gPR 211983 Docket Nos.:
50-275 50-323 Mr. Davis S. Fleischaker Post Office Box 1178 Oklahoma City, Oklahoma 73101
Dear Mr. Fleischaker:
JKni ght RMattson LRubenstein SGoldberg LChandler DEisenhut DISTRIBUTION
. Document Control (50-275/323)
NRC PDR L PDR NSIC PRC System LBP3 Reading JLee HSchierling BBuckley E.Jordan, IE J.Taylor, IE ACRS (16)
HDenton
= ECase RVollmer Your letter to me of March 28, 1983 transmitted eight allegations by an anonymous individual, regarding the Diablo Canyon Nuclear Power Plant.
He have subsequently provided a copy of it to the Commission by Board Notification 83-48, dated April 4, 1983.
Through the same process, copies were provided to the members of the Atomic Safety and Licensing Appeal Board, the Atomic Safety and Licensing Board and to the Diablo Canyon servi ce list.
lte are presently performing a preliminary evaluation of the allegations and we have made initial inquiries regarding some of the allegations while conducting a previously scheduled audit of work performed by the Diablo Canyon Project.
tie intend to meet with Pacific Gas and Electric Company in the near future to solicit their evaluation on these matters.
The meeting will be noticed and open to interested parties.
Although some of the allegations described by you are specific, it is necessary that we obtain clarification of certain of the allegations in order to perform an adequate evaluation.
tie therefore request that you attempt to arrange a meeting between the anonymous individual and members of the staff if at all possible.
If requested by the individual, the NRC will take all steps possible and permitted to preserve his or her anonymity.
Please advise me as soon as possible and please have the individual contact me (301-492-7672) directly so that we can further discuss this matter.
Your cooper ation in this matter is appreciated.
Sincerely, Original signed by Barrel,l G, gise~+~
8305 f806>>
pp275 8g04gi Pgp 181DOCK 050 PDR i
H cc:
See next page
- See previous concurrence Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation OFFICE/
SURNAME/
DATE Q DL:LB)/3*
.8Schi.ar3.i'ng 4/
/83 NRG FORM 318 (10.80) NRCM 0240 DL:LB83*
~ ~
~ 0 ~i
~ ~ ~
~ ~
yj..(Knighto 4/
/83 OELD*
AD/L*
~ ~ ~i
~
TMNovak DG ut
~ ~
~ ~ ~ ~\\ ~ 0 ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
4/
/83 4g
/83 4/
/83 OFFlCIAL RECORD COPY USOPO: 1991~<<960
r~i~ e
+I'
) ~
\\
I y
h
DISTRIBUTION Document Control (50-275/323)
NRC PDR L PDR NSIC PRC System Docket N
50-375 a d 50-323 LB83 Reading RVollmer JLee JKnight HSchierling RMattson l)r. David
. Fleischaker BBuckley LRubenstein Post Office ox 1178
DGEisenhut
Dear Mr. Fleisc aker:
HRDenton EGCase Your letter to me f March 28, 1983 transmitting eight allegations regarding the Diablo Canyon t uclear Power Plant by an anonymous individual was also provided to thecComm ssion by Board Notification 83-48, dated April 4, 1983.
Through the same proc ss copies were provided to the members of the Atomic S'afety and Licensing A peal Board. the Atomic Safety and Licensing Board and to the Diablo Canyoh'service list.
At this time we are.pqrfor. ing-a preliminary evaluation of the allegations.
Our staff made initial inquipies regarding some of the allegations while conducting a previously sche8 led audit of work performed by the Diablo C;<nyon Project.
'He intend to eet with Pacific Gas and Electric Company in the near future to solict their evaluation on these matters.
The meeting will be noticed and open to inte ested parties.
Although some of the allegations d
cribed by you',) are specific, it is necessary that we obtain clarification of cer in of the allegations in order to perform our evaluation.
tte therefore request/that you attempt to arrange a meeting between the anonymous individual and members of the staff. If requested by the individual, we will take all steps possible and permitted to preserve his or her anonymity.
Please advise me as soon as possible or ha the individual contact me directly so that we can arrange a meeting.
Sincere cc:
See next page Darr'ell G. Eis hut, Director Division of Lice sing Office of Nuclear eactor Regulation
- See previous concurrence.
OFFICElI SURNAMEP oATE lF DL:LBb3 Kc'h'i'e'r')'i'iig7y 4/
/83 DL:LB83*
GlJKni gh ton
~ ~ ~ ~ ~
4/
/83 AD/L*
TMNovak 4/
/83 OELD" 4/
/83 DL/D DGEisenhut 4/
/83
~
~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 0 ~
NRC FORM 318 (10~) NRCM 0240 OFFIClAL RECORD COPY
'SGPO: 1)~1~960
0
~.
a, I
I
/
I I
f/!
/
f J
r
//
/
/
~
1+
r t
~
Docket Nos.:
50-275 and 50-323 Mr. David S. Fleischaker Post Office Box 1178 Oklahoma City, Oklahoma 73101
Dear Mr. Fleischaker:
JKnight RMattson LRubenstein LChandler SGoldberg DGEisenhut DISTRIBUTION Document Control 50-275/323 NRC PDR L PDR NSIC PRC System LB¹3 Rdg HSchierling JLee BBuckley
HRDenton EGCase RVollmer Your letter to me of flarch 28, 1983 transmitting eight allegations egarding the Diablo Canyon Nuclear Power Plant by an anonymous individual>was also provided to the Comission by Board Notification 83-48 dated April 4, 1983.
Through the same process copies were provided to the members 6f the panel of the Atomic Safety and Licensing -Appeal Board and the Atomi Safety and Licensing Board and to the Diablo Canyon service list.
l At this time we are performing a preliminary evaluatipn of the allegations.
Our staff made initial inqui;ries regarding some of tPe allegations while conducting a previously scheduled audit of work performed by the Diablo Canyon Prospect.
We intend to meet with Pacific+as and Electric Company in the near furture to solict their comments on PYese matters.
The meeting will be noticed and open to interested parti s.
Although most of the allegations as descry bed;by you are specific, it would be very helpful if further clarificatipn could be provided.
We therefore request that you attempt to arrange p~meeting between the anonymous individual and a few selected members of our staff.
We would not object to other parties being present at such a meeting ig that is agreeable with the individual.
In this regard.
the meeting cou)8 also take place in your offices.
We would prefer to have an official tr nscript taken of the meeting, Please advise me personall as soon as possible of you have been successful in arranging a meeting a
if you have any question regarding our request.
Sincerely, cc:
ee next page Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
- See previous concurrence:
OFFICE SURNAME Q DATE$
LB¹3 Sch Ter'TTng7y'/
/83 LB¹3*
GHKriighCUtI 4/.
/83 AD/L*
TWo'v'a'f<""""
4/
/83 OELD*
4/
/83 DL/0 DGEisenhut 4/
/83 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~5 990
~
~
YgC' L
P
~
I" A
,/
(j Docket Nos.
50-275 50-323 Mr. David S. Fleischaker Post Office Box 1178 Oklahoma City, Oklahoma 73101
Dear Mr. Fleischaker:
RVol lmer JKntght RMattson LRubensteln LChandler SGog dberg D Eisenhut Di'stribution:
Document Control (50-275/323)
NRC PDR L PDR NSIC PRC System LBIII3 Rdg HSchierling JLee BBuckley
- EJordan, I;E
HRDenton EGCase Your letter to me of March 28, 1983 transmitting eight llegations regarding the Diablo Canyon Nuclear Power Plant by an anonymou individual has been provided to the Commission by Board Notification 8 -48 dated April 4, 1983.
Through the same process copies were provided to he members of the panel of the Atomic Safety and Licensing Appeal Board ay the Atomic Safety and Licensing Board and to the Diablo Canyon ser ice list.
At this time we are performing a prelimigary evaluation of the allegations.
We intend to meet with Pacific Gas and ectric Company in the near future to solicit*their comments on these ma er s.
The meeting will be noticed and open to interested par'ties.
Although most of the allegations s described by you are specific, it would be very helpful if further clair fication could be provided.
We therefore request that you attempt to ap range a meeting between the anonymous individual and a few selected members yf our staff.
We would not object to other parties being present at such a m~ting if that is agreeable with the individual.
In this regard, the meetjhg could also take place in your offices or at an otherwise agreeable lot;Stion.
We would recomend that a transcript be taken of the meeting, if th t is acceptable.
Please advise me py sonally as soon as possible if you have been successful in arranging a
m Sting and if you have any question regarding our request.
Sincerely, cc:
See next page Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation
- See tached concurrence sheet for previous concu ences OFFICE/
SURNAME$
OATE $
LBIII3 Schierli g
4i f$s3 "
LB83*
GKnighton AD/L*
fWo'v'a'k 4/
/83 4/
/83 OELD*
4/
/83 DL/D Dt'5 s'enliut 4/
/83 NRC FORM 318 tIO-80) NRCM 0240 OFFlCIAL RECORD COPY I
USGPO: 1991-939 999
4
~
~
I 4
t V
0 Docket Nos.:
50-275 and 50-323 DISTRIBUTION
'T l.'late Docu'ment Control 50-275/323 NRC PDR L PDR NSIC PRC System LB83 Reading
.~
JKnight HSchierling P
Rtkattson JLee
~~
LRubenstein BBuckley
~
LChandler Ilr. David S. Fleischaker
- Jordan, IE P
SGoldberg Post Office Box !1;178 Taylor, IE y DGEisenhut Oklahoma City, Oklahoma 73101
Dear IIr. Fleischaker:
RVollmer,'our letter to me of I<arch 28, 1983 transmittifg eight allegations regarding the Diablo Canyon Nucl,ear Power Plant by an anonymous individual was also provided to the Commission by Board Notificqtion 83-48 dated April 4, 1983.
Through the same process copies were provid8d to the members of the panel of (
the Atomic Safety and Licensing Appeal Boa/d and the Atomic Safety and Licensing Board and to the Diablo Canyon service list.
At this time we are performing a prelimikary evaluation of the,'..allegations.
'e intend to meet with Pacific Gas and,;Zlectric Company in the near furture to solict their comments on these mat)ers.
The meeting will be noticed and open to interested parties.
Although most of the allegations as~described by you are specific, it would be very helpful if further clarification could be provided.
We therefore request that you attempt to arrang9e a meeting between the anonymous individual and a few selected members of ouf staff, We would not object to other parties being present at such a meetingjif that is agreeable with the individual.
In this regard.
the meeting could also take place in your offices.
We would prefer to have an official trykscr ipt taken of the meeting.
Jf Please advise me personally 5s soon as possible if you have been successful in arranging a meeting and i'f you have any >question regarding our request.
Sincerely, j
//
cc:
See next page'arrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation OFFICE/
SURNAMEP DATE Q DL:LBg3 T
Schierling/y 4!I$isr----
D
~
ghton 4i j~j'83- "-
L:A Tt vak 4/'3 OELD LChandl er 4/
/83 DL:DIR
'DGEisenhut 4/
/83 NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~9M
0
~
~
0 t
f)'
d DISTRIBUTION Document Control g 275/323 NRC PDR L PDR NS IC PRC System LB83 Read ing J Kn 1 ght HSchi erl i ng Rtlattson JLee LRuben s tei n BBuckley LChandl er I1r. David S. Flei schaker
- Jordan, IE SGo'ldberg Post Office Box 1178
Dear Hr. Fleischaker:
RVollmer Your letter to me of harch 28, 1983 transmitting eight allegations regarding tb 1
b1 E
y b
1 y
y1 t by y
1 dt fd provided to the Commission by Board Notification 83-48 dated April 4, 1983.
Through the same process copies were provided to the members of the panel of the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Board and to the Diablo Canyon service list.
~
~
~d Docket Nos.:
50-275 and 50-323 At this time we are performing a preliminary evaluation of the allegations.
We intend to meet with Pacific Gas and Electric Company in the near furture to solict their co))ments on these matters.
The meeting will be noticed and open to interested parties.
Sincerely, Although most of the allegations as described by you are specifip, it would be very helpful if further clarification could be provided.
We therefore request that you attempt to arran'ge a meeting between the anonymous individual and a few selected members of our staff, lte would not object to other parties being present at such a meeting if hat is agreeable with the individual.
In this regard, the meeting could a s
take place in your offices We would
~byfyddbdt y tb ftb tt y~
L ~
f Please advise me personally as so n as possible if you have been success ul in arranging a meeting and if yo have any question regarding our request.
cc:
See next page Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Peactor Regulation OFFICE)
SURNAhIE $
DATE $
DL: LBr'3 )Q Schierling/y 4/'
/83 DL'k ghton 4/iz /83 DL:AD/L Tt1Novak 4/
/83 OELD LChandler 4/0 /83 DL'DIR DGEisenhut 4/
/83 NRC FOAM 318 (10.80) NACA C240 l
OFFICIAL RECORD COPY USQI'D. 1991 33,'"Id it
t
~
4 H
I
Diablo Canyon Philip A. Crane, Jr.,
Esq.
Pacific Gas 5 Electric Company Post,gffice Box 7442 San Francisco, California 94120 CC:
Nr. Malcolm H. Furbush Vice President - General Counsel Pacific Gas 5 Electric Company Post Office Box 7443 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederi ck Ei ss 1 er, President Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, CA 93401 Nr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, CA 93401 Harry N. Willis, Esq.
Seymour 8 Willis 601 California Street, Suite 2100 San Francisco, CA 94108 Nr. Richard Hubbard MHB Technical Associates Suite K
1725 Hamilton Avenue San Jose, CA 96125 Mr. John Marrs, Managing Editor San Luis Obispo County Telegram Tribune 1321 Johnson Avenue P.
O.Box 112 San Luis Obispo, CA 93406 Resident Inspector/Diablo Canyon NPS c/o U. S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, Cali for nia 93424 Ms; Raye Fleming 1920 Mattie Road Shell Beach, California 93440 Joel
- Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 West Pico Boulevard Third Floor Los Angeles, California 90064 Paul C. Valentine, Esq.
321 Lytton Avenue Palo Alto, California 94302 Nr. William E.
Cooper Project Manager
- 5511 Teledyne Engineering Services 130 Second Avenue Waltham, Massachusetts 02254 Herbert H. Brown, Esq.
Hill, Christopher 8 Phillips, P.C.
1900 N Street, N.W.
Washington, D.
C.
20036 Mr. Dick Blankenburg Editor
& Co-Publisher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 93420 Mr. James
- 0. Schuyler Vice President
- Nuclear Generation Department Pacific Gas 5 Electric Company P. 0.
Box 7442 San Francisco, California 94120
~:
~
~
0
Philip A. Crane, Jr.,
Es Diablo Canyon Bruce Norton, Esq.
Suite 202 3216 North 3rd Street Phoenix, Arizona 85012 Mr.
W.
C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburg, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Mr.
Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D.
C.
20036 Regional Administrator - Region V
U.S.
Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Dr. Jose Roesset 3506 Duval Road Austin, Texas 78759 Michael J.
Strumwasser, Esq.
Special Council to the Attorney General State of California 3580 Wilshire Boulevard, Suite 800 Los Angeles 90010 Mr. Thomas H. Harris San Jose Mercury News 750 Ridder Park Drive San Jose, California 95190 Mr. Mark Gottlieb California Energy Commission 1111 Howe Avenue, NS 27 Sacramento, California 95825
C oi 4
i'