NOV MBER 10, 1982 NRC COMMISSION MEETING
SUBJECT:
Pacific Gas and Electric Company's Comments on the October 20, 1982 NRC Staff Briefing to The Commissioners and SECY 82-414 Docket No. 50-275 Diablo Canyon Unit No.
1 License No. DPR-76 PURPOSE:
As notified by Memorandum dated October 21, 1982 from the Secretary of the Commission, PGandE is providing its r
comments on the October 20, 1982 NRC Staff Presentation to the Commission regarding the Diablo Canyon Design Verification Program Phase II Recommendations.
BACKGROUND:
On October 19, 1982, the NRC,Staff,
- PGandE, and participants in the Independent Design Ve'rification Program (IDVP) met in Bethesda, Maryland to discuss the status of this case and to characterize the findings to date of the IDVP and PGandE's Internal Technical Program (ITP).
On October 20i 1982, the NRC Staff briefed the NRC Commissioners on SECY 82-414.
The Staff's paper described the IDVP and. I'ZP, and.presented recommendations with respect to both Phase I and Phase II of the programs.
The Staff recommended that the Commission approve the Phase II Program.Plan and contractors with certain modifications and recommended that certain of the Phase II efforts be completed prior to restoration of the low power license.
/
The Staff concluded in that meeting that completion of the activities identified in its presentation would provide reasonable assurance that no major deficiencies remain undetected and would demonstrate that the plant is designed and constructed in accordance with the license application.
.DISCUSSION: 'GandE supports the Phase II Program recommendations made'y the Commission Staff in SECY 82-414 and presented to the Commission on October 20, 1982.
PGandE believes that it is fully responsive to the Commission's Order of November 19, 1981, mandating an independent review of Diablo Canyon Nuclear Power Plant.
Additionally, PGandE supports the Staff recommendations specifying the requirements which should be completed prior to restoration of the low power license and issuance of a full power license.
A
~ description of PGandE's request for a stepwise licensing
- approach, which is consistent with Staff recommendationsi is summarized.
.< 8211,'180153 8211 10
~'"PDR
'ADOCK 05000275
~ p PDR
s'r
I.
Introduction PGandE is in agreement with the recommendations of the Staff on the Phase II Program Plan and the requirements for restoration and issuance of the low power and full power licenses, respectively.
PGandE also agrees with the Staff's characterization of the status and findings of the Phase I and Phase II programs.
Pursuant to the Staff recommendations for licensing, we request that the Commission adopt a stepwise licensing schedule for fuel loading, low power testing<
and full power licensing.
This process will provide sufficient flexibilityto complete the remaining work by PGandEi the independent design verification program (IDVP), and the Sta'ff without unnecessary delay.
II. 'tatus of Verification Activities and Summar of Findin s to Date The Phase I efforts:related to seismic design are nearly complete.
PGandE's efforts have been documented in its Phase I Final Report which has been, and continues to be, submitted in installments since September 1, 1982.
This report describes the seismic reanalysis and includes the scope, criteria, methodology, and analysis results pertaining to structures, piping, supports, HVAC, electrical and mechanical equipment, and instrumentation tubing.
The findings related to seismic, design are being addressed and resolved by the PGandE corrective action program.
These corrective actions, as required by the Phase I program plan, will be verified by the IDVP and the NRC Staff.
The Phase II'fforts which concentrate on non-seismic design are nearing completion.
Although this effort has identified specific finding5, preliminary evaluations by the IDVP as stated by Dr.
Cooper to the Staff on October 19, 1982 have indicated that generic concerns'similar to those in seismic design are not being found.
A construction quality assurance (CQA) verification effort was
.voluntarily undertaken to provide added confidence in the adequacy
~ of the plant's construction.
Consistent with NRC Region V
recommendations, about 250 attributes of construction activities were 'selected for quality verification.
A plan was developed to, evaluate two of the major contractors'A programs and to sample various equipment, structures, and contractors'ecords for documentary evidence of adherence to approved procedures as well as
'hysical evidence of conformance with design intent.
The sample was specifically chosen to include the reactor coolant system pressure boundary and the containment structure,
'two of the major barriers that prevent radioactivity from reaching the environment.
These CQA evaluations are now nearing completion.
The potential findings-to date are minor in nature and, while some are still being evaluated, fall into the following categories:
1.
Potential findings that can be resolved as additional information is located.
For example, ultrasonic testing records on some tubing did not show a type of testing which appeared to be required.
Further investigation revealed that the requirement was deleted by a change order not in the site file.
2.
Minor documentation discrepancies that, nevertheless, meet design document requirements.
For example, records of inspections being documented in a manner different from procedure or items that do not meet requirements in a contractor's procedure that, nevertheless, comply with design document requirements.
3.
Deviations from a procedure or specification without a record of Engineering concurrence.
For example, the case of surface imperfections in structural concrete which exceed the requirements of construction specifications..-
In such a case, a
simple engineering evaluation can be performed and documented to resolve the issue.
~
None of the CQA findings to date appear to have any significant safety impact or to requi're significant plant modifications.
In summary, the seismic, non-seismic and construction quality assurance verification activities are nearing completion.
When the verification aspects of these programs, are sufficiently complete and appropriate corrective actions for fuel loading are taken, reasonable assurance will exist that fuel load activities can proceed without'ny undue risk to the public health and safety.
IIZ. PGandE's Ste wise Licensin Schedule r
The original licensing concept, as contempla'ted by the Commission's November 19, 1981 Order (Phase I) and the NRC Staff's November 19, 1981 Letter (Phase II), was comprised of a two-phase licensing
- process, with Phase I activities to be completed prior to restoration of the low power license and Phase II activities to be completed prior to issuance of a full power license.
In the Staff's presentation, this concept was somewhat modified with the result that total separation between the two phases as originally envisioned is no longer appropriate.
The Staff has recommended a
modified version of stepwise'icensing for low power testing and full power operation Additionally, the Staff has concurred with PGandE's proposal to complete prior to fuel loading the reviewf
- analysis, and modificatiqns for those systems required for fuel load.
The basic changes proposed by the Staff are the expansion of Phase II activities and the addition of a requirement that the review and evaluation effort for Phase II activities be sufficiently complete prior to restoration of the low power license to provide reasonable'assurance that no major deficiencies remain undetected.
4 A literal adoption of this proposal would delay fuel loading without commensurate benefit to the public health. and safety.
While PGandE agrees with the scope of the Staff's recommended activities for restoration of the low power license, we believe that not all of these activities are necessarily required for fuel load and cold, system testing.
To avoid unnecessary
- delay, we request that only a subset of these activities need be, completed prior to restoration of the license with the remainder to-be completed prior to initial criticality and low power testing.
This proposed course of action could save as much as twenty weeks based upon the typical startup experience of recently licensed PWR's.
We submit that this is a reasonable scheduling refinement which comports with the Staff's recommendations.
We agree, however, that the Phase II findings would have to be sufficiently complete prior to restoration of the low power license to give reasonable assurance that no major
,ideficiencies remain undetected.
Accordingly, we request that the Commission adopt a three-step schedule which provides the flexibilityfor completing remaining work by PGandE, the IDVP and the Staff without a penalty in terms of unnecessary delay.
Specifically, the steps would be:
A..
Complete requirements to allow for restoration of the low power license and authority for loading fuel and cold system testing.
B.
Complete the remaining requirements for initial criticality and low power testing under the authority of. the low power license.
C.
Complete requirements.for issuance of a full power 'license.
Licensin Ste A - Re uirements for Restoration of Low Power License and Authoritv for Loadina Fuel and Cold S stem Testin PGandE requests that the low power license be restored when the following'requirements have been accomplished.
The license would
'allow fuel.loading and cold system testing and require specific
. additional conditions to be satisfied prior to initial criticality and low power testing.
l.
IDVP Reports a)
A statu's report demonstrating that'the activities required by the'Commission's November'19, 1981 Order (Phase I) are sufficiently complete to provide reasonable assurance that no major deficiencies remain undetected.
This report would
- document'he 'completion of verification efforts related to the initial sample and any additional, verification or sampling activities, document closure of all issued
- findings, and concur with the corrective actions for
'ystems requiied for fuel loading and cold system testing.
-(SECY 82-414, Fig. 3, Item A.l)
0 b)
A status report demonstrating that the activities required by the Staff's November 19, 1981 Letter (Phase II) are sufficiently complete to provide reasonable assurance'that no major deficiencies remain undetected.
(SECY 82-414, Fig.
3, Items B.l-B.3) c)
A status report on the review of the PGandE/ Bechtel Quality Assurance Program for engineering and design.
(SECY 82-414, Fig. 3, Item C.l) d)
e)
A status report on'he PGandE Quality Assurance Construction Review.
A status report is required by the Staff prior to issuance of a full power license and a final report is required by the Staff during full power operation.
(SECY 82-414, Fig. 3, Item C.2)
A status report which verifies that the as-built modifications conform with the design
(+~s-built walk-down) for systems required for fuel load and cold system testing.
A status report is required by the Staff prior to
'ssuance of a full power license and a final report is required by the 'Staff during full'power operation.
(SECY.82-414, Fig. 3, Item C.3)
A final report which verifies the PGandE and Westinghouse interface controls.for the. transfer of design, information.
(SECY 82-414, Fig. 3, Item C.5) g)
h) final report which verifies PGandE's control and application of the Hosgri spectra.
(SECY 82-414, Fig. 3, Item C. 6)
A status report by the IDVP which -.verifies PGandE's control
/
and application of non-Hosgri Spectra for the design earthquake and the double design earthquake.
A final report is required by the Staff prior to the issuance of a full power license.
(SECY 82-414, Fig. 3, Item C;7) 2.
PGandE Reports a)
A final report on the activities of the PGandE Internal Technical Program r'elated to the Commission's November 19, 1981 Order 4Phase I).
(SECY 82-414, Fig. 3, Item B.l-3) 3.
Hodifications a)
Completion of. those modifications necessary to assure that systems specifically identified as required for fuel load and cold system testing are seismically qualified and operational.
In addition, systems identified as supportive for fuel load and cold system'testing will be operational.
(SECY 82-414, Fig. 3, Item C.4)
0 J
~I
-6 4.
NRC Concurrence a)
NRC Staff concurrence that fuel load and cold system testing may proceed.
These steps will provide reasonable assurance for the protection 'of the public health and safety during fuel loading and cold system testing.
The IDVP status reports will respond to the Staff's recommendations that Phase I and II and other expanded verification activities should be sufficiently complete to provide assurance that no major deficiencies remain undetected.
The status reports will provide comprehensive information concerning findings associated with these ongoing activities and the necessary basis for making an informed licensing decision.
In particular, these status reports would:
"1.
summarize the review activities completed, 2.
describe any findings-to date and their signi.ficance, 3.
discuss their apparent
- causes, and 4.
summarize PGandE actions which are planned to resolve those findings associated with required systems and equipment.
Additionally, the reports describe the activities which remain to be completed, provide an evaluation of'ossible generic concerns and assess the potential.significance of these generic concerns.
Licensin Ste B Re uirements for Initial Criticalit and Low Power Testin under the Authorit of the Low Power License The following 'tems would be included as conditions of the restored low power license.
Crj.ticality would not be initiated 'until these items have been completed; 1'DVP.Reports a)
A final report as required by the Commission's November 19, 19'81 Order (Phase.I)
(SECY 82-414, Fig.
3< Item A.l) b)
A status'eport which verifies that the as-built modifications conform with the design (as-built walk-down) for systems required for initial criticality and low power testing.
A.status report is required by 5he Staff prior to the issuance of a full power license and a final report is requiied by the Staff during full power operation.
~
(SECY 82-414, Fig. 3, Item C.3)
2.
Modifications a)
Completion of those modifications necessary to assure that systems required for initial criticality and low power testing are seismically qualified and operational.
These systems are identified in the Technical Specifications as required for operating modes 2 through 6.
(SECY 82-414, Fig.
3, Item C.4) 3.
NRC Concurrence a)
NRC Staff concurrence that initial criticality and low power testing may proceed.
These items will satisfy both the requirements of the Commission's November 19, 1981 Order and the Staff's recommendations to the Commission in SECY 82-414.
Licensin Ster>
C Requirements for Issuance of a Full Power License The following items will'be completed prior to the issuance of 'the full power license..
l.
IDVP Renorts a)
A final report as required by the November 19, 1981 Letter (Phase II).
(SECY 82-414, Fig. 3, Items B.l-B.3) b)
A final report on the review of the PGandE/Bechtel Quality Assurance Program for engineering and design.
A final report is required by the Staff during full power operation.
(SECY-82-414, Eig. 3,.Jtem C.l) c)
d).
A final report on the PGandE Quality Assurance Construction Review.
A final report is required by the Staff during full power operation.
(SECY 82-414, Fig. 3, Item C.2)
A status report which verifies that the as-built modifications conform with the design (as-built walk&own) for systems required for full power operation.
A final report will be submitted as required by the Staff during full power operation.
(SECY 82-414, Fig. 3, Item C.3) e)
A final report which verifies PGandE's control and application of non-Hosgri spectra for the design earthquake and double design earthquake (SECY 82-414> Fig. 3, Item C.7)
0 2.
PGandE Re rts a)
A final report by PGandE as required by the Staff's November 19, 1981 Letter (Phase II).
(SECY 82-414, Fig.
3, Item B.1-3) 3.
Modifications a)
Completion of those modifications necessary to assure that systems required for full power operation are seismically qualified and operational.
These systems are identified in the Technical Specifications as required for operating modes 1 through 6.
Modifications not required for full
'ower operation will be completed as reasonably practicable (SECY 82-414< Fig. 3, Item C.4) 4.
NRC Concurrence a)
NRC Staff concurrence that ascension above 5% rated power may proceed.
These items will satisfy the Staff's requirements in the November 19, 1981 letter as modified by the Staff's recommendations in their presentation, for issuance of a full power license.
IV.
Conclusion We urge the Commission to approve the Staff's recommendation for the Phase II program plan and contractors and to adopt the specific requirements suggested above for restoration of the low'power
- license, low power testin'g, and issuance of a full power license.
1 PG&E COMMEM78 OM OC70BER 20 CO.MMISSllOM MEEl IIMG AMD SEC"f-82-414:
't. RECGMMENI9 APPRGVAIL GF PHASE III
.PlAN AS.PRGPGSEO O'lI'TAFF
- 2. CQNCUR THATTHE SCQPE GF ACTIVITIES
. RECGMMENDED BY SYAFF PRQVIIDES REASGNABILEASSURANCE THAYII3IIABLG CANYGN IIS DESIIGNED AND CGNSTRUCTED TG ILIICENSIINGCRIIYERIA
- 3. ADGPT SPECIFIIC REGUIIREMENTS FQR RESTGRAYIIGN GF YHE ILGW PGWER ILmCENSE, ILGW PGWER TESYSNG, AND ISSUANCE GF YHE FUILILPGWER ILIICENSE
STEP&)SE I.ICEMSIMG SCHEDULE II I
STEP A CGMPILEYE REQUIREMENTS TG AILILGWRESYGRAYIIGN GIF THE ILGW PGWER ILICENSE AND AUTHGBmTV IFGR IFUEIL ILGADAND CGLD SVSTEM TESYIING STEP 8 CGMPLEYE REMAINING REO.UmREMENTS IFGB INIITIIAL CRITIICAILIITV.AND ILGW PGWEB TESYIING UNDER YHE AUYHGBITVGIF THE ILGW PGWER LICENSE
STEP A: BESTGIHE LOW/ PGWER LICENSE
.IIMCLUDIIMG.AUYHGIRllITVYG ILGAD FUEL AND CGNDUCY CGLD SVSTEM YESTIING I
I I
I. IDVP REPORTS:
'I. IDVP PHASE I ANI3 PHASE II STATUS REPORTS+
'ON-HOSGRI SPECTRA FIWALRE> Om.S Om r Ga-EIVV IWTeaVACE AWO HOSGm SPECTRA II. PGQ.E PHASE I FINALREPORT III. MODIFICATIONSFOR FUEL LOAD AMDCOLD SYSTEM TESTING IV. NRC STAFF CONCURRENCE TO PROCEED lMTH FUEL LOAD ApltQ COLD SYSTEM TESTING "STATUS REPORTS TO DEMONSTRATE THATACTIVITIESARE SUFFICIENTLY COMPLETE TO PROVIDE REASONABLE ASSURANCE THAT NO lVIAJOR DEFICIENCIES REMAIN UNDETECTED.
I ay@P 8: IlgmALCBmCAIL(TYAMD LOW r Owen rESTIMG I
I-t I
II. IIDVP REPORTS:
- g. PHASE II FIINALREPORT
- 2. SYAYUS REPORT GN AS-BUlllLT VERIIFIICATIIGNGF MGII3IIFICAY!ONS IIII. MGDIIFIICAYIIGNSFGR 1GW POWER TESTING e
IIII. NRC SYAFF CONCURRENCE TG PROCEED WITH IINIIYIIALCRIITIICALIITYAND LGW POWER YESYIING
0 0
~
P
STEP C:!SSsUAMCE OF FVILl, POWER k.lCEMSE I
I I
I ll. PGQE PHASE II! FlMALREPGRY IIII. MGIDIFICATIGNSFGR FULL PGWER
- l. lDVP REPGRTS.
- 1. PHASE II) FlMALREPGRY
- 2. FIINAI REPGRTS GN lTP GA, CGNSTRUCTIGN GA, AS-BUllY VERIIFICAYlGMGF
'GDIFlCAYlGNS, AMD NGM-HGSGRI SPECTRA
~ '
November 10, 1982 SCHEDULING NOTES TITLE:
Comments from Parties on Phase II Reverification
. Program for Diablo Canyon SCHEDULED:
PURPOSED:
1:00 p.m.,
Wednesday, November 10,
- 1982, Public Meeting To receive parties'omments on Phase II of the proposed reverification plan.
SPEAKERS:
PGGE (20 min) 1.
G. Maneatis 2.
H. Friend 3.
B. Norton Governor Brown* (20 min) l.
A.. Brown 2'.
R. Hubbard
'Joint Intervenors (20 min) 1.
D. Fleischaker 2.
J.
Reynolds 3.
G. Roesett l
h
- The speakers for Governor Brown have requested that they and the'oint In'tervenors be allowed to'ake a joint presentation;
12/81 TPZSSNZTTAL TO-
/
Documen Con ol Desk, 016 Ph'lips ADVmC"-D COZ'Z TO:
/ 7 The Publ,ic Document Room
~
DATZ:
f/ g'~
~
cc: OPS'ile From; SECY OPS Branch C&R (Natalie)
Attached wre copies oZ a Commission meeting
-anscript/s/
and related mee m~g 'document/s/.
They a
e being forwarded for entry on the Daily Accession List and placement in the Public Document Room.
No oDer distribution is requested oz requirea..
Fxisting DCS identification numbers are lis"ed on the individual documents vhereve=
'known- '.
Meeting Tit1e:
~~TiNG DATE:
XT"8 DESCRiPTiON:
//
ro Copies
. (1 Advanced To PDR:
- 0 ipina1
- Documen" olica e>
DCS COPES:
of each Checked)
May be Du Duo*
2.'.
~
o ZZ.'LQC.
~
/
~
~
~ *
= *
(PDR is advanced one of each document, two of each SECX paper.}
~:379Wi~.lh.
h>h
>. l;, h h>, >hIh>h~h!>>1h>h>i'; >h>h>, h'hhAY9T>hvar
0'