ML16340D172

From kanterella
Jump to navigation Jump to search
Forwards Diablo Canyon Unit 1 Independent Design Verification Program,Electrical Equipment Analysis, Interim Technical Rept 33,Rev 0
ML16340D172
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 02/18/1983
From: Denison E
ROBERT L. CLOUD ASSOCIATES, INC.
To: Harold Denton, Engelken R, Maneatis G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V), Office of Nuclear Reactor Regulation, PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16340D173 List:
References
P105-4, NUDOCS 8302240278
Download: ML16340D172 (4)


Text

Y 0

REGULATO FORMATION DISTRIBUTION M (RIDS)

ACCESSION NBR:8302240278 DOC ~ DATE: 83/'02/15 NOTARI'ZED:

NO FACIL:50 275 Diablo Canyon Nuclear Power Planti Unit ii Pacific Ga AUTH BYNAME AUTHOR AFFILIATION DENISONi E, Robert L< Cloud Associatesi Inc.

RECIP ~ NAME RECIPIENT AFF IL'IATION DENTONiH ~ RE Office of Nuclear Reactor Regulationg Director ENGELKENrHSR ~

Region 5g Office of Director MANEATISiG ~ AD Pacific Gas 8 Electric Co, DOCKET ¹ 05000275

SUBJECT:

Forwards "Diablo Canyon 'Unit 1 Independent Design Ver ification ProgramiElectrical Equipment Analysis'" Interim Technical Rept 33iRev 0 ~

DISTRIBUTION 'CODE:

D013S COPIES RECEIVED:LTR g ENCL ~~ SIZE:

TITLE: Diablo Canyon (50 275)

Independent Des er>

cation Program NOTES:J Hanchett 1cy PDR Documents.

05000275 REC IP IENT ID CODE/NAME NRR LB3 BC BUCKLEYpB~

06 INTERNAL: ELD/HDS2 IE/DEQA D IR NRR SCHIERLING NRR/DE/EQB 13 NRR/DE/MEB 15 NRR/DE/SEB 17 DSI/ICSB REG FIL 00 R

AMI/MIB COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

0 RECIPIENT ID CODE/NAME NRR LB3 LA IE/DEP/EPLB IE/DRP D IR NRR/DE/CEB NRR/DE/GB NRR/DE/QAB NRR/DS I/ASB NRR/DS I/PSB RGN5 COPIES LT'TR ENCL

.1 11 1

1 1

12 1

1 10 1

1 16=

1 1

18 1

1 1

08

"'2 2

EXTERNAL: ACRS NRC PDR NTIS NOTES:

19 16 16 02 1

1 1

1 1

1 LPDR NSIC 03 05 2

2 1

TOTAL NURSER OF COPIES REQUIRES:

LTTR AA ENCL

M l,li yg i'

l!

W W 4) fll

'I( ~

,oi4'ttrr If W

)!

f I M

M( f W

i I 'r ll M

44 (f

'l f'g*) )) IWg if 4

~ ) I'f'M I)'if' Irli (1,4

'f f(f(M I

g,t g',I Ir" b fo il b'I "1 lb'MW.

( i, ftMI,

.I I I If, IW HH\\ ~~OHI~

WC%

M W

(9 il f 0 i, l W 0 hf 'II' 4

jul IM>>

,( f,f lf

.(

lr If H

, ff MM X I HH ff' M'

)'f '(HI(

I fl jl )

'I Il

ll jf I)M

% Ill It M b.M

)

W t/ b'I rig.t

'r I

M (M

Wl

)

M I

I i!t il M

M M

RO8ERT L. CLOUD ASSOCIATES. INC.

125 UNIVERSITVAVENUE BERKELEY. CALIFORNIA94710 I4151 641 9296 P 105-4 February 18, 1983 Mr. G.A Maneatis, Executive Vice President Facilities and Electric Resources Development Pacific Gas and Electric Company 77 Beale Street San Francisco, CA 94106 Mr. H.R. Denton, Director Office of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission Washington D.C.

20555 Mr. H.R. Engelken, Regional Administrator Region V

U.S.

Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California.

94596 Docket No. 50-275 Diablo Canyon Unit 1

License No.

DPR-76 Gentlemen:

Enclosed please find Interim Technical Report No.

33 on Electrical Equipment Analysis, Rev. 0, issued by Robert L. Cloud Associates for the Independent Design Verifi-cation Program (P105-4-839-033).

In addition please note that the cover letter for the Pump ITR referenced ITR ¹109.

The correct

number, as shown on the ITR is 32.

Yours truly, Edward Denison Enclosure cc:

R. Fray (45)

R.

Reedy F. Sestak W. Cooper (5)

H. Schierling (40)

M. Strumwasser D. Fleischaker J.

Reynolds B. Norton A. Gehr 8302240278 8302i8 PDR ADOCK 05000275 p

PDR

/f