JUN 11 1982
>4 Distribution:
Document Control 50-275/323 v NRC PDR L PDR TERA NSIC Mr. David F. Fleischaker, Esq.
LB¹3 Fi 1 e.
DEisenbut/RPurpl e Post Office Box 1178 FMirag 1 ia ACRS (16)
Oklahoma City, Oklahoma 73101 JLee Resident 'Inspector HSchierling HRDenton/EGCase
Dear Mr. Fleischaker:
BBuckley Service List RTedesco This is in response to your May 4, 1982 letter in which you expressed concern that the April 30, 1982 meeting between the staff, Pacific Gas
& Electric Company and Bechtel Power Corporation was not transcribed.
You also stated that the ground rules for meetings concerning the seismic design verification program established in October 1981, provide for a verbatim transcript.
More-over, you stated that your decision to attend such meetings relied, in part, on your understanding that verbatim transcripts would be forwarded to you for your information.
Based on a review of the October 9, 1981 meeting transcript, we could not identif/',y where such ag arrangement was made requiring verbatim transcripts of all meetings concering the seismic design verification program.
- However, it was agreed that all parties in this proceeding would be notified of such meetings.
The decision to transcribe a meeting will be at the staff's discretion depending on the nature of the meeting.
The purpose of the April 30, 1982 meeting was to describe the role Bechtel would assume in the completion of work required to bring both Diablo Canyon units into commercial operation and its relationship with the independent reviewer.
As such, it is not directly a part of the verification program.
A summary of the April 30 meeting has been prepared and a copy is attached for your information.
In the future, we will notify all parties in this proceeding whether future meetings will be transcribed.
Sincerely, orlgfnnl $lgned by II IL Denton
Enclosure:
April 30 Meeting Summary Harold R. Denton, Director Office of Nuclear Reactor Regulation DL DL:AD:L DL:LB¹3 DL:DIR OFFICE/
SURNAME DATEP BBuckley:ph 5/24/82 FMiragli a 5/24/82
- RTedesco
~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~
~ ~ 0 ~ ~
~
5/24/82
- See previous page for concurrences/initials NRR:DD ECase 5/28)CY NRR: DIR
)45m'r'4 k' j'-'""/N."'ELD
'+1:Chan'dl'e'r""
bf7/82"""""
NRC FORM 318110/801 NRCM 0240 OFFICIAL RECORD COPY
- USGFOI 198~29.824
J
~C f
lh
'P II I
'L 0
I "C
I J
)
)
DISTRIBUTION Document Control(50-275/323)
NRC PDR L PDR TERA NSIC Regional Adm.
Resident Inspt.
ACRS(16)
HRDenton/EGCase Service List Based on a review of the October 9, 981 meeting transcript, we could not identify where such an arrangement as made requiring verbatim transcripts of all meetings concerning the s smic design verification program.
- However, it was agreed that all parties
'n this proceeding would be notified of such meetings.
The decision to re ire transcripts will be at the staff's discretion depending on the ature of the meeting.
The purpose of the April', 1982 meeting was to describe the role Bechtel would assume in the corn etion of work required to bring both Diablo Canyon units into coomercial peration and its relationship with the independent reviewer.
A summary f the April 30 meeting has been prepared and a copy is attached for your i formation.
In the future, we will notify all parties in this proceeding ther future meetings will be transcribed.
Sincerely, LB83 Reading FNiraglia JLee David F. Fleischaker, Esq.
HSchi ing Post Office Box 355 BBu ey Pitts burgh, Pennsyl vania 15230 R
des co Eisenhut/RPurple
Dear 11r. Fleischaker:
- Attorney, OELD I&E This is in response to your Hay 4, 1982 letter in whi you expressed concern that the April 30, 1982 meeting between the staff, P cific Gas
& Electric Company and Bechtel Power Corporation was not tra cribed.
In that meeting, Bechtel Power Corporation discussed its role in e completion of the Diablo Canyon project, Units 1 and 2.
You also state that the ground rules for meetings concerning the seismic design verif ation program established in October 1981, provide for a verbatim trans ipt.
Moreover, you stated that your decision to attend such meetings rel'ed, in part, on your understanding that verbatim transcripts would be forw ded to you for your information.
Encl ure:
Apr 30 t1eeting mmary Harold R. Denton," Director Offi'ce of Nuclear'eactor Regulation OFF ICS P SUBNAMS$
OATS $
.pj,.:.
BBuckley:lb
~ o ~ o ~ o ~ ~
F ql ia
~ ~
~ ~ssoo ~ o ~ oo ~ ooo 0
~ ~
o 2oe ~ o ~ o ~ ~
co
~
oo
~ ~
~ o ~ o ~ ~ ~
~ ~
..95JP:.'t./.82.....
~
~
~ ~ o ~ ~ ~ ~ oo ~ o ~ ~
is enhut Wo
~ ~ ~ ~ o ~ oo ~ ~ ~ ~ ~ ~ ~ ~ o
.....05/pK/82...
~ ~ oNR
~\\ ~ ~ ~ o ~ o
. ~~,.E..i Ps%......
ra~q
...05,...82.......
~ ~ oNRRoooooooooooo oo
.HBDt;neman.......
~05 /o o o o o /o82 o ~ o o o o 0
LD
~
~
~ ~ o ~\\ ~ ~ o\\ o o ~ o ~ o\\go
~ o ~'A\\ ~ ~ o\\\\ o o ~ o ~\\ O ~ ~ o ~ o ~
6/ ~
/82
~ o ~ ooooo ~ ioooo ~ ooooooooo NRC FORM 318 {10-80) NRCM 0240 1
OFFlClAL RECORD COPY USOPO: 1981~s060
h
Nr. Halcolm H. Furbush Vice President - General Counsel Pacific Gas 5 Electric Canpany P.O.
Box 7442 San Francisco, California 94120 cc:
Philip A. Crane, Jr.,
Esq.
Pacific Gas 8 Electric Company P.O.
Box 7442 San Francisco, California 94120 Janice E. Kerr, Esq.
California Public Utilities Commission 350 t4-.Aliister Street San Francisco, California 94102 DI.AELO,CAWYOtt Nr. Frederick Eissler, President Scenic Shoreline Preservation Conference, Inc.
4623 Nore tlesa Drive Santa Barbara, California 93105 Ns. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Nr. Gordon A. Silver his.
Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry tl. Willis, Esq.
Seymour 8 Millis 601 California Street, Suite 2100 San Francisco, California 94108 Nr. Ri chard Hubbard tlHB Technical Associates Suite K
1723 Hamilton Avenue San Jose, Cali fornia 95125 tlr. John tlarrs, Nanaging Editor San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P.
0.
Box 112 San t.uis Obispo, California 93406
4
lhr. Malcolm H. Furbush cc:
Resident Inspector/Diablo Canyon NPS c/o U. S. Nuclear Regulatory Commission P. 0. Box 369
&vila Beach, Cali fornia 93424 Ms. Raye Fleming 1920 Mattie Road Shell beach, California 93440 Joel
- Reynolds, Esq.
John R. Phillips, Esq.
Center for Law in the Public Interest 10951 Vest Pico Boulevard Thira Floor Los Angeles, California 90064 Paul C ~ Valentine, Esq.
321 Lytton avenue Palo Alto, California 94302 Mr. 'byron S.
Georgi ov Legal Affairs Secretary Governor's Office State Capitol Sacramento, Cali fornia 95814 Herbert H. Brown, Esq.
Hil1, Chri stopher h Phill i ps, P.C.
1900 li Street, N.V,.
washington, D.C.
2OU36 lir. Dick Bl ankenburg, Editor 6 Co-Publ i sher South County Publishing Company P. 0.
Box 460 Arroyo Grande, California 9342U Mr. James
- 0. Schuyler Vice President
- Nuclear Generation Department Pacific
( as 5 Electric Company P.U.
Box 7442 San Francisco, California 94120 P~
bruce Norton, Esq.
Suite 202.
3216 North 3rd Street Phoenix, Arizona 85012
Mr. Malcolm H. Furbush Mr.
W.
C. Gangloff Westinghouse Electric Corporation P. 0.
Box 355 Pittsburgh, Pennsylvania 15230 David F. Fleischaker, Esq.
P. 0.
Box 1178 Oklahoma City, Oklahoma 73101 Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Mr. Owen H. Davis, Director Federal Agency Relations Pacific Gas and Electric Company 1050 17th Street, N.W.
Suite 1180 Washington, D.c.
20036
~
~
~
~