez,
Reactor Inspector
~
Date Signed
Approved by:
D. F. Kirsch, Chief
Reactor Projects
Section
No'.
3
ate Signed
~Summa
Ins ection Durin
the Period of October
11-14
1983
(NRC Ins ection
Re ort
Nos. 50-275/83-34
and 50-323 83"24
Areas Ins ected:
A special,
unannounced
inspection by a regional-based
inspector to examine licensee
and contractor actions in response
to an audit
conducted
by Nuclear Services
Corporation in August-September
1977 of Pullman
Power Products
construction activities.
A copy of this audit was included in
documents
provided
on September
9, 1983, to the Atomic and Safety licensing
Appeals Board by the "Joint Intervenors" to supplement their motion for
re-opening the record
on Construction Quality Assurance
(CQA).
The inspection involved 22 inspection-hours
by one
NRC inspector.
Results:
No items of noncompliance
or deviations
were identified.
SBl~MT~ 831028
ADOCK 05000275
G
T
DETAILS
l.
Individuals Contacted
a.
Pacific Gas
and Electric
Com an
(PGSZ)
- R. D. Etzler, Field Construction
Manager
D. A. Rockwell, Project Field Engineer
- W., K. Glenn, Quality Control Supervisor
- C. M. Seward,
Acting Quality Assurance
Supervisor
M. E. Leppke, Mechanical Engineer
- C. L. Eldridge, Operations Quality Control Supervisor
D. B. Miklush, Maintenance
Manager
- J. Arnold, Resident Mechanical Engineer
b.
Pullman Power Products
Co
oration
(PPP)
- H. W. Karner, Quality Assurance/Quality
Control Manager
- Denotes attendees
at the
NRC exit management
meeting
on October
14,
1983.
In addition, Mr. M. Eli (LLNL) and Mr. C. Morton (EGSG),
NRC
consultants,
attended
the exit management
meeting.
2.
~Back racad
On September
9,,1983,
the Joint Intervenors filed with the Atomic Safety
and Licensing Appeals
Board
a document to supplement their pending motion
to re-open the record
on the issue of Construction Quality Assurance
(CQA).
The documents
included (1)
a proposal for an independent
audit of
Pullman Power Products
(PPP)
by Nuclear Services
Corporation
(NSC) and,
(2) the results of a previous Nuclear Services
Corporation audit.
The
NSC audit was conducted
from August 22 - September
20,
1977,
and covered
Pullman's construction activities from 1971 through September
1977.
3.
Re ion V Actions
The Joint Intervenors'otion
and
PGSZ's
response
to the Joint
Intervenors
Supplement
to Motion To Reopen
The Record
On Construction
Quality Assurance
was reviewed by the
NRC Region
V staff,
and
a staff
response
provided to the
ASLAB on this subject
on October 4,
1983.
Based
on the review of the aforementioned
documents,
discussions
with licensee
personnel
and
a review of NRC Region IV and Region
V Inspection Reports
during the referenced
period,
(1971 through Sept>>mber
1977) the staff
concluded that the Pullman Quality Assurance
Program did not suffer a
major breakdown
and for those instances
where isolated
breakdowns
did
occur, those problems
were identified, addressed,
and resolved
by the
licensee's
Quality Assurance
Program or the
NRC inspection program in
effect at the time.
a
~
~
The staff did not attempt to reconcile each
and every
NSC audit finding.
Rather,
the staff verified that the licensee
made every effort to
throughly address,
investigate,
and resolve
each concern identified in
the
NSC audit.
However,
a review of the licensee's
response
indicated
that three areas
required further clarification to assure
that the
licensee's
response
to the
NSC audit findings complied with regulatory
and code requirements.
These
areas
of concern are discussed
below in
paragraph
4 of this report.
4.
Ins ection Results
During this inspection the inspector
met with licensee
personnel
who
participated in the April - June
1978 licensee
followup audit of Pullman
Power Products.
This audit was conducted
as
a direct result of the
audit findings and was performed to assure
that Pullman's Quality
Assurance
Program
and physical work complied with regulatory
and
'contractual
requirements
in effect during the time the work was
performed.
The results of the licensee's
and Pullman's
response
to the
NSC audit findings were reviewed with the above referenced
individuals.
The review/discussions
reaffirmed the earlier staff conclusion that the
NSC audit findings had been properly addressed,
and every affort had been
made by the licensee
to throughly address
and resolve the
NSC audit
findings.
The three areas
of concern were resolved
as follows:
a 0
Criterion III, "Measuring and Test Equipment" finding No.
2 to the
NSC audit states
that,
"The calibration program did not require
recalibration of themocouples until June
16,
1976.
Therefore,
there
is no assurance
of the accuracy of thermocouples
used for pre- and
post-welding heat treatment prior to June
16,
1976.
Newly purchased
thermocouples
were required to be calibrated by the manufacturer.
However, the manufacturer's
calibration does not assure
that the
thermocouples
have not been
damage
during handling and shipping."
The Pullman response
states,
in part, that, "All thermocouples
have
been
and are purchased
with calibration.
Prior to June,
1976, there
were no requirements
of recalibration to thermocouples.
When the
program
was initiated, all existing thermocouples
were recalibrated
and none were found to be out of calibration."
The inspector
reviewed thermocouple
record packages
and confirmed
that the documentation
supported
the licensee
response
that
thermocouples
were purchased
with calibration requirements,
and that
when all existing theomocouples
were re-calibrated
on June
15,
1976
and July 10,
1976 and that all were found within calibration
requirements.
The inspector
has
no further questions
on this subject.
b.
Criterion IX, "Special Processes"
item 10.o (2) of the
NSC audit
finding states
that,
"Tempil sticks were not used."
The Pullman response
states
that, "In cases
where welders
were noted
without Tempil Sticks in Internal Audit Findings, there
was
no
indication on the "Welders Audit Sheet" that the interpass
temperature
was too high. It is, therefore,
concluded
that, weld
quality was not affected;
Ferrite checks of welds where tempil
sticks were not used
show acceptable
results."
This
NSC audit finding may have been based
on findings. of previously
conducted
Pullman audits.
The inspector interprets
the
NSC audit
finding as implying that Tempil sticks were not used at all by
Pullman welders.
The Pullman response
makes it clear that only for
those
cases identified by the Pullman auditor was there
a question
as to whether the welders audited were using Tempil sticks.
The
inspector
found that Tempil sticks were used by Pullman welders
as
a
matter practice during the period.
The inspector
has
no further questions
on this subject.
C ~
Criterion IX, "Special Processes",
finding 10g of the
NSC audit
states
that,
"Welder BF
(W. Adair, 251) performed welding on FW-70,
72, 73, 76, 77,
78,
100B,
132;
and
133 in isometric package
21-7 and
FW-88, 90,
92,
134,
135,
and
160B in isometric package
21-8.
This
welder was not qualified for the thickness
range;
and 'the welds were
reported
on DR's
25367 2538'539'nd
2899.
In accordance
with
Pacific Gas
6 Electric Company disposition,
some of the welds were
radiographed
and found acceptable;
welder
BF was qualified to the
thickness
range;
and all the welds in question were accepted.
This
disposition is not permitted by B31.1, B31.7,
and
which all specify that the welder must be qualified prior to making
production welds."
The Pullman response
states:
The deviation cited was found by Pullman Quality Assurance
and reported to
PGGE on appropriate deviation records.
Reference
to DR-2536 is incorrect.
The auditor is completely incorrect in indicating that
ASIDE
Section IX, B31.1 and B31.7
do not permit welding prior to
qualification.
No such prohibitions exist.
DR-2538 Revision
1 and DR-2539, Revision
1 dated July,
1975
report 2-2" butt welds in Diesel Fuel Oil (160B and
100B) made
12/17/73.
Welder was not qualified for small diameter
(3"- and
under) unitl 2/28/74.
Both DR's use the option to qualify the welder by radiography
(see
1971 Section IX Winter 71 Addendum - Paragraph
Q2(a)).
Both production welds
(160B and
100B) were radiographed
and
found acceptable.
PG&E accepted qualification on this basis.
P
C
~
4
DR-2899 dated August,
19'75 reported
14 butt welds
made prior to
2/18/74.
Investigation
shows these
were
2 1/2" pipe size.
Prior qualification by DR-2538 Revision
1 and DR-2539 Revision
1 covers qualification of these
seams.
No further NDE
required..."
The inspector questioned
the response
to the finding because
the
code
does not allow a welder to perform production welding prior to
qualification to the particular process.
The inspector
considered
that to adequately
resolve this finding the licensee
should have
radiographed
the other fourteen welds in question.
Investigation
into this item determined that during the
1978
HOSGRI modifications
the diesel oil fuel piping was re-routed.
During the re-routing
process,
the two piping runs containing fifteen of the sixteen welds
in question
were eliminated.
The'only currently installed weld
(Weld No.
160B)
was
one of the two welds originally radiographed
by
the licensee
to justify the acceptance
of the other fourteen welds.
The radiographs
for weld 160B were reviewed
and found acceptable.
Additionally, the inspector noted that the original NSC audit
finding came
from a Pullman internal audit that originally
identified the discrepancy.
Therefore, it is apparent that the
Pullman Quality Assurance
Program
was in effect and was actively
identifying problems in Pullman's welding program.
The inspector
has
no further'uestions
on this subject.
5.
Mana ement Meetin
On October
14,
1983, the inspector
met with licensee
representatives
denoted in paragraph
1.
The inspection
scope,
observations,
and findings
were discussed.
~ vV'~Q ~
C
f
'I
II~
S
gPN 10 I84
DISTR I B
ION
Document Control (50-275)
PRC System
JLee (2)
DOCKET NO(S).
50-275
The Honorable Alan Simpson,
Chairman
Subcommittee
on Nuclear Regulation
Committee on Environment and Public Works
United States
Senate
llashington,
D.C.
205l5
. SUBJECT:
PACIFIC GAS ft ELECTRIC COMPANY - DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1
, dated
The following documents concerning our review of the subject facilityare transmitted for your information:
Notice of Receipt of Application.
DraftiFinal Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Kj Safety Evaluation Report, or Supplement
No. 2O
81 2l, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to ApplicationiSAR dated
Construction Permit No. CPPR-
, Amendment No.
Facility, Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
Other (Specify)
, dated
Enclosures:
As stated
cc: Senator
Gary Hart
bcc:
Office of Nuclear Reactor Regulation
OFFICEtI
SURNAME/
DATEP
L 'j/I3,
- ft
~ ~ ~
~ ~ 0
~
P ~ ~
~ ~
/84
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~ ~ ~
~ ~
~
NRC FORM 318 (I0/80) NRCM 0240
OFFICIAL RECORD COPY
n
'
-/
t
P
5
I
P
STRI BUT ION
Uocument Control
(50-275)
PRC System
JLee
(2)
DOCKET NO(S).
50<<275
The Honorable Norris K. Udall, Chairman
Subcommittee
on Energy and the Environment
Committee
on Interior and insular Affairs
United States
House of Representatives
D.C.
20515
PACIFIC GAS
8t ELECTRIC COhIPANY - DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1
The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
H Safety Evaluation Report, or Supplement No
20 5 21
dated
December
1983
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
,dated
Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
Other (Specify)
, dated
Enclosures:
As stated
Representative
Nanuel
Lujan
bcc:
Office of Nuclear Reactor Regulation
oFFIcE Ih
SURNAMEt/
DATEP
~ ~ ~
~ ~ 0
1
B¹3
- ft
/84
NRC FORM 318 u0/80) NRCM 0240
OFFICIAL RECORD COPY
.0
r
r
RIBUTION
Document Control
(50-275)
PRC System
JLee (2)
Jgg 10 1984
DOCKET NO(S).
The Honorable Richard Ottinger, Chairman
Subcommittee
on Energy Conservation
add Power
Committee on Energy and Coltnierce
United States
House of Representatives
D.C.
20515
PACIFIC GAS 5 ELECTRIC COMPANY - DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1
, Amendment No
The following documents concerning our review of the subject facilityare transmitted for your
information.'otice
of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Safety Evaluation Report, or Supplement
No.
2O
8I 21, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operating License No.
, dated
Order Extending Construction Completion Date, dated
Other (Specify)
Enclosures:
As stated
cc:
Representative
Carlos Moorhead
Office of Nuclear Reactor Regulation
bcc:
OFFICE/
SURNAME/
DATEP
'A3
~
~
~ ~
~
~:ft
./
/84
NRC FORM 318 (10/80) NRCM 0240
OFFICIAL RECORD COPY
0
I
$i/~~
~ mM
"'STRIBUTION
.ument Control
(50-275)
PRC System
JLee (2)
DEC 2 2 583
DOCKET NOlS).
50-275
The Honorable Richard Ottinger,
Chairman
Submommittee
on Energy Conservation
and
Power
Committee on Energy and
Commerce
United States
House of Representatives
llashington.
D.C.
20515
PACIFIC GAS
81 ELECTRIC COMPANY - DIABLO CANYON NUCLEAR POllER PLANT, UNIT 1
The following documents concerning our review of the subject facilityare transmitted for your
information.'otice
of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Xl Safety Evaluation Report, or Supplement
No. 19, dated
October 1983
Notice of Hearing on Application for Construction Permit..
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
Other (Specify)
, dated
Enclosures:
As stated
cc:
Representative
Car1os floorhead
bcc:
Office of Nuclear Reactor Regulation
OFF1CEP
SURNAME/
DATEP
¹3:ff-
~ ~ ~ ~
~
~
~ ~
.j Ze.8.3
NRC FORM 318 u 0/80) NRCM 0240
OFFICIAL RECORD COPY
I
I I ~ '
I ~
I
I
'
I
d
I
~
'
I
- d
d
I
d
d
d ddd)
~
~
~
~
~
I
d ~
DISTRIBUTION
Document Control
(50-275)
PRC System
J Lee'(2)
J3EC 2 2 t9N
DOCKET NO(S).
5O 275
The Honorable Alan Simpson.
Chairman
Subcommittee
on Nuclear Regulation
Committee on Environment and Public Mork~;)
United States
Senate
D.C.
20515
SUBJECT:
PACIFIC GAS 5 ELECTRIC CIIPANY - DIABLO CANYON NUCLEAR P01lER PLANT, UNIT l
The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Z Safety Evaluation Report, or Supplement
No. lg, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
Other (Specffy)
, dated
Enclosures:
As stated
Office of Nuclear Reactor Regulation
Senator
Gary Hart
bcc:
oFFIOEIh
SURNAME/
DATEP
¹3
~ ~ ~
~
~
~ft
ys3
~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 3I8 (10/80) NROh1 0240
OFFICIAL RECORD COPY
V
I
DEt', 3 2 $83
V
DISTRIBUTION
Document Control (50-275).
PRC System
JLee (2)
DOCKET NO(S). gP 275
The Honorabl'e Bort is K. Udall, Chairman
Subcommittee
on Energy and the Environment
Committee
on Interior and Insular Affairs
United States
House of Representatives
'I
llashington,
D. C.
20515
SUBJECT:
PACIFIC GAS 5 ELECTRIC COMPANY - DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1
.. The following documents concerning our review of the subject facilityare transmitted for your
information.'otice
of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
X Safety Evaluation Report, or Supplement
No. "g, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated
Other (Specify)
, dated
Enclosures:
As stated
Representative
Hanuel Iujan
bcc:
Office of Nuclear Reactor Regulation
OFFICE/
SURNAME/
DATEP
83
f.t..
Jg
S3
NRC FORM 318 (10/80) NRCM 0240
~ ~
~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~
OFFICIAL RECORD COPY
I
I,
r
11,
December 1, 1983
DOCKET NO(S).
The Honorable Ri.chard Ot;tiger, Chairman
Subcommittee
on Energy Conservation
and, Parer
Cmmd.ttee
on Energy and, Caamerce
United States
House of Representatives
D.Ci
20515
SUBJECT:
PACIFIC GAS
Ea EIZGTRIC CQ4PAHY - DIABLO CAHYON NUCLEAR PSHAW.HANT'NIT 1
The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Safety Evaluation Report, or Supplement
No.
, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No. 'o Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operating License No. ~76, Amendment No. 7, dated
Order Extending Construction Completion Date, dated
Other (Specify)
Office of Nuclear Reactor Regulation
Enclosures:
As stated
cc: representative
Carlos Hoorhead
bcc:
OFFICE fF
SURNAME/
DATEP
~ ~ ~ ~
83...
I ~
~ ~ ~ ~
~
~ ~
~ ~ ~
~ ~ ~ ~ ~
~ ~
~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
NRO FOAM 318 (10/80) NRCM 0240
OFFlCIAL RECORD COPY
0
Il
ik
December l~ l983
DOCKET NO(S).
The Honorable Norris K Udall, Chaimnan
Subcommittee
on Energy and the Environment
Camittee
on Interior an6 Xnsu.'Lar Affairs
United. States
House of Representatives
Nashingtonq
D+Go
205l5
SUBJECT:
PACXFIC GAS 4 EIZGTRIG CCMPANY
DIABLO CAHYGN NUCLZAR PQ'KR PXAHT8 UNIT 1
The following documents concerning our review of the subject facilityare transmitted for your
information.'otice
of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Safety Evaluation Report, or Supplement
No.
, dated
0 Notice of Hearing on Application for Construction Permit.
1
Notice of Consideration of Issuance of Facility Operating License.
f
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
,dated
IX ,;, ,,.~6, *
Order Extending Construction Completion Date, dated
Other (Specify)
Office of Nuclear Reactor Regulation
Enclosures:
As stated
cc:
Representative
Manuel Xi/an
bcc:
OGA
oFFIcEIh
SI/RNAME/
DATEP
0 ~ ~
~ ~
../,. 3...
NRC FORM 318 (10/80) NRCh1 0240
OFFICIAL RECORD COPY
C
~
~
e
December 1, 1983
DOCKET NO(S). 50-275
T11e Honorable Alan Simpson,
Chairman
Subcanmittee
on Nuclear RegQation
Canmittee
on Environment and Phb1ic >forks
"
United States
Senate
Vashiagton0
D,Cra
20515
SUBJECT:
PACIFIC GAS 5 ELECTRIC CQIPANY- DIABM CANYON NUCLEAR PQfER PLANT0 UNIT 1
The following documents concerning our review of the subject facilityare transmitted for your information.
Notice of Receipt of Application.
Draft/Final Environmental Statement, dated
Notice of Availabilityof Draft/Final Environmental Statement, dated
Safety Evaluation Report, or Supplement
No.
, dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration of Issuance of Facility Operating License.
Application and Safety Analysis Report, Volume
Amendment No.
to Application/SAR dated
Construction Permit No. CPPR-
, Amendment No.
, dated
Facility Operattng Ltcenee No.
ytFgr7dr, Amendment No.~, dated
Order Extending Construction Completion Date, dated
Other (Specify)
Office of Nuclear Reactor Regulation
Enclosures:
As stated
cc:
Senator Gary Hart
bcc:
OFFtCEP
SURNAME)
DATEty
~ ~
~ ~
~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FOAM St 8 (t0/80) NRCM 0240
OFFICIAL R ECOR D COPY
t