ML16340C875

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP M-3 Re Chlorine Release,Ep M-5 Re Tsunami Warning & EP M-8 Re Containment Emergency Personnel Hatch
ML16340C875
Person / Time
Site: Diablo Canyon  
Issue date: 09/23/1982
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML16340C874 List:
References
NUDOCS 8210210044
Download: ML16340C875 (4)


Text

'I

~-~ 0

&ACT. P IC G.AS A.ND ZLZC TRIC C O MPA.KT LAW DEPARTMENT - 77 BEALE STREET, 31ST FLOOR

~

SAN FRANCISCO, CALIFORNIA 94106

~

(415) 78 I 4211 September 23, 1982 Mr. R.

H. Engelken, Regional Administrator U.S. Nuclear Regulatory Commission, Region V

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re:

Docket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2

Dear Mr. Engelken:

In accordance with Section V, "Implementing Procedures,"

of 10 CFR 50, Appendix E, we are submitting three copies of the updates to the detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan as listed on Attachment 1.

Concurrently, ten copies of each update are being submitted to Mr. Harold R. Denton, Director of Nuclear Reactor Regulation.

82i02i0044 821001 PDR ADOCK 05000275 F

PDR

"41,

lo g Mr. R.

H. Engelken September 23, 1982 Page 2

Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Very truly yours, Philip A. Crane, Jr.

Attachments cc w/att:

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Service List cc w/o att:

Mr. F. J. Miraglia, Jr.

Licensing Branch No.

3 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

0