ML16340C611
| ML16340C611 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/16/1982 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML16340C612 | List: |
| References | |
| NUDOCS 8206170417 | |
| Download: ML16340C611 (10) | |
Text
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-27%
323 ]
PACIFIC GAS,& ELECTRIC COMPANY
'(Diablo Canyon Nuclear Power Plant, Units 1
5 2)
Receipt of Petition Under 10 CFR 2.206
[7590-013 Notice is hereby given that by petitions dated May 12 5 25, 1982, Mr. Joel Reynolds on behalf of the Joint Intervenors to the Diablo Canyon Nuclear Power Plant licensing proceedings, filed a request for
'issuance of an order to Pacific Gas E Electric Co. to show cause why it should not be required to submit an amendment to its operating license applications to reflect recent changes in the organization and manaoement of the Diablo Canyon project.
In accordance with the procedures specified in 10 CFR
$ 2.206, appropriate action wil.l be taken on this request within a reasonable time.
A copy of the request is available for inspection in the Cormission's Public Document Room 1717 H Street,N.W.,
Washington, D.C.
20555 and at the local public document room for the Diablo Canyon plant at the San
~ 8206i70417 820&i&
PDR *DOCK 050002/5 A
k 1
g
, 4 F
T t
'u Luis Obispo County Free Library, 888 Morro Street, San Luis Obispo, California 93406.
Dated at Bethesda, Maryland this /g day of June, 1982 FOR THE NUCLEAR REGULATORY COMMISSION 0rigina1 signed bP Harold R. Denton, Director Office of Nuclear Reactor Regulation
I
~
s
~
g
~
, ~.g
NUCLEAR REGULATORY CONHISSION fDocket Nos. 50-275&
323 ]
PACIFIC GAS
& ELECTRIC COhPANY (Diablo Canyon Nuclear Power Plant, Units 1
& 2)
Receipt of Petition Under 10 CFR 2.206
[7590-013 Notice is hereby given that by petitions dated May.12
& 25,
- 19S2, ter. Joel Reynolds on behalf of the Joint Intervenors to the Diablo Canyon Nuclear Power Plant licensing proceedings, filed a request for issuance of an order to Pacific Gas
& Electric Co. to show cause why it should not be required to submit an amendment to its operating license appl icati ons to re f1 ect recent changes in the organi zati on and management of the Diablo Canyon project.
In accordance with the procedures specified in 10 CFR
$ 2.206, appropriate action will be taken on this request within a reasonable 'time.
A copy of the request is available for inspection in the Cormission's Public Document Room 1717 H Street,N.W.,
Washington, D.C.
20555 and at the local public document room for the Diablo Canyon plant at the San
1 ge
~
l
I I
0 gO Luis Obispo County Free Library, 888'Horro Street, San Luis Obispo, California 93406.
FOR THE NUCLEAR REGULATORY COMMISSION Dated at Hethesda, liaryland this
/(u day of June, l982 I
Qriginal signe'd bp:
Harold R. Denton, Director Office of Nucl.ear Reactor Regulation a
)
1 I
~ l Et I
E'
~
g
~ ~
4 v>Q 4'
4 l'/4%
t
,',I M.4 4 ~
I
~ )
t t
~
4'VQ tf V4 IVE V
\\
4 4
IIf~l )IV I tt';I I, '.
FROM:
Joel R. Reynolds Center for'aw in The Public Interest ACTION CONTROL COMPL DEADLINE ACKNOWLEDGMENT INTERIM REPLY DATES 6/4/82 i1885 DATE OF DOCUMENT 512 82 4)[
4 - a >
< V'41, I "'
H IR I Itjj 4*
4 4 4
TO;
'Harold Denton OOCUMENTICOPY NO.
NUMBER OF PAGES POSTAL REGISTRY. NO.
CLASSIFIED DATA CLASSIFICATION CATEGORY 0
NSI 0 RD 0 FRD ASSIGNED TO:
'ATE Cunnin am,E D
1878 Eisenhut 6 3 82 INFORMATIONROUTING Dpn on l,
PPAS 2.
Hanauer-. ;
3.
hfattson
- 4. 'ollmer DESCRIPTION Otl LETTER Q MEMO P REPORT P OTHER
- 2.206 - Show Cause why PG&E should not be directed to file forthwith the requisite
,amendments to the pending operating
-license application 8f for Diablo Canyon 4 v
'4 FINALREPLY FILE LOCATION PREPARE FORSIGNATURE OF:
CHAIRMAN Q
EXECUTIVE DIRLCTOA OTHERE~Qj:Qll SPECIAL INSTRUCTIONS OR REMARKS NO LEGAL OBJECTIONS NOTIFY:
0 EOO AOMINd, COAAES GA EXT.
COMMENTS, NOTIFY:
EXT.
DATE ASSIGNED'TO:
0 YES 0
NO JCAE NOTIFICATIONRECOMMENDED:
LEGALREVIEW 0
FINAL n
COPY 44 4
~
NRC FORM 232 (11-75)
'I4<EV 4'I 4
tVI'XECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL 4~V Hr DO NOT REMOVE 7IIIS COPY 4
C A
)