ML16340D907

From kanterella
Jump to navigation Jump to search
Informs That Working Papers for Three QA Case Studies Complete,Per 830923 Memo.Case C Re Diablo Canyon, , Is Rev to 830719 Draft Transmitted in Board Notification 83-135 on 830902.Papers & Transmittal Ltrs Forwarded
ML16340D907
Person / Time
Site: Diablo Canyon, Vogtle, 05000000, Marble Hill
Issue date: 09/28/1983
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML16340D758 List:
References
NUDOCS 8310180505
Download: ML16340D907 (4)


Text

O

= VA~

~

PIPi UNITED STATES NUCLEAR REGULATORY COMMISSION t

vASRlt4GTOt:, o. C. 20555 Sro 2 S i%3 H=I iQPJ )IDUN FOP,:

I Darrell C. Eisenhvt, Director Division of Licensing, hRR rROH:

James N. Taylor, Director Division of Quality Assurance, Safeguards, and Inspection

Programs, IE

SUBJECT:

QA DRA,"T REPORTS In respo..se to your memorandum dated September 23,

1983, we have completed the working papers for three QA Case Studies.

L ~

~

'he studies for which working papers are consi4ered complete are for the Marble Hiill, Vogtle, and Diablo Canyon projects.

The studies are completed in the s nse that no further revisions are planned, and the s vd1es 1n this curr nt form as w ll as other relevant informa..1on will be used as inpvt in developing a composite report to Congress on the case study activities.

In this regard, the working papers should no longer be considered "dra t" working papers.

Enctosed are copies of the completed working papers for the three projects.

. Please note that the Case C working paper is dated September 19,

1983, and is a case study team revision of the earlier draf+ dated July '9,.

8"-, which you transmitted in a board notification dated September 2, 1983.

Enclosed also are copies of three letters dated Auovst 2, 1983 transmi tino the working papers to the respective licensees.

The working papers or Cases A and B are identical to the working papers transmitted in the August 2 letters.

The only difference is the cover statement by the team leader that the working papers are no longer considered draft.

Copies of each oi. these three case study working papers are being placed in the Public Document Room.

c A.

ylor, Director Di ision Quality Assurance, Safeguards, and Inspection Programs 0 fice of Inspection and Enforcem nt En"iosures:

Se Page 2

3'>5' pip 83iOi80505 8310i4 PDR *DOCK 05000275 P

PDR

I

Darrell G. Eisenhut Encl osures:

1.

Letter to Public Service

Indiana, dated 8/2/83 2.

Letter to Georgia Power

Company, dated 8/2/83 3.

Letter to Pacific Gas and Electric, dated 8/2/83 4.

Case Study A Working Paper 5.

Case Study B Working Paper 6.

Case Study C Working Paper, dated 9/19/83

I