ML16340C706
| ML16340C706 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/01/1982 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML16340C707 | List: |
| References | |
| TASK-AS, TASK-BN-82-68 BN--82-68, BN-82-68, NUDOCS 8207210610 | |
| Download: ML16340C706 (8) | |
Text
Docket No.:
50-275 JUf. 1 1882 Distributi on:
See attached sheet MEMORANDUM FOR:
Chairman Palladino Commissioner Gilinsky Commissioner Ahearne Commissioner Roberts Commissioner Asselstine FROM:
SUBJECT:
Darrell G. Eisenhut, Director Division of Licensing Office of Nucleav Reactor Regulation INFORMATION ITEMS REGARDING THE DESIGN VERIFICATION PROGRAM - PHASE 1
FOR DIABLO CANYON, UNIT 1 (Board Notification No. 82-68)
In accordance with present NRC procedures fov Board Notifications, the fo.llowing is enclosed for information of the Commission:
Teledyne Engineering Ser vices, Second Phase 1 Interim Techn)cal Report on Evaluation of the guality Assurance Program and Imple-mentation Reviews, transmitted by letter dated June 24, 1982.
This submittal provides information on the status of the Independent Design Verification Program (IDVP) activities for Diablo Canyon, Unit 1.
The infor-mation is re] evant to the safety issue of the design adequacy of Diablo Canyon, Unit 1.
This is the subject of Commission Order CLI-81-30 which is the basis for the IDVP.
=The..staff is evaluating the information as part of its ongoing review of the IDVP efforts and will report on the results prior to reinstatement of the license.
The material does not pertain to those matters that weve resolved by ALAB 644.
1 1
~ ~II
~
~
~~
~II~
~ 1 I>> ~I I~~
~
!i II~ ~ ~
-82072iobio..8a07aa PDR ADaCX aSOOaa7S P
PDR Enclosure 8 cc:
See next page
Contact:
Hans Schierling, ONRR 49-27238 Orig]nial sIgned bJ1 Darrell G. Eisenhut, Dir.ector Division of Licensing Office of Nuclear Reactor Regulation OFFIGEP DL:LB¹3 SURNAME/ BBuckl ey: ph aavEQ 6/ gp /82 DL:
3 0 ~
'rag 1 i a
, /82 DL:
\\
I ~ i ~ ~ ~
RTedesco 6/ g) 82 DL:
~
~ ~ ~ ~ ~
D ut 6/
/82
~ i ~ ~ ~ i ~ ~ ~ ~ ~ 'I ~
~
~
~ ~ ~ ~ ~ ~ ~ ~
'I ~
NRC FORM 318 <10/80) NRCM 0240 OFFICIAL RECORD COPY 0 USGF0: 198(h-329.824
1
'uk ~)g h
kl S
l
The Commission
Enclosure:
Teledyne Engineering Services, Second Phase 1 Interim Technical Report on Evaluation of the guality Assuraace Program and Implementation Reviews transmitted by letter dated June 24; 1982 l
cc:
ASLB ASLBP SECY OGC OPE EDO Board Servic'e List
.OFFICEI SURNAME/
DATEP NRC FORM 318 IIO/BOINRCM 0240
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \\ ~
~
~
~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~
~
~
OFFICIAL RECORD COPY J
~ ~
~ ~ ~ ~
\\ ~ 0 l
~ ~ ~ ~ ~
~ 4 ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
~
~ ~ ~
~ ~ ~ ~ ~
0 USGPO: 19~29-824
a J ~ s
D~RIBUTION OF BOARD liOTIFICA7
'.'-; ~a~
Diablo Canyon - ASLB Docket Nos. 50-275, 50-323 ACRS Members Atomic Safety and Licensing Appeal Panel Atomic Safety and Licensinq Board.
Panel Docketing and Service Section Document Hanagement Branch Hrs. Elizabeth Apfelberg Andrew Baldwin, Esq.
Richard E. Blankenburg Wayne A. Soroyan Hr. Glenn 0. Bright Herbert H. Brown, Esq
~
Dr. John H.
Buck Philip A. Crane, Jr.,
Esq.
Hr. Frederick Eissler David S. Fleischaker, Esq.
Hrs.
Raye Fleming Arthur C. Gehr, Esq.
Bryon S.
Georgiou
'f;.. Hark Gottlieb Hr. Richard B. Hubbard Dr.
W.
Reed Johnson Janice ED Kerr, Esq.
Lawrence
- 0. Garcia, Esq./
.Dr. Jerry Kline Mr. John Harrs, Thomas ST Hoore, Esq.
'.Bruce Norton, Esq.
Joel R. Reynolds, Esq.
John R. Phillips, Esq.J Hr.
James
- 0. Schuyler
.Mr. Gordon Silver Paul C. Valentine, Esq.
Harry H. Willis, Esq.
John F. 'Wolf, Esq.
Malcolm H. Furbush Resi dent Inspector, Diabl o Canyon W.
C. Gangloff Mr.
Owen H. Davis Mr.
Dr.
Mr Mr Dr.
Or.
Dr.
Mr.
Dr.
Or.
Dr.
Mr.
Dr.
Dr.
Mr.
Dr.
Myer Bender Max W. Carbon
'esse C. Ebersole Harold Etherington William Kerr Harold W. Lewis J.
Carson )hrk llilliam M. Mathis Da de W. Noel ler David Okrent Milton S. Plesset Jeremiah J.
Ray Paul G. Shewron Chester P. Siess Davis A. Ward Robert C. Axtmann
BOARD NOTIFICATION BN-~(~~
- w/enclosure Document Control (50-A7@*
ARC PDR*
L PDR*
TERA*
NSIC*
Branch Reading*
Branch Chief*
Project Manager*
Licensing Assistant
.R. Tedesco/J.
Kerringan D. Eisenhut/R.
Purple M. Williams H. Denton/E.
Case*
PPAS J.
Youngblood A. Schwencer F. Miraglia E.
Adensam
- 3. Mille~
- k. Vollmer H.
Thompson R. Mattson S.
Hanauer
- Attorney, OELD*
OI8IE Regional Administrator Resident Inspector W. J. Dircks, EDO (3)
E. Christenbury, OELD*
J. Scinto, OELD*
cc:
Board Service List
tp4 p
0 I
l t