Responds to 820712 & s Re Safety & Redundancy of Valve Failure Modes.Ie Insp Repts 50-275/82-26, 50-323/82-13 & 50-275/82-42 Encl.Further Investigation Revealed Tracking & Documentation of Repts Out of Date
ML16340D916
Person / Time
Site: Diablo Canyon  
Issue date: 10/17/1983
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cooper J
AFFILIATION NOT ASSIGNED
References
NUDOCS 8310200175
Download: ML16340D916 (4)


See also: IR 05000275/1982026

Text

Mr. John H. Cooper

2191 Lariat Drive

Los Osos, California

93402

OCT g ptgg~

HQ yZZEg0P

Dear Mr. Cooper:

The purpose of this l'etter is (1) to respond to the concerns

and problems

which you identified to Mr. E. Powers of the Office of Investigations of the

NRC on July 12,

1982 and (2) to answer your letter of August 20, 1983.

Before proceeding,

please

allow me to apologize for the tardiness

of this

letter and our delays in communicating with you,

The delays are

due to the

fact that two of our offices (Office of Investigations

and Region V) were

involved in following up your concerns

and personnel

involved thought each

others office was contacting you.

Because of this problem,

we have

instituted procedures

to eliminate this sort of situation from occurring

again.

Regarding the issues

you raised, I am enclosing

copies 'of two Region V

Inspection Reports,

Nos. 50-275/82-26,

50-323/50-13

and 50-275/82-42.

Mr. J.

Burdoin,

a Construction Inspector of my staff, followed up your concerns

and

documented this effort in the first report.

Subsequently

we assigned

Hr. P.

Morrill, an Operations

Inspector of my staff, to review that inspection

effort as well as the transcript of your conversations

with Mr. Powers

on

July 12,

1982.

Mr. Morrill concluded that additional examinations

were

appropriate

and followed-up (as

documented in the second inspection report).

Mr. Morrill discussed

several of your concerns with NRC licensing personnel

in Washington,

D.C. to verify that valve failure modes

and redundancy

were

safe at Diablo Canyon.

Although he did not find any major safety problems,

Mr. Morrill did find that

the licensee's

tracking and documentation of Nuclear Plant .Problem Reports

and Design Change

Requests

was out of date

and not always scheduled.

During

other examinations

these

issues

were examined

more thoroughly and corrected

by the licensee.

My staff is aware of these

problems

and has been told to

remain alert for any "back-sliding".

All in all, my staff and I feel your

concerns

were well thought out and

show

a real dedication to safety.

8310200i75.83iOi7

>> 'DR ADOCK 05000275.

H,

.;,

PDR

V

h

P

i

h r,r'ttP"

"

IVX

)

hr

V (P 1

If,t

~

If

r

I

'll

U

h

PI

h

~ I

l

ttt

it ~

~

h 'I

h

'I

tl

h-

h

hr

hrh

Ah

h

~

Vh

I Ih,h

P

V

f

h

A

hlh "

P

L

('

a,

h

t

h

h

hh

Mr. John H. Cooper

"2"

OCT>>

l983

Even if individual concerns

may not be found to be safety problems,

by

following up the concerns

we often find other problems or issues

which need

to be r'esolved or corrected.

In this way individual concerns

(or

allegations)

become

a valuable part of our inspection program.

Me greatly

appreciate

your time and patience in this matter.

Thank you again for your

assistance.

Orlgr'net signed by

T. Young

.

T.

M. Bishop, Director

Resident,

Reactor Projects

and

Engineering Programs,

Region V

Enclosures:

As stated

cc w/o enclosures:

J. Burdoin,

RV

P. Morrill, RV

G. Powers,

OI, RV

bcc:

RSB/Document

Conrol Desk (RIDS)

Distributed by RV:

State of CA

Resident Inspector

Mr. Martin, RV

docket file copy

pink/green copies

RV

MORRILL/dot

10 i /83

BISHOP ~g

Xo//3/83

0

ll

M

I

I'V,

'

II

N

5

'J p

1

1E