+My C
'I UNITED STATES LEAR REGULATORY COMVilSSI WASHINGTON, D. C. 20555 SEP 2'II 1983, gUIALITY ASSURANCE CASE STUDY k'ORKIHG PAPER CASE C
REVISEO DRAFT WORKING PAPER - DATED SEPTEMBER 19, 1983 Attached is a copy o the above document.
It is a revision of Case Study C Draft Working Papers dated July 19, 1983.
This revision was prepared by an HRC contractor and r = Iects input and comments on the earlier dra t by members of the Case S.udy C Team, which is comprised of NRC and contractor staff members.
This documen-; ras rot been subjected to the HRC staf review process, and it does not reflect licensee comments on the July 19 draft.
Ho further revision of this work-;rg paper is planned, and this document should no longer be considered a
draft. This document, along with other relevant irformation will be used as inpu. to a consolidated report 'on the case studies, which will be subjected to the full IHRC staff review process.
M.
D. 'Altman Case Study Team Leader 8310i805i7 831014 1