ML16340D909

From kanterella
Jump to navigation Jump to search
Forwards Revised Draft of QA Case Study Working Paper - Case C
ML16340D909
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 09/27/1983
From: Altman W
NRC
To:
NRC
Shared Package
ML16340D758 List:
References
NUDOCS 8310180517
Download: ML16340D909 (2)


Text

<ia tta0~

(p C

J~

n

+rj I

+My C

'I UNITED STATES LEAR REGULATORY COMVilSSI WASHINGTON, D. C. 20555 SEP 2'II 1983, gUIALITY ASSURANCE CASE STUDY k'ORKIHG PAPER CASE C

REVISEO DRAFT WORKING PAPER - DATED SEPTEMBER 19, 1983 Attached is a copy o the above document.

It is a revision of Case Study C Draft Working Papers dated July 19, 1983.

This revision was prepared by an HRC contractor and r = Iects input and comments on the earlier dra t by members of the Case S.udy C Team, which is comprised of NRC and contractor staff members.

This documen-; ras rot been subjected to the HRC staf review process, and it does not reflect licensee comments on the July 19 draft.

Ho further revision of this work-;rg paper is planned, and this document should no longer be considered a

draft. This document, along with other relevant irformation will be used as inpu. to a consolidated report 'on the case studies, which will be subjected to the full IHRC staff review process.

M.

D. 'Altman Case Study Team Leader 8310i805i7 831014 1

I I

PDR ADQCK 05000275 P

PDR

r