ML16340D752
| ML16340D752 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/12/1983 |
| From: | Krechting J STONE & WEBSTER ENGINEERING CORP. |
| To: | Harold Denton, Maneatis G, Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16340D655 | List: |
| References | |
| DSC-501, NUDOCS 8308300605 | |
| Download: ML16340D752 (4) | |
Text
STONE 8 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET.
BOSTON. MASSACHUSETTS ADDRESS ALI CORRESPONDENCE TO P.O. BDX 2325. BOSTON'ASS. 02IO7 805TON NCW YORK CHCRRY HILL.N.J, 0CN VCR CHICACO HOUSTON PORTLANO. ORCCON WASHINCTON. O.C.
W.U. TELEX; 94 OODI 94 0977 OC5ICN CON5TRVCTION RCPORTS CXAMINATION5 CON5VLTINC CNCINCCRINC Mr. G. A. Maneatis, Executive Vice President Facilities Development Pacific Gas and Electric Company 77 Beale Street San Francisco, CA 94106 August 12, 1983',O.
No.
14296 DCS-501 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U.ST Nuclear Regulatory Commission 7920 Norfolk Avenue
- Bethesda, MD 20114 Mr. J. B. Martin, Regional Administrator Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94956 Dr. W. E. Cooper Teledyne Engineering Services
.130 Second Avenue
- Waltham, MA 02254 Docket No 50-275 Diablo Canyon Unit 1
License No. DPR-76 SWEC AUGUST SEMIMONTHLY REPORT Gentlemen:
SWEC has issued no Open Item Reports since our last Semimonthly Report.
ry t ly yours, Z7 E. Krechting roject Engineer, iablo Canyon Nuclear Power Plant cc: ~Schierling (2)
R, R. Fray R, F, Reedy R,
B Hubbard M. Axelrad E. T. Denison M. J. Strumwasser D. F. Fleischaker J
R Phillips J.
R. Reynolds B. Norton A
C, Gehr J ~ Roesset asoesomos ssosas PDR ADOCK 05000275 PDR
A. (
1
~ +
STONE 8 WEBSTER ENGINEERING CORPORA7ION 245 SUMMER STREET.
BOSTON.
MASSACHUSETTS ADDRESS ALI CORRESPONDENCE TO P.O. BOX 2325.
BOSTON. MASS. 02107 W. U. TELEX; 94.000I 94.0977
$ 05TON NCW YORK CHCRRY HILL. N.J.
OCNVCR CHICAOO HOUSTON PORTLAND, OR COON WASHINOTON. O.C.
Mr. G. A. Maneatis, Executive Vice President Facilities Development Pacific Gas and Electric Company 77 Beale Street San Francisco, CA 94106 OCSION CONSTRVC'TION RCPORT5 CXAMINATIONS CONSVLTINO KNOINCCRINO August 12, 1983 J,O.
No, 14296 DCS-501 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U S. Nuclear Regulatory Commission 7920 Norfolk Avenue
- Bethesda, MD 20114 Mr. J.
B Martin, Regional Administrator Region V U.ST Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94956 Dr. W. E. Cooper Teledyne Engineering Services 130 Second Avenue
- Waltham, MA 02254 Docket No. 50-275 Diablo Canyon Unit 1
License No. DPR-76 SWEC AUGUST SEMIMONTHLY REPORT Gentlemen:
SWEC has issued no Open Item Reports since our last Semimonthly Report.
ry t ly yours, Z7 ED Krechting roject Engineer, iablo Canyon Nuclear Power Plant cc:
H. Schierling R. R. Fray R
F. Reedy R. B. Hubbard M. Azelrad (2)
ED T. Denison M. J. Strumwasser D. F. Fleischaker J.
R. Phillips J. R. Reynolds B. Norton A. C. Gehr J. Roesset
A