ML16340D759

From kanterella
Jump to navigation Jump to search
Board Notification 83-156:forwards Rl Cloud Assoc & Teledyne Engineering Svcs Repts Re Idvp
ML16340D759
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/14/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Gilinsky V, Palladino N, Roberts T
NRC COMMISSION (OCM)
References
TASK-AS, TASK-BN83-156 BN-83-156, ISSUANCES-OL, NUDOCS 8308300781
Download: ML16340D759 (8)


Text

Docket No.:

50-275 GCTSc )ggg MEMORANDUM FOR:

FROM'UBJECT:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation INFORMATION ITEMS REGARDING THE DIABLO CANYON NUCLEAR PO>lER PLANT (Board Notification No.83-156)

In accordance with NRC procedures for Board Notification, the following information is being transmitted directly to the, Commission:

1.

R. L. Cloud Associates, Inc.,

ITR 54 Rev.

1, Containment Building - IDVP Verification of Corrective Action, letter dated October 4, 1983 2.

R. L. Cloud Associates, Inc.,

ITR 55 Rev.

1, Auxiliary Building - IDVP Verification of Corrective Action, letter dated October 1, 1983 3.

R. L. Cloud Associates, Inc., ITR-58 Rev.

1, Intake Structure-Verification of DCP Activities, letter dated October 1,

1983 4.

R. L. Cloud Associates, Inc.,

ITR 60 Rev.

1, Small Bore Piping - IDVP Verification of Corrective Action, letter dated October 4, 1983 5.

R. L. Cloud Associates, Inc.,

ITR 61 Rev.

1, Small Bore Piping - IDVP Verification of Corrective Action, letter dated October 2, 1983 Contant:

H. Schierling, ONRR x27100 880830D781

Eh ll

'1 h

g

~ II 6

4 ~

fl 6

6 Il fl I

1 II ~

1

The Commissioners 6.

R. L. Cloud Associates, Inc.,

ITR 63 Rev.

1, HVAC Ducts, Electrical

Raceways, Instrument Tubing and Associated Supports -

IDVP Verification of Corrective Action, letter dated October 2, 1983 7.

R. L. Cloud Associates, Inc.,

ITR 65 Rev.

1, Rupture Restraints - IDVP Verification of DCP Activities, letter dated October ll, 1983 8.

R. L. Cloud Associates, Inc.,

ITR 68 Rev.

1, Verification of HLA Soils Work, letter dated October 5, 1983 9.

Teledyne Engineering Services, "IDVP Final Report 10th Submittal," letter dated October 10, 1983, including item 10 below.

10.

Teledyne Engineering Services, "IDVP Executive Summary", letter from W. E. Cooper to G. A. Maneatis (PGSE) and H.

R. Denton (NRC) dated October 10, 1983 (transmitted with item 9 above).

The staff will consider this information in its final evaluation of the verification of matters and modifications in the plant which are required and remain to be completed for the license activities to be authorized.

By copy of this memorandum, we are also informing the Atomic Safety and Licensing Board and the Atomic Safety and Licensing Appeal Board.

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation

Enclosures:

As stated cc:

J.

F. Wolf, ASLB G. 0. Bright, ASLB J. Kline, ASLB T. S. Moore, ASLB W. R. Johnson, ASLAB J.

H. Buck, ASLAB SECY OGC OPE EDO Parties to the Proceeding

  • See previous concurrence.

DL:LB¹3 DL:LB¹3*

DL:LB¹3*

HSchierling/yt JLee GWKnighton 10/

/83 10/

/83 10/

/83 DL+'L:AD/L DL:DIR SBlack TMNovak DGEisenhut 10/

/83 10/

/83 10/

/83

'E' 4

4 tilt 44 4

FIE,'

~'he Commissioner s 6.

7.

8.

9.

R. L. Cloud Associates, Inc.,

ITR 63 Rev. 1, HVAC Ducts, Electrical

Raceways, Instrument Tubing and Associated Supports - IDVP Verification of Corrective Action, letter dated October 2,

1983 R. L. Clb d Associates, Inc.,

ITR 65 Rev.

1, Rupture Restraints - IDVP Verificati of DCP Activities, letter dated October ll, 1983 R. L. Cloud A

ociates, Inc.,

ITR 68 Rev.

1, Verification of HLA Soils Work, letter dated October 5, 1983 Teledyne Engineeri

Services, "IDVP Final Report 10th Submittal," letter dated October 10, 19 3, including letter from W. E. Cooper to G. A. Maneatis (PGSE and H.

R Denton (NRC) transmitting IDVP Executive

Summary, dated October 10, 1983 The staff will consider this formation in its final evaluation of the verification of matters and mo fications in the plant which are required and remain to be completed for t e license activities to be authorized.

By copy of this memorandum, we are a so informing the Atomic Safety and Lic

~ng Board and the Atomic Safety and Li ensing Appeal Board.

Da ell

. Eisenhut, Director Divi 'on of Licensing 0

ice f Nuclear Reactor Regulation

Enclosures:

As stated cc:

J.

F. Wolf, ASLB G. 0. Bright, ASL J. Kline, ASLB T. S.'Moore, LB W. R. Johns ASLAB J.

H. Buck ASLAB SECY OGC OPE EDO Pa ies to the Proceeding DL:LB83 Pt, B03 DL 3

D~

DL: /

IR HSchjer

/yt 0

G 1qhton SBlaK TM o ak 10/(4f8 10 83 10/P /83 10//P/83 '0 83

($

83

a ehh lh,

0 DISTRIBUTION LIST FOR BOARD NOTIFICATION Diabl o Canyon Units 182 Docket Hos. 50-275/323 OL Ns.

Elizabeth Apfelberg

-Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Mr. Herbert H. Brown Dr. John H. Buck

-Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

'rs.

Raye Fleming Arthur C.-Gehr, Esq.

Mr. Nark Gottlieb Mr. Thomas H. Harris Mr. Richard B. Hubbard Dr.

W. Reed Johnson Janice E. Kerr, Esq.

Dr. Jerry Kline Mr. John Marrs Thomas S.

Moore, Esq.

Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Mr. Gordon Silver Michael J. Strumwasser, Esq.

Paul C. Yalentine, Esq.

Harry M. Willis John F. Wolf, Esq Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Mr.. Halcolm H. Furbush Resident Inspector/Diablo Canyon NPS Dr. William E.

Cooper Mr.

W.

C. Gangloff Nr.

Owen H. Davis Dr. Jose Roesset ACRS Members Dr. Robert C. 'Axtmann Mr. Myer Bender Dr.

Max W. Carbon Nr. Jesse C. Ebersole Mr. Harold Etherington Dr.

Wi 1 1 i am Kerr-Dr. Harold W. Lewis Dr. J.

Carson Mark Mr. William M. Mathis Dr. Dade W. Noeller Dr. David Okrent Dr. Milton S. Plesset Nr. Jeremiah J.

Ray Dr. Paul C.

Shewmon Dr. Chester P. Siess Nr. David A. Ward

I'

~